Walnut Unified School District Walnut HS Hybrid

400 Pierre Rd, Walnut, CA 91789

Plant Summary Information

Walnut Unified School District Walnut HS Hybrid is ranked #638 out of 747 solar farms in California in terms of total annual net electricity generation.

Walnut Unified School District Walnut HS Hybrid generated 482.4 MWh during the 3-month period between September 2022 to December 2022.

Plant NameWalnut Unified School District Walnut HS Hybrid
Utility NameTesla Inc.
LocationLos Angeles County, CA
Initial Operation DateFebruary 2020
Last Update Dec 2022
Annual Generation 1.9 GWh
Annual Consumption 7.0 k MMBtu
Ranked #9,604 out of 11,249 Power Plants Nationwide
Ranked #4,348 out of 5,158 Solar Power Plants Nationwide
Ranked #1,350 out of 1,501 California Power Plants
Ranked #638 out of 747 California Solar Power Plants
Fuel Types Solar

Map of Walnut Unified School District Walnut HS Hybrid

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Walnut Unified School District Walnut HS Hybrid.

Create Your Account Today

Monthly Net Generation for Walnut Unified School District Walnut HS Hybrid

Walnut Unified School District Walnut HS Hybrid Details

Summary Information
Plant NameWalnut Unified School District Walnut HS Hybrid (63510)
Plant Address400 Pierre Rd Walnut, CA 91789
UtilityTesla Inc. (60947)
Latitude, Longitude34.02188, -117.85051
Generation Dates on FileFeb 2020 to Dec 2022
Initial Operation DateFebruary 2020
Annual Generation 1.9 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerSouthern California Edison Co (17609) CA
Grid Voltage 33.30 kV / 36.60 kV
Energy StorageYes

Generator PV1 Details Operating February 2020

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipWholly Owned by Other Entity
Nameplate Capacity1.8 MW
Summer Capacity1.8 MW
Winter Capacity1.8 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateFebruary 2020
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Time From Cold Shutdown To Full Load10M
Solar Details
Fixed TiltYes
Azimuth Angle260
Tilt Angle5
DC Net Capacity2.2 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity1.5 MW
Virtual Net Metering AgreementNo

Generator ST1 Details Operating February 2020

TechnologyBatteries
Prime MoverBattery
OwnershipWholly Owned by Other Entity
Nameplate Capacity0.5 MW
Summer Capacity0.5 MW
Winter Capacity0.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateFebruary 2020
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceElectricity used for energy storage
Time From Cold Shutdown To Full Load10M
Energy Storage Details
Nameplate Energy Capacity MWH0.5
Maximum Charge Rate0.1 MW
Maximum Discharge Rate0.1 MW
Storage TechnologyLIB
Nameplate Reactive Power Rating0.1
Storage Enclosure TypeCS
Load ManagementYes
Backup PowerYes
Excess Wind And Solar GenerationYes

Walnut Unified School District Walnut HS Hybrid Plant Owners

Owner NameAddressGeneratorOwnership
Solar Integrated Fund VI, LLC6800 Dumbarton Cirlce, Fremont, CA 94555Generator PV1100.00%
Solar Integrated Fund VI, LLC6800 Dumbarton Cirlce, Fremont, CA 94555Generator ST1100.00%

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#4338Auriga Community SolarSlayton, MN1.9 GWh
#4339Town of Norfolk MA at Medway BranchNorfolk, MA1.9 GWh
#4340USS Haven Solar LLC CSGSt. Cloud, MN1.9 GWh
#4341Kapaa Photovoltaic ProjectKapaa, HI1.9 GWh
#4342Rushford VillageRushford Village, MN1.9 GWh
#4343Sandy Cross Solar, LLCElm City, NC1.9 GWh
#4344Romark PA SolarHazle Township, PA1.9 GWh
#4345Canandaigua Westbrook Solar ArrayCanandaigua, NY1.9 GWh
#4346FastSun 8 CSGCourtland, MN1.9 GWh
#4347Flodquist Community Solar LLC CSGLindstrom, MN1.9 GWh
#4349Svenski Solar (Hybrid)Crawford, NY1.9 GWh
#4350USS B&B Solar LLC CSGMorgan, MN1.9 GWh
#4351Panda Solar NC 1, LLCFairmont, NC1.9 GWh
#4352Hewlett-Packard (HP) - Andover, MAAndover, MA1.9 GWh
#4353Onset West Community Solar FacilityWareham, MA1.9 GWh
#4354Huneke CSG 2, LLCZumbrota, MN1.9 GWh
#4355Silver Lake GardenWaseca, MN1.9 GWh
#4356WilliamsonWilliamson, NY1.9 GWh
#4357RiverheadRiverhead, NY1.9 GWh
#4358Harmon DC Totowa NJTotowa, NJ1.9 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Walnut Unified School District Walnut HS Hybrid.

Plant NamePlant LocationAnnual GenerationDistance
Blacksand Generating FacilityBrea, CA48.9 GWh6.2 mi
Brea Expansion PlantBrea, CA269.6 GWh6.2 mi
Canyon Power PlantAnaheim, CA109.0 GWh11.3 mi
CSUF Nutwood SolarFullerton, CA3.5 GWh10.1 mi
CSUF State CollegeFullerton, CA1.7 GWh10.1 mi
CSUF TrigenerationFullerton, CA34.5 GWh10 mi
Gilead Sciences La Verne Rooftop SolarLa Verne, CA3.2 GWh6.5 mi
Industry MetroLink PV 1Industry, CA1.7 GWh1 mi
Irwindale Brew Yard, LLCIrwindale, CA2.8 GWh8.5 mi
Kroger La HabraLa Habra, CA2.0 GWh8.6 mi
MM West CovinaWest Covina, CA42.4 GWh3.3 mi
OLS Energy ChinoChino, CA12.5 GWh10 mi
Puente Hills Energy RecoveryWhittier, CA177.3 GWh9.9 mi
San Antonio West Solar RooftopChino, CA1.6 GWh11.6 mi
San DimasSan Dimas, CA4.0 GWh7.9 mi
Solar Photovoltaic Project #02Chino, CA758.3 MWh8.9 mi
Valley ViewYorba Linda, CA1.4 GWh8.5 mi
Walnut Creek Energy ParkIndustry, CA420.8 GWh5.5 mi
Weymouth Solar PlantLa Verne, CA6.2 GWh7.2 mi
Yorba LindaYorba Linda, CA6.4 GWh7.8 mi