Walnut Unified School District Walnut HS Hybrid

400 Pierre Rd, Walnut, CA 91789

Plant Summary Information

Walnut Unified School District Walnut HS Hybrid is ranked #658 out of 799 solar farms in California in terms of total annual net electricity generation.

Walnut Unified School District Walnut HS Hybrid generated 310.0 MWh during the 3-month period between September 2023 to December 2023.

Plant NameWalnut Unified School District Walnut HS Hybrid
Utility NameTesla Inc.
LocationLos Angeles County, CA
Initial Operation DateFebruary 2020
Last Update Dec 2023
Annual Generation 1.8 GWh
Annual Consumption 6.5 k MMBtu
Ranked #10,134 out of 11,852 Power Plants Nationwide
Ranked #4,807 out of 5,655 Solar Power Plants Nationwide
Ranked #1,394 out of 1,570 California Power Plants
Ranked #658 out of 799 California Solar Power Plants
Fuel Types Solar

Map of Walnut Unified School District Walnut HS Hybrid

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Walnut Unified School District Walnut HS Hybrid.

Create Your Account Today

Monthly Net Generation for Walnut Unified School District Walnut HS Hybrid

Walnut Unified School District Walnut HS Hybrid Details

Summary Information
Plant NameWalnut Unified School District Walnut HS Hybrid (63510)
Plant Address400 Pierre Rd, Walnut, CA 91789
UtilityTesla Inc. (57313)
Latitude, Longitude34.02188, -117.85051
Generation Dates on FileFeb 2020 to Dec 2023
Initial Operation DateFebruary 2020
Annual Generation 1.8 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerSouthern California Edison Co (17609) CA
Grid Voltage 33.30 kV / 36.60 kV
Energy StorageYes

Generator PV1 Details Operating February 2020

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipWholly Owned by Other Entity
Nameplate Capacity1.8 MW
Summer Capacity1.8 MW
Winter Capacity1.8 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateFebruary 2020
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Time From Cold Shutdown To Full Load10M
Solar Details
Fixed TiltYes
Azimuth Angle260
Tilt Angle5
DC Net Capacity2.2 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity1.5 MW
Virtual Net Metering AgreementNo

Generator ST1 Details Operating February 2020

TechnologyBatteries
Prime MoverBattery
OwnershipWholly Owned by Other Entity
Nameplate Capacity0.5 MW
Summer Capacity0.5 MW
Winter Capacity0.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateFebruary 2020
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceElectricity used for energy storage
Time From Cold Shutdown To Full Load10M
Energy Storage Details
Nameplate Energy Capacity MWH0.5
Maximum Charge Rate0.1 MW
Maximum Discharge Rate0.1 MW
Storage TechnologyLIB
Nameplate Reactive Power Rating0.1
Storage Enclosure TypeCS
Load ManagementYes
Backup PowerYes
Excess Wind And Solar GenerationP
Ac CoupledYes
Direct Support Of Another UnitYes
Direct Support Plant Id63510
Direct Support Gen IdPV1
Support T D AssetNo

Walnut Unified School District Walnut HS Hybrid Plant Owners

Owner NameAddressGeneratorOwnership
Solar Integrated Fund VI, LLC6800 Dumbarton Cirlce, Fremont, CA 94555Generator PV1100.00%
Solar Integrated Fund VI, LLC6800 Dumbarton Cirlce, Fremont, CA 94555Generator ST1100.00%

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#4797MSC-Chisago02 LLCTaylors Falls, MN1.8 GWh
#4798Valdosta PrisonValdosta, GA1.8 GWh
#4799Hayfield Solar I LLC CSGHayfield, MN1.8 GWh
#4800Studenski Community Solar LLC CSGSauk Rapids, MN1.8 GWh
#4801RockdaleWilliamsport, MD1.8 GWh
#4802Letchworth Solar ProjectGainesville, NY1.8 GWh
#4803Santa Rosa Junior College Petaluma SolarPetaluma, CA1.8 GWh
#4804Brenda Luhman - CSGZumbrota, MN1.8 GWh
#4805CA - Ventura Co CCD - Moorpark CollegeMoorpark, CA1.8 GWh
#4806Mud Garden SolarGaylord, MN1.8 GWh
#4808NaplesNaples, ME1.8 GWh
#4809Severson GardenWaseca, MN1.8 GWh
#4810350 Clark Solar, NG, LLCBudd Lake, NJ1.8 GWh
#4811Westport MA 2 Community SolarWestport, MA1.8 GWh
#4812Onset East Community Solar FacilityWareham, MA1.8 GWh
#4813Harmon DC Totowa NJTotowa, NJ1.8 GWh
#4814Novel Herickhoff Solar CSGOsakis, MN1.8 GWh
#4815Prairie Sky Solar FarmAndover, KS1.8 GWh
#4816WED Kingstown Solar I, LLC - WestRichmond, RI1.8 GWh
#4817Panda Solar NC 5, LLCFayetteville, NC1.8 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Walnut Unified School District Walnut HS Hybrid.

Plant NamePlant LocationAnnual GenerationDistance
Blacksand Generating FacilityBrea, CA45.1 GWh6.2 mi
Brea Expansion PlantBrea, CA245.4 GWh6.2 mi
Canyon Power PlantAnaheim, CA83.7 GWh11.3 mi
CSUF Nutwood SolarFullerton, CA2.6 GWh10.1 mi
CSUF State CollegeFullerton, CA1.5 GWh10.1 mi
CSUF TrigenerationFullerton, CA34.7 GWh10 mi
Gilead Sciences La Verne Rooftop SolarLa Verne, CA3.0 GWh6.5 mi
Industry MetroLink PV 1Industry, CA860.0 MWh1 mi
Irwindale Brew Yard, LLCIrwindale, CA1.4 GWh8.5 mi
Kroger La HabraLa Habra, CA1.6 GWh8.6 mi
MM West CovinaWest Covina, CA39.9 GWh3.3 mi
OLS Energy ChinoChino, CA10.7 GWh10 mi
Puente Hills Energy RecoveryWhittier, CA158.5 GWh9.9 mi
San DimasSan Dimas, CA24.9 GWh7.9 mi
San Dimas Wash Generating StationSan Dimas, CA2.9 GWh7.5 mi
Solar Photovoltaic Project #02Chino, CA482.7 MWh8.9 mi
Valley ViewYorba Linda, CA1.1 GWh8.5 mi
Walnut Creek Energy ParkIndustry, CA336.7 GWh5.5 mi
Weymouth Solar PlantLa Verne, CA5.0 GWh7.2 mi
Yorba LindaYorba Linda, CA5.0 GWh7.8 mi