Walnut Unified School District Walnut HS Hybrid
400 Pierre Rd, Walnut, CA 91789Plant Summary Information
Walnut Unified School District Walnut HS Hybrid is ranked #638 out of 747 solar farms in California in terms of total annual net electricity generation.
Walnut Unified School District Walnut HS Hybrid generated 482.4 MWh during the 3-month period between September 2022 to December 2022.
Plant Name | Walnut Unified School District Walnut HS Hybrid |
---|---|
Utility Name | Tesla Inc. |
Location | Los Angeles County, CA |
Initial Operation Date | February 2020 |
Last Update | Dec 2022 |
Annual Generation | 1.9 GWh |
Annual Consumption | 7.0 k MMBtu |
Ranked #9,604 out of 11,249 Power Plants Nationwide | |
Ranked #4,348 out of 5,158 Solar Power Plants Nationwide | |
Ranked #1,350 out of 1,501 California Power Plants | |
Ranked #638 out of 747 California Solar Power Plants | |
Fuel Types | Solar |
Map of Walnut Unified School District Walnut HS Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Walnut Unified School District Walnut HS Hybrid.
Monthly Net Generation for Walnut Unified School District Walnut HS Hybrid
Walnut Unified School District Walnut HS Hybrid Details
Summary Information | |
---|---|
Plant Name | Walnut Unified School District Walnut HS Hybrid (63510) |
Plant Address | 400 Pierre Rd Walnut, CA 91789 |
Utility | Tesla Inc. (60947) |
Latitude, Longitude | 34.02188, -117.85051 |
Generation Dates on File | Feb 2020 to Dec 2022 |
Initial Operation Date | February 2020 |
Annual Generation | 1.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 33.30 kV / 36.60 kV |
Energy Storage | Yes |
Generator PV1 Details Operating February 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 1.8 MW |
Summer Capacity | 1.8 MW |
Winter Capacity | 1.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Time From Cold Shutdown To Full Load | 10M |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 260 |
Tilt Angle | 5 |
DC Net Capacity | 2.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 1.5 MW |
Virtual Net Metering Agreement | No |
Generator ST1 Details Operating February 2020
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 0.5 MW |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 10M |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 0.5 |
---|---|
Maximum Charge Rate | 0.1 MW |
Maximum Discharge Rate | 0.1 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 0.1 |
Storage Enclosure Type | CS |
Load Management | Yes |
Backup Power | Yes |
Excess Wind And Solar Generation | Yes |
Walnut Unified School District Walnut HS Hybrid Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Solar Integrated Fund VI, LLC | 6800 Dumbarton Cirlce, Fremont, CA 94555 | Generator PV1 | 100.00% |
Solar Integrated Fund VI, LLC | 6800 Dumbarton Cirlce, Fremont, CA 94555 | Generator ST1 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4338 | Auriga Community Solar | Slayton, MN | 1.9 GWh |
#4339 | Town of Norfolk MA at Medway Branch | Norfolk, MA | 1.9 GWh |
#4340 | USS Haven Solar LLC CSG | St. Cloud, MN | 1.9 GWh |
#4341 | Kapaa Photovoltaic Project | Kapaa, HI | 1.9 GWh |
#4342 | Rushford Village | Rushford Village, MN | 1.9 GWh |
#4343 | Sandy Cross Solar, LLC | Elm City, NC | 1.9 GWh |
#4344 | Romark PA Solar | Hazle Township, PA | 1.9 GWh |
#4345 | Canandaigua Westbrook Solar Array | Canandaigua, NY | 1.9 GWh |
#4346 | FastSun 8 CSG | Courtland, MN | 1.9 GWh |
#4347 | Flodquist Community Solar LLC CSG | Lindstrom, MN | 1.9 GWh |
#4349 | Svenski Solar (Hybrid) | Crawford, NY | 1.9 GWh |
#4350 | USS B&B Solar LLC CSG | Morgan, MN | 1.9 GWh |
#4351 | Panda Solar NC 1, LLC | Fairmont, NC | 1.9 GWh |
#4352 | Hewlett-Packard (HP) - Andover, MA | Andover, MA | 1.9 GWh |
#4353 | Onset West Community Solar Facility | Wareham, MA | 1.9 GWh |
#4354 | Huneke CSG 2, LLC | Zumbrota, MN | 1.9 GWh |
#4355 | Silver Lake Garden | Waseca, MN | 1.9 GWh |
#4356 | Williamson | Williamson, NY | 1.9 GWh |
#4357 | Riverhead | Riverhead, NY | 1.9 GWh |
#4358 | Harmon DC Totowa NJ | Totowa, NJ | 1.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Walnut Unified School District Walnut HS Hybrid.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Blacksand Generating Facility | Brea, CA | 48.9 GWh | 6.2 mi |
Brea Expansion Plant | Brea, CA | 269.6 GWh | 6.2 mi |
Canyon Power Plant | Anaheim, CA | 109.0 GWh | 11.3 mi |
CSUF Nutwood Solar | Fullerton, CA | 3.5 GWh | 10.1 mi |
CSUF State College | Fullerton, CA | 1.7 GWh | 10.1 mi |
CSUF Trigeneration | Fullerton, CA | 34.5 GWh | 10 mi |
Gilead Sciences La Verne Rooftop Solar | La Verne, CA | 3.2 GWh | 6.5 mi |
Industry MetroLink PV 1 | Industry, CA | 1.7 GWh | 1 mi |
Irwindale Brew Yard, LLC | Irwindale, CA | 2.8 GWh | 8.5 mi |
Kroger La Habra | La Habra, CA | 2.0 GWh | 8.6 mi |
MM West Covina | West Covina, CA | 42.4 GWh | 3.3 mi |
OLS Energy Chino | Chino, CA | 12.5 GWh | 10 mi |
Puente Hills Energy Recovery | Whittier, CA | 177.3 GWh | 9.9 mi |
San Antonio West Solar Rooftop | Chino, CA | 1.6 GWh | 11.6 mi |
San Dimas | San Dimas, CA | 4.0 GWh | 7.9 mi |
Solar Photovoltaic Project #02 | Chino, CA | 758.3 MWh | 8.9 mi |
Valley View | Yorba Linda, CA | 1.4 GWh | 8.5 mi |
Walnut Creek Energy Park | Industry, CA | 420.8 GWh | 5.5 mi |
Weymouth Solar Plant | La Verne, CA | 6.2 GWh | 7.2 mi |
Yorba Linda | Yorba Linda, CA | 6.4 GWh | 7.8 mi |