Wallace Dam
140 Wallace Dam Road, Eatonton, GA 31024Plant Summary Information
Wallace Dam is ranked #22 out of 27 hydroelectric power plants in Georgia in terms of total annual net electricity generation.
Wallace Dam is comprised of 6 generators and generated 488.0 MWh during the 3-month period between June 2024 to September 2024.
Plant Name | Wallace Dam |
---|---|
Utility Name | Georgia Power Co |
Location | Hancock County, GA |
Initial Operation Date | December 1979 |
Last Update | Sep 2024 |
Annual Generation | 15.7 GWh |
Annual Consumption | 148.9 k MMBtu |
Ranked #5,362 out of 11,852 Power Plants Nationwide | |
Ranked #837 out of 1,371 Water Power Plants Nationwide | |
Ranked #136 out of 239 Georgia Power Plants | |
Ranked #22 out of 27 Georgia Water Power Plants | |
Fuel Types | Water |
Map of Wallace Dam
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Wallace Dam.
Monthly Net Generation for Wallace Dam
Wallace Dam Details
Summary Information | |
---|---|
Plant Name | Wallace Dam (6087) |
Plant Address | 140 Wallace Dam Road, Eatonton, GA 31024 |
Utility | Georgia Power Co (7140) |
Latitude, Longitude | 33.3502, -83.1574 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | December 1979 |
Annual Generation | 15.7 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Southern Company Services, Inc. - Trans (SOCO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Oconee River |
Ash Impoundment | No |
Transmission / Distribution Owner | Georgia Power Co (7140) GA |
Grid Voltage | 230.00 kV |
Energy Storage | Yes |
Generator 6 Details Operating December 1979
Technology | Hydroelectric Pumped Storage |
---|---|
Prime Mover | Pumped Storage |
Ownership | Single Owner |
Nameplate Capacity | 52.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 53.6 MW |
Winter Capacity | 53.3 MW |
Minimum Load | 50.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 1979 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 5 Details Operating January 1980
Technology | Hydroelectric Pumped Storage |
---|---|
Prime Mover | Pumped Storage |
Ownership | Single Owner |
Nameplate Capacity | 52.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 53.6 MW |
Winter Capacity | 53.3 MW |
Minimum Load | 50.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1980 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 2 Details Operating December 1980
Technology | Hydroelectric Pumped Storage |
---|---|
Prime Mover | Pumped Storage |
Ownership | Single Owner |
Nameplate Capacity | 52.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 53.6 MW |
Winter Capacity | 53.3 MW |
Minimum Load | 50.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 1980 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 3 Details Operating February 1980
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 56.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 56.8 MW |
Winter Capacity | 57.1 MW |
Minimum Load | 54.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 1980 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 4 Details Operating April 1980
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 56.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 56.8 MW |
Winter Capacity | 57.1 MW |
Minimum Load | 54.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 1980 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 1 Details Operating July 1980
Technology | Hydroelectric Pumped Storage |
---|---|
Prime Mover | Pumped Storage |
Ownership | Single Owner |
Nameplate Capacity | 52.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 53.6 MW |
Winter Capacity | 53.3 MW |
Minimum Load | 50.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 1980 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Wallace Dam Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#827 | Warrensburg Hydroelectric | Warrensburg, NY | 16.1 GWh |
#828 | Weybridge | Weybridge, VT | 16.0 GWh |
#829 | Brule | Florence, WI | 16.0 GWh |
#830 | Moyie Springs | Moyie Springs, ID | 16.0 GWh |
#831 | High Falls (WI) | Town of Stephenson, WI | 16.0 GWh |
#832 | Waterbury 22 | Waterbury, VT | 15.9 GWh |
#833 | Gateway | Mountain Green, UT | 15.9 GWh |
#834 | James R Smith | Marquette, MI | 15.8 GWh |
#835 | Tunnel 1 Power Project | Nyssa, OR | 15.8 GWh |
#836 | Goat Lake Hydro | Skagway, AK | 15.8 GWh |
#838 | Sissonville Hydro | Potsdam, NY | 15.7 GWh |
#839 | Copper Dam Plant | Hood River, OR | 15.6 GWh |
#840 | Siphon Power Project | Bend, OR | 15.6 GWh |
#841 | Waterport | Waterport, NY | 15.6 GWh |
#842 | Tri-County Water Hydropower Project | Ridgway, CO | 15.5 GWh |
#843 | Pembroke Hydro | Suncook, NH | 15.4 GWh |
#844 | Buchanan (MI) | Buchanan, MI | 15.3 GWh |
#845 | Bowman | Nevada City, CA | 15.3 GWh |
#846 | Owyhee Dam Power Project | Nyssa, OR | 15.2 GWh |
#847 | White River Lock and Dam 2 | Locust Grove, AR | 15.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Wallace Dam.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
ADS Renewable Energy-Wolf Creek LLC | Dry Branch, GA | 17.7 GWh | 42.8 mi |
AL Sandersville LLC | Warthen, GA | 112.9 GWh | 23.4 mi |
Azalea Solar, LLC | Davisboro, GA | 12.2 GWh | 41.5 mi |
Bibb Williams | Macob, GA | 321.0 MWh | 41 mi |
Bulldog Solar LLC | Warrenton, GA | 159.0 GWh | 27.7 mi |
CII Methane Management III LFG Plant | Winterville, GA | 5.4 GWh | 40.2 mi |
Greene Durham | Union Point, GA | 5.1 GWh | 19.8 mi |
Lloyd Shoals | Jackson, GA | 70.3 GWh | 39.5 mi |
Mount Vernon Solar | Monroe, GA | 1.8 GWh | 43.6 mi |
Pleasant Valley Solar | Monroe, GA | 4.3 GWh | 41 mi |
Putnam Erickson | Eatonton, GA | 5.4 GWh | 13.7 mi |
Putnam Erikson 2 | Eatonton, GA | 5.7 GWh | 9.6 mi |
Scherer | Juliette, GA | 7.0 TWh | 42.6 mi |
Simon Solar Farm LLC | Social Circle, GA | 48.6 GWh | 37.5 mi |
Sinclair Dam | Milledgeville, GA | 120.2 GWh | 14.7 mi |
Tri-County Solar Facility | Eatonton, GA | 1.7 GWh | 13.7 mi |
Washington County Power LLC | Sandersville, GA | 88.5 GWh | 20.6 mi |
Washington County Solar | Sandersville, GA | 22.4 GWh | 35.7 mi |
Wilkinson DeFore | Gordon, GA | 4.6 GWh | 33.9 mi |
Wilkinson DeFore | Gordon, GA | 5.6 GWh | 33.5 mi |