WAL3432
951 W Belt Line Rd, Desoto, TX 75115Plant Summary Information
WAL3432 is ranked #284 out of 304 natural gas power plants in Texas in terms of total annual net electricity generation.
WAL3432 is comprised of 3 generators and generated 48.1 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | WAL3432 |
---|---|
Utility Name | Walmart Stores Texas, LLC |
Location | Dallas County, TX |
Initial Operation Date | September 2021 |
Last Update | Dec 2023 |
Annual Generation | 218.0 MWh |
Annual Consumption | 4.0 k MMBtu |
Ranked #11,287 out of 11,852 Power Plants Nationwide | |
Ranked #2,088 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #726 out of 754 Texas Power Plants | |
Ranked #284 out of 304 Texas Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of WAL3432
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for WAL3432.
Monthly Net Generation for WAL3432
WAL3432 Details
Summary Information | |
---|---|
Plant Name | WAL3432 (64924) |
Plant Address | 951 W Belt Line Rd, Desoto, TX 75115 |
Utility | Walmart Stores Texas, LLC (64315) |
Latitude, Longitude | 32.59292, -96.87984 |
Generation Dates on File | Sep 2021 to Dec 2023 |
Initial Operation Date | September 2021 |
Annual Generation | 218.0 MWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Motor Vehicle and Parts Dealers (441) |
Sector | Commercial Non-CHP (4) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 0.48 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | ATMOS ENERGY CORPORATION |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator GEN1 Details Operating September 2021
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 2021 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator GEN2 Details Operating September 2021
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 2021 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator GEN3 Details Operating September 2021
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 2021 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
WAL3432 Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2078 | HEB00110 | Missouri City, TX | 244.0 MWh |
#2079 | BUC00040 | Katy, TX | 243.0 MWh |
#2080 | HEB00038 | San Juan, TX | 241.0 MWh |
#2081 | Kent County Waste to Energy Facility | Grand Rapids, MI | 96.0 GWh |
#2082 | Ebensburg Power | Ebensburg, PA | 285.1 GWh |
#2083 | Oroville Cogeneration LP | Oroville, CA | 235.0 MWh |
#2084 | WAL768 | Katy, TX | 230.0 MWh |
#2085 | Sycamore (WI) | Madison, WI | 229.0 MWh |
#2086 | WAL414 | Wichita Falls, TX | 227.0 MWh |
#2087 | HEB00054 | Houston, TX | 220.0 MWh |
#2089 | Monroe Generating Station | Monroe, NC | 218.0 MWh |
#2090 | Central Energy Plant | Lake Buena Vista, FL | 216.0 MWh |
#2091 | Arvada | Arvada, WY | 216.0 MWh |
#2092 | O H Hutchings | Miamisburg, OH | 208.0 MWh |
#2093 | Silicon Valley Clean Water | Redwood City, CA | 4.7 GWh |
#2094 | Fulton (MO) | Fulton, MO | 206.0 MWh |
#2095 | National Energy of McBain | McBain, MI | 136.0 GWh |
#2096 | Miles City GT | Miles City, MT | 202.0 MWh |
#2097 | Engineered Carbons Borger Cogen | Borger, TX | 40.5 GWh |
#2098 | Bayville Central Facility | Bayville, NJ | 2.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding WAL3432.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ameresco Dallas LLC | Dallas, TX | 27.8 GWh | 14.2 mi |
Arlington Outlet Hydroelectric Generator | Fort Worth, TX | 6.9 MWh | 21.4 mi |
Ellis Solar LLC | Midlothian, TX | 136.2 GWh | 13.4 mi |
Ennis Power Company LLC | Ennis, TX | 1.4 TWh | 22.3 mi |
Handley | Fort Worth, TX | 823.0 GWh | 21.8 mi |
IKEA Grand Prairie Rooftop PV System | Grand Prairie, TX | 1.5 GWh | 18.5 mi |
Midlothian Energy Facility | Midlothian, TX | 6.0 TWh | 15.1 mi |
Mountain Creek | Dallas, TX | 654.1 GWh | 9.6 mi |
OTHERBenEKDallas | Dallas, TX | 107.0 MWh | 15.7 mi |
State Farm Insur Support Center Central | Irving, TX | 8.0 MWh | 23.4 mi |
Verizon Hidden Ridge Solar Project | Irving, TX | 3.0 MWh | 20.1 mi |
Village Creek Water Reclamation Facility | Arlington, TX | 31.9 GWh | 19.8 mi |
WAL1455 | Fort Worth, TX | 69.0 MWh | 20.6 mi |
WAL2667 | Dallas, TX | 62.0 MWh | 17.8 mi |
WAL284 | Mansfield, TX | 356.0 MWh | 14.6 mi |
WAL3224 | Garland, TX | 268.0 MWh | 23.8 mi |
WAL3284 | Arlington, TX | 313.0 MWh | 19.8 mi |
WAL3285 | Cedar Hill, TX | 371.0 MWh | 3.9 mi |
WAL5080 | Hurst, TX | 289.0 MWh | 25 mi |
WAL896 | Grand Prairie, TX | 352.0 MWh | 10.7 mi |