9460 W Sam Houston Pkwy S, Houston, TX 77099Plant Summary Information
WAL3302 is ranked #214 out of 304 natural gas power plants in Texas in terms of total annual net electricity generation.
WAL3302 is comprised of 3 generators and generated 81.3 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | WAL3302 |
---|---|
Utility Name | Walmart Stores Texas, LLC |
Location | Harris County, TX |
Initial Operation Date | October 2021 |
Last Update | Dec 2023 |
Annual Generation | 369.0 MWh |
Annual Consumption | 5.5 k MMBtu |
Ranked #11,114 out of 11,835 Power Plants Nationwide | |
Ranked #1,990 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #650 out of 749 Texas Power Plants | |
Ranked #214 out of 304 Texas Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of WAL3302
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for WAL3302.
Monthly Net Generation for WAL3302
WAL3302 Details
Summary Information | |
---|---|
Plant Name | WAL3302 (64900) |
Plant Address | 9460 W Sam Houston Pkwy S, Houston, TX 77099 |
Utility | Walmart Stores Texas, LLC (64315) |
Latitude, Longitude | 29.67937, -95.5614 |
Generation Dates on File | Jan 2022 to Dec 2023 |
Initial Operation Date | October 2021 |
Annual Generation | 369.0 MWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Motor Vehicle and Parts Dealers (441) |
Sector | Commercial Non-CHP (4) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | CenterPoint Energy (8901) TX |
Grid Voltage | 0.48 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | CENTERPOINT ENERGY |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator GEN1 Details Operating October 2021
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 2021 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator GEN2 Details Operating October 2021
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 2021 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator GEN3 Details Operating October 2021
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 2021 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
WAL3302 Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1980 | Bay View Backup Power Facility | Toledo, OH | 424.0 MWh |
#1981 | HEB00070 | Abilene, TX | 385.0 MWh |
#1982 | Paxton Creek Cogeneration | Harrisburg, PA | 414.0 MWh |
#1983 | WAL5091 | Cypress, TX | 378.0 MWh |
#1984 | WAL456 | Brownsville, TX | 374.0 MWh |
#1985 | Olmsted Waste Energy | Rochester, MN | 39.5 GWh |
#1986 | WAL3886 | Edinburg, TX | 372.0 MWh |
#1987 | WAL3285 | Cedar Hill, TX | 371.0 MWh |
#1988 | WAL3773 | Fort Worth, TX | 371.0 MWh |
#1989 | WAL407 | Killeen, TX | 369.0 MWh |
#1991 | WAL452 | Mcallen, TX | 368.0 MWh |
#1992 | WAL3320 | Palmhurst, TX | 368.0 MWh |
#1993 | WAL3631 | Crowley, TX | 365.0 MWh |
#1994 | Bay Front | Ashland, WI | 154.9 GWh |
#1995 | Praxair | Clute, TX | 364.0 MWh |
#1996 | WAL536 | Abilene, TX | 362.0 MWh |
#1997 | WAL3390 | The Woodlands, TX | 361.0 MWh |
#1998 | Barber Creek | Gillette, WY | 359.0 MWh |
#1999 | WAL266 | Grapevine, TX | 358.0 MWh |
#2000 | WAL284 | Mansfield, TX | 356.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding WAL3302.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Clara | Houston, TX | 707.0 MWh | 11.5 mi |
Friendswood Energy | Houston, TX | 88.2 GWh | 7 mi |
FTBLID2 | Sugarland, TX | 1.8 GWh | 8.5 mi |
HEB00109 | Katy, TX | 346.0 MWh | 7.5 mi |
HEB00110 | Missouri City, TX | 244.0 MWh | 10 mi |
HEBHoustonDistributionCenter | Houston, TX | 6.8 GWh | 11.2 mi |
HEBSnackPlant | Houston, TX | 645.0 MWh | 11.5 mi |
HO Clarke Generating | Houston, TX | 421.8 GWh | 7 mi |
Mckeever | Fresno, TX | 578.0 MWh | 12.8 mi |
OTHERNFBWA | Houston, TX | 178.0 MWh | 3.9 mi |
Rice University | Houston, TX | 18.6 GWh | 10.4 mi |
TECO CHP-1 | Houston, TX | 106.3 GWh | 9.9 mi |
The Methodist Hospital, Gas Turbine | Houston, TX | 13.8 GWh | 9.9 mi |
WAL2257 | Houston, TX | 404.0 MWh | 12.5 mi |
WAL2993 | Sugar Land, TX | 319.0 MWh | 6.8 mi |
WAL3584 | Houston, TX | 297.0 MWh | 6.5 mi |
WAL3827 | Richmond, TX | 303.0 MWh | 12.8 mi |
WAL768 | Katy, TX | 230.0 MWh | 12.3 mi |
WAL772 | Houston, TX | 287.0 MWh | 5.9 mi |
Westhollow Technology Center | Houston, TX | 21.8 GWh | 5.6 mi |