Wahoo
700 East 7th St., Wahoo, NE 68066Plant Summary Information
Wahoo is ranked #23 out of 33 natural gas power plants in Nebraska in terms of total annual net electricity generation.
Wahoo is comprised of 6 generators and generated 10.3 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Wahoo |
---|---|
Utility Name | City of Wahoo - (NE) |
Location | Saunders County, NE |
Initial Operation Date | August 1936 |
Last Update | Dec 2023 |
Annual Generation | 58.0 MWh |
Annual Consumption | 631 MMBtu |
Ranked #11,537 out of 11,852 Power Plants Nationwide | |
Ranked #2,185 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #94 out of 116 Nebraska Power Plants | |
Ranked #23 out of 33 Nebraska Natural Gas Power Plants | |
Fuel Types | Natural Gas : 81.9% Distillate Fuel Oil : 18.1% |
Map of Wahoo
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Wahoo.
Monthly Net Generation for Wahoo
Wahoo Details
Summary Information | |
---|---|
Plant Name | Wahoo (2310) |
Plant Address | 700 East 7th St., Wahoo, NE 68066 |
Utility | City of Wahoo - (NE) (19968) |
Latitude, Longitude | 41.2118, -96.61155 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | August 1936 |
Annual Generation | 58.0 MWh |
Fuel Types | Natural Gas : 81.9% Distillate Fuel Oil : 18.1% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Southwest Power Pool (SWPP) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Wells |
Ash Impoundment | No |
Transmission / Distribution Owner | Nebraska Public Power District (13337) NE |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | WAHOO CITY OF |
Pipeline Name | NORTHERN NATURAL GAS |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator 2 Details Operating August 1936
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1936 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 4 Details Operating June 1947
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.1 MW |
Winter Capacity | 1.1 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1947 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 1.1 MW |
Net Winter Capacity With Natural Gas | 1.1 MW |
Net Summer Capacity With Oil | 1.1 MW |
Net Winter Capacity With Oil | 1.1 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 5 Details Operating September 1952
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.2 MW |
Winter Capacity | 2.2 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1952 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 2.1 MW |
Net Winter Capacity With Natural Gas | 2.1 MW |
Net Summer Capacity With Oil | 2.1 MW |
Net Winter Capacity With Oil | 2.1 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 1 Details Operating September 1960
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.1 MW |
Winter Capacity | 2.1 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1960 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 2.1 MW |
Net Winter Capacity With Natural Gas | 2.1 MW |
Net Summer Capacity With Oil | 2.1 MW |
Net Winter Capacity With Oil | 2.1 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 6 Details Operating July 1969
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 3.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 3.4 MW |
Winter Capacity | 3.4 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 1969 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 3.4 MW |
Net Winter Capacity With Natural Gas | 3.4 MW |
Net Summer Capacity With Oil | 3.4 MW |
Net Winter Capacity With Oil | 3.4 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 3 Details Operating August 1973
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 4.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 4.4 MW |
Winter Capacity | 4.4 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1973 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 4.4 MW |
Net Winter Capacity With Natural Gas | 4.4 MW |
Net Summer Capacity With Oil | 4.4 MW |
Net Winter Capacity With Oil | 4.4 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Wahoo Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2175 | Municipal Power Plant | Zeeland, MI | 56.0 MWh |
#2176 | International Paper - Orange | Orange, TX | 238.6 GWh |
#2177 | Jackson (MO) | Jackson, MO | 137.0 MWh |
#2178 | Grimes Way | Pullman, WA | 98.0 MWh |
#2179 | Cumberland (WI) | Cumberland, WI | 143.0 MWh |
#2180 | Crete | Crete, NE | 83.0 MWh |
#2181 | ABC Coke | Tarrant, AL | 83.0 MWh |
#2182 | JBER Landfill Gas Power Plant | Anchorage, AK | 41.2 GWh |
#2183 | Montezuma | Montezuma, IA | 138.0 MWh |
#2184 | Chatham | Lowell, MI | 48.0 MWh |
#2186 | Mountain Lake | Mountain Lake, MN | 2.3 GWh |
#2187 | Winterset | Winterset, IA | 115.0 MWh |
#2188 | OTHERTraditionClearfork | Fort Worth, TX | 42.0 MWh |
#2189 | Hoisington | Hoisington, KS | 62.0 MWh |
#2190 | Gardner Energy Center | Gardner, KS | 40.0 MWh |
#2191 | Spring Valley | Spring Valley, MN | 149.0 MWh |
#2192 | Ellinwood | Ellinwood, KS | 48.0 MWh |
#2193 | Museum of Science and Industry | Chicago, IL | 37.2 MWh |
#2194 | Anthony | Anthony, KS | 41.0 MWh |
#2195 | Wheelabrator Hudson Falls | Hudson Falls, NY | 65.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Wahoo.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Archer Daniels Midland Columbus | Columbus, NE | 321.6 GWh | 37.8 mi |
Archer Daniels Midland Lincoln | Lincoln, NE | 9.0 GWh | 23.9 mi |
Cass County | Plattsmouth, NE | 210.4 GWh | 38.3 mi |
David City | David City, NE | 8.0 MWh | 26.5 mi |
Dodge County Solar Hybrid | Scribner, NE | 1.5 GWh | 28.6 mi |
Elk City Station | Bennington, NE | 48.7 GWh | 22 mi |
Fort Calhoun Community Solar | Fort Calhoun, NE | 10.0 GWh | 35.7 mi |
Holdrege Solar Center | Lincoln, NE | 6.4 GWh | 28.9 mi |
J Street | Lincoln, NE | 4.5 GWh | 28.4 mi |
Jones Street | Omaha, NE | 11.2 GWh | 35.9 mi |
Lon Wright | Fremont, NE | 521.6 GWh | 16.8 mi |
Missouri River Wastewater Treatment | Omaha, NE | 12.8 GWh | 35.5 mi |
North Omaha | Omaha, NE | 1.0 TWh | 35.6 mi |
Platteview Solar LLC | Ashland, NE | 82.0 GWh | 12.2 mi |
Rokeby | Lincoln, NE | 80.3 GWh | 33.8 mi |
Salt Valley Wind Plant | Lincoln, NE | 2.0 GWh | 21.2 mi |
Sarpy County | Bellevue, NE | 161.8 GWh | 33.4 mi |
Scribner Diesel Generation Facility | Scribner, NE | 34.0 MWh | 31.7 mi |
Seward Wind Farm | Seward, NE | 7.0 GWh | 37.5 mi |
Terry Bundy Generating Station | Lincoln, NE | 138.7 GWh | 20.9 mi |