6945 Ridge Rd, Wadsworth, OH 44281Plant Summary Information
Wadsworth IPS RTO BTM is ranked #18 out of 56 distillate fuel oil power plants in Ohio in terms of total annual net electricity generation.
Wadsworth IPS RTO BTM is comprised of 4 generators and generated 265.3 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Wadsworth IPS RTO BTM |
---|---|
Utility Name | American Mun Power-Ohio, Inc |
Location | Medina County, OH |
Initial Operation Date | August 2023 |
Last Update | Dec 2023 |
Annual Generation | 373.0 MWh |
Annual Consumption | 3.1 k MMBtu |
Ranked #11,122 out of 11,852 Power Plants Nationwide | |
Ranked #559 out of 1,262 Distillate Fuel Oil Power Plants Nationwide | |
Ranked #150 out of 183 Ohio Power Plants | |
Ranked #18 out of 56 Ohio Distillate Fuel Oil Power Plants | |
Fuel Types | Distillate Fuel Oil |
Map of Wadsworth IPS RTO BTM
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Wadsworth IPS RTO BTM.
Monthly Net Generation for Wadsworth IPS RTO BTM
Wadsworth IPS RTO BTM Details
Summary Information | |
---|---|
Plant Name | Wadsworth IPS RTO BTM (66453) |
Plant Address | 6945 Ridge Rd, Wadsworth, OH 44281 |
Utility | American Mun Power-Ohio, Inc (40577) |
Latitude, Longitude | 41.0863, -81.72744 |
Generation Dates on File | Aug 2023 to Dec 2023 |
Initial Operation Date | August 2023 |
Annual Generation | 373.0 MWh |
Fuel Types | Distillate Fuel Oil |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | City of Wadsworth - (OH) (19951) OH |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator PB1 Details Operating August 2023
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.7 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.7 MW |
Winter Capacity | 2.7 MW |
Minimum Load | 2.7 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2023 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator PB2 Details Operating August 2023
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.7 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.7 MW |
Winter Capacity | 2.7 MW |
Minimum Load | 2.7 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2023 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator PB3 Details Operating August 2023
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.7 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.7 MW |
Winter Capacity | 2.7 MW |
Minimum Load | 2.7 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2023 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator PB4 Details Operating August 2023
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.7 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.7 MW |
Winter Capacity | 2.7 MW |
Minimum Load | 2.7 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2023 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Wadsworth IPS RTO BTM Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#549 | Grundy Center City Light Plant | Grundy Center, IA | 388.1 MWh |
#550 | L V Sutton Combined Cycle | Wilmington, NC | 4.0 TWh |
#551 | Crestwood Dothan | Dothan, AL | 386.0 MWh |
#552 | Wadsworth HBS RTO BTM | Wadsworth, OH | 383.0 MWh |
#553 | Peno Creek | Bowling Green, MO | 140.5 GWh |
#554 | UCONN Cogen Facility | Storrs, CT | 122.8 GWh |
#555 | Suwannee River | Live Oak, FL | 42.3 GWh |
#556 | McPherson 3 | McPherson, KS | 15.5 GWh |
#557 | Pawhuska | Pawhuska, OK | 375.0 MWh |
#558 | Water Treatment 1 & 2 | Groton, CT | 375.0 MWh |
#560 | Alta Municipal Utilities | Alta, IA | 372.0 MWh |
#561 | Southwick | Houston, TX | 367.0 MWh |
#562 | Indeck Silver Springs Energy Center | Silver Springs, NY | 40.8 GWh |
#563 | LSP-Cottage Grove LP | Cottage Grove, MN | 1.0 TWh |
#564 | Saint Marys Hospital Power Plant | Rochester, MN | 52.2 GWh |
#565 | Curtis H Stanton Energy Center | Orlando, FL | 3.4 TWh |
#566 | Dartmouth Power Associates LP | Dartmouth, MA | 34.8 GWh |
#567 | Packaging Corp of America | Counce, TN | 410.8 GWh |
#568 | Sam Rayburn | Nursery, TX | 314.2 GWh |
#569 | Orchard Park | Chambersburg, PA | 25.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Wadsworth IPS RTO BTM.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Akron WRF | Akron, OH | 7.9 GWh | 9.5 mi |
Cleveland Thermal | Cleveland, OH | 1.8 GWh | 29.3 mi |
Cleveland Works | Cleveland, OH | 232.6 GWh | 26.9 mi |
Cuyahoga County Landfill | Brooklyn, OH | 4.3 GWh | 24.7 mi |
Cuyahoga Falls 1 | Cuyahoga Falls, OH | 707.0 MWh | 13.7 mi |
DG AMP 1048 Wadsworth | Wadsworth, OH | 11.2 GWh | 5.4 mi |
DG AMP Rittman Rd | Wadsworth, OH | 3.6 GWh | 6 mi |
DG AMP Solar Brewster | Brewster, OH | 2.2 GWh | 27.5 mi |
DG AMP Solar Orrville 3 | Orrville, OH | 3.3 GWh | 16 mi |
IGS AKC1 | Akron, OH | 2.3 GWh | 8 mi |
Loraine County Project | Oberlin, OH | 101.3 GWh | 27.8 mi |
Morton Salt Rittman | Rittman, OH | 13.9 GWh | 8.5 mi |
Oberlin (OH) | Oberlin, OH | 292.0 MWh | 29 mi |
Oberlin Spear Point Solar One | Oberlin, OH | 2.1 GWh | 30 mi |
Orrville | Orrville, OH | 20.8 GWh | 16.4 mi |
Orrville Peaking | Orrville, OH | 103.0 MWh | 15.7 mi |
Seville | Seville, OH | 153.0 MWh | 8.4 mi |
Summit Street Power Plant | Kent, OH | 31.3 GWh | 20.5 mi |
Wadsworth HBS RTO BTM | Wadsworth, OH | 383.0 MWh | 3.7 mi |
Wellington | Wellington, OH | 32.0 MWh | 26.5 mi |