Wadesboro 4
130 Mockingbird Hill Lane, Wadesboro, NC 28170Plant Summary Information
Wadesboro 4 is ranked #622 out of 738 solar farms in North Carolina in terms of total annual net electricity generation.
Wadesboro 4 generated 1.0 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Wadesboro 4 |
---|---|
Utility Name | Strata Manager, LLC |
Location | Anson County, NC |
Initial Operation Date | February 2019 |
Last Update | Dec 2022 |
Annual Generation | 4.1 GWh |
Annual Consumption | 15.0 k MMBtu |
Ranked #7,918 out of 11,249 Power Plants Nationwide | |
Ranked #2,966 out of 5,158 Solar Power Plants Nationwide | |
Ranked #710 out of 858 North Carolina Power Plants | |
Ranked #622 out of 738 North Carolina Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Wadesboro Farm 4, LLC (2018 to 2020) Strata Manager, LLC (2021 to 2022) |
Map of Wadesboro 4
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Wadesboro 4.
Monthly Net Generation for Wadesboro 4
Wadesboro 4 Details
Summary Information | |
---|---|
Plant Name | Wadesboro 4 (62627) |
Plant Address | 130 Mockingbird Hill Lane Wadesboro, NC 28170 |
Utility | Strata Manager, LLC (64778) |
Latitude, Longitude | 35.10217, -80.12202 |
Generation Dates on File | Feb 2019 to Dec 2022 |
Initial Operation Date | February 2019 |
Annual Generation | 4.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Progress East (CPLE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Duke Energy Progress - (NC) (3046) NC |
Grid Voltage | 2.20 kV |
Energy Storage | No |
Generator WADE4 Details Operating February 2019
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 2.2 MW |
Summer Capacity | 1.9 MW |
Winter Capacity | 1.9 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | February 2019 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 45 |
DC Net Capacity | 2.7 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Wadesboro 4 Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Wadesboro Farm 4, LLC | 800 Taylor St, Suite 200, Durham, NC 27701 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2956 | Cumberland Solar | Cumberland, WI | 4.1 GWh |
#2957 | Bear Creek Solar | Lodi, CA | 4.1 GWh |
#2958 | Stockton (MN) | Winona, MN | 4.1 GWh |
#2959 | Rockford CS 2 | Rockford, IL | 4.1 GWh |
#2960 | ISM Solar Dighton 2, LLC CSG | Dighton, MA | 4.1 GWh |
#2961 | Lena | Lena, IL | 4.1 GWh |
#2962 | Bullhead Solar, LLC | Fayette, MI | 4.1 GWh |
#2963 | FLS Solar 170, LLC | Lumberton, NC | 4.1 GWh |
#2964 | AGA TAG Solar III LLC | Spartanburg, SC | 4.1 GWh |
#2965 | Wolfcastle | Dekalb, IL | 4.1 GWh |
#2967 | Panda Solar NC 4, LLC | Clarkton, NC | 4.1 GWh |
#2968 | Old Caroleen Solar Farm | Forest City, NC | 4.1 GWh |
#2969 | Hastings Community Solar Farm | Hastings, NE | 4.1 GWh |
#2970 | Lakeville Solar | Lakeville, MA | 4.1 GWh |
#2971 | Manalapan Village Solar | Manalapan, NJ | 4.1 GWh |
#2972 | Reedley Community College Solar | Reedley, CA | 4.1 GWh |
#2973 | Lockheed Martin Solar | Orlando, FL | 4.1 GWh |
#2974 | Vaca Dixon Solar Station | Vacaville, CA | 4.1 GWh |
#2975 | Sampson Solar | Roseboro, NC | 4.1 GWh |
#2976 | Thanksgiving Fire Solar Farm, LLC | Zebulon, NC | 4.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Wadesboro 4.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Albemarle Hospital Unit | Albemarle, NC | 38.2 MWh | 18.5 mi |
Anson County Generation Facility | Lilesville, NC | 390.4 GWh | 14.6 mi |
BG Stewart Solar Farm, LLC | Marshville, NC | 9.1 GWh | 17.7 mi |
Blewett | Lilesville, NC | 114.4 GWh | 16.1 mi |
Copperfield | Troy, NC | 4.2 GWh | 18 mi |
ESA Albemarle NC Solar | Albemarle, NC | 4.6 GWh | 20.3 mi |
Falls Hydro | Badin, NC | 125.6 GWh | 20.4 mi |
Fisher Solar Farm - NC | Oakboro, NC | 9.9 GWh | 10.8 mi |
Gilead | Gilead, NC | 7.0 GWh | 9.1 mi |
Haywood Farm Solar, LLC | Troy, NC | 9.7 GWh | 20.3 mi |
Marshville Farm | Marshville, NC | 8.5 GWh | 16.7 mi |
Mills Anson Farm | Lilesville, NC | 9.5 GWh | 14 mi |
Selwyn Farm | Lilesville, NC | 7.5 GWh | 11.5 mi |
Stanly Solar, LLC | Albemarle, NC | 107.7 GWh | 14.5 mi |
Tillery | Mount Gilead, NC | 165.1 GWh | 7.9 mi |
Uwharrie Mountain Renewable | Mt. Gilead, NC | 47.1 GWh | 18.2 mi |
Wadesboro Farm 1 | Wadesboro, NC | 9.5 GWh | 7.8 mi |
Wadesboro Farm 2 | Wadesboro, NC | 9.9 GWh | 5.7 mi |
Wadesboro Farm 3 | Wadesboro, NC | 10.1 GWh | 10 mi |
Wadesboro Solar | Wadesboro, NC | 9.2 GWh | 10.3 mi |