Waco Farm
399 Devenny Street, Waco, NC 28169Plant Summary Information
Waco Farm is ranked #350 out of 748 solar farms in North Carolina in terms of total annual net electricity generation.
Waco Farm generated 1.9 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Waco Farm |
---|---|
Utility Name | Strata Manager, LLC |
Location | Cleveland County, NC |
Initial Operation Date | November 2013 |
Last Update | Dec 2023 |
Annual Generation | 8.8 GWh |
Annual Consumption | 31.4 k MMBtu |
Ranked #6,325 out of 11,852 Power Plants Nationwide | |
Ranked #1,842 out of 5,655 Solar Power Plants Nationwide | |
Ranked #424 out of 863 North Carolina Power Plants | |
Ranked #350 out of 748 North Carolina Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Waco Farm LLC (2013 to 2020) Strata Manager, LLC (2021 to 2023) |
Map of Waco Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Waco Farm.
Monthly Net Generation for Waco Farm
Waco Farm Details
Summary Information | |
---|---|
Plant Name | Waco Farm (58863) |
Plant Address | 399 Devenny Street, Waco, NC 28169 |
Utility | Strata Manager, LLC (64778) |
Latitude, Longitude | 35.35222, -81.42611 |
Generation Dates on File | Jan 2014 to Dec 2023 |
Initial Operation Date | November 2013 |
Annual Generation | 8.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF 12-173-001 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Carolinas (DUK) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Duke Energy Carolinas, LLC (5416) NC |
Grid Voltage | 12.40 kV |
Energy Storage | No |
Generator 1 Details Operating November 2013
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 5 MW |
Summer Capacity | 5 MW |
Winter Capacity | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 6.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Waco Farm Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Waco Farm, LLC | 800 Taylor St, Suite 200, Durham, NC 27701 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1832 | Mohawk View Solar | Fultonville, NY | 8.8 GWh |
#1833 | Hood Farm Solar, LLC | Trenton, NC | 8.8 GWh |
#1834 | Lewiston Solar | Lewiston, NC | 8.8 GWh |
#1835 | Worcester Landfill | Worcester, MA | 8.8 GWh |
#1836 | Frontenac Holdco LLC, CSG | Frontenac, MN | 8.8 GWh |
#1837 | Lahr 1, LLC | Wakefield Township, MN | 8.8 GWh |
#1838 | FLS Solar 230 (Warren) | Albertson, NC | 8.8 GWh |
#1839 | Sun Farm V, LLC | Hertford, NC | 8.8 GWh |
#1840 | Seaboard Solar LLC | Seaboard, NC | 8.8 GWh |
#1841 | Reeves Station Rd East | Medford, NJ | 8.8 GWh |
#1843 | Bo Biggs Solar | Lumberton, NC | 8.8 GWh |
#1844 | Crestwood Solar Center LLC | Oxford, NC | 8.8 GWh |
#1845 | Starratt Solar | Jacksonville, FL | 8.8 GWh |
#1846 | Chei Solar | Middlesex, NC | 8.8 GWh |
#1847 | Boseman Solar Center LLC | Rocky Mount, NC | 8.8 GWh |
#1848 | Moyer Solar | Stoneville, NC | 8.8 GWh |
#1849 | Howell Midland Farm, LLC | Midland, NC | 8.8 GWh |
#1850 | Innovative Solar 44 | Shannon, NC | 8.8 GWh |
#1851 | Vance Solar Farm, LLC | Kittrell, NC | 8.8 GWh |
#1852 | BRE | Oxford, NC | 8.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Waco Farm.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
231 Dixon 74 Solar I, LLC | Kings Mountain, NC | 3.8 GWh | 7.5 mi |
232 Long Branch 29 Solar I, LLC | Shelby, NC | 2.3 GWh | 11.2 mi |
233 Randolph 74 Solar I, LLC | Shelby, NC | 3.7 GWh | 9.7 mi |
Audrey Solar | Shelby, NC | 4.9 GWh | 11.2 mi |
Battleground | Kings Mountain, NC | 5.4 GWh | 10.6 mi |
Belwood Farm | Lawndale, NC | 6.8 GWh | 9.4 mi |
Cherryville City Hall | Cherryville, NC | 11.0 MWh | 3.1 mi |
County Home Solar Center, LLC | Shelby, NC | 3.3 GWh | 7.7 mi |
Dixon Dairy Road Solar | Kings Mountain, NC | 5.2 GWh | 10.6 mi |
Hutchinson Farm | Shelby, NC | 9.3 GWh | 8.1 mi |
Innovative Solar 23 | Kings Mountain, NC | 3.3 GWh | 6.4 mi |
Kings Mountain Energy Center | Kings Mountain, NC | 3.3 TWh | 10.9 mi |
Lafayette Solar I, LLC | Shelby, NC | 3.2 GWh | 11.4 mi |
Lux Solar, LLC | Kings Mountain, NC | 3.9 GWh | 7.7 mi |
Neisler Street Solar | Shelby, NC | 3.9 GWh | 9.1 mi |
Roper Farm, LLC | Grover, NC | 9.4 GWh | 11.4 mi |
Shelby Randolph Road Solar 1, LLC | Shelby, NC | 3.4 GWh | 9.6 mi |
SID Solar I, LLC | Shelby, NC | 8.1 GWh | 7.9 mi |
Warbler Holdings | Shelby, NC | 7.6 GWh | 11.4 mi |
York Road Solar I, LLC | Kings Mountain, NC | 3.1 GWh | 10.4 mi |