W S Lee
Lee Steam Plant Rd, Williamston, SC 29697Plant Summary Information
W S Lee is ranked #6 out of 189 power plants in South Carolina in terms of total annual net electricity generation.
W S Lee is comprised of 5 generators and generated 2.0 TWh during the 3-month period between December 2023 to March 2024.
Plant Name | W S Lee |
---|---|
Utility Name | Duke Energy Carolinas, LLC |
Location | Anderson County, SC |
Initial Operation Date | March 1951 |
Last Update | Mar 2024 |
Annual Generation | 6.6 TWh |
Annual Consumption | 47.0 M MMBtu |
Ranked #154 out of 11,249 Power Plants Nationwide | |
Ranked #65 out of 2,188 Natural Gas Power Plants Nationwide | |
Ranked #6 out of 189 South Carolina Power Plants | |
Ranked #1 out of 26 South Carolina Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of W S Lee
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for W S Lee.
Monthly Net Generation for W S Lee
W S Lee Details
Summary Information | |
---|---|
Plant Name | W S Lee (3264) |
Plant Address | Lee Steam Plant Rd Williamston, SC 29697 |
Utility | Duke Energy Carolinas, LLC (5416) |
Latitude, Longitude | 34.6022, -82.435 |
Generation Dates on File | Jan 2001 to Mar 2024 |
Initial Operation Date | March 1951 |
Annual Generation | 6.6 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Carolinas (DUK) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Saluda River |
Ash Impoundment | Yes Not Lined Out of Service |
Transmission / Distribution Owner | Duke Energy Carolinas, LLC (5416) SC |
Grid Voltage | 100.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | PIEDMONT NATURAL GAS |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator 7 Details Operating January 2007
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 54 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 42 MW |
Winter Capacity | 48 MW |
Minimum Load | 42 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2007 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 42 MW |
Net Winter Capacity With Natural Gas | 41 MW |
Net Summer Capacity With Oil | 42 MW |
Net Winter Capacity With Oil | 41 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 8 Details Operating January 2007
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 54 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 42 MW |
Winter Capacity | 48 MW |
Minimum Load | 42 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2007 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 42 MW |
Net Winter Capacity With Natural Gas | 41 MW |
Net Summer Capacity With Oil | 42 MW |
Net Winter Capacity With Oil | 41 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator CT11 Details Operating April 2018
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | Yes |
Nameplate Capacity | 242.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 234 MW |
Winter Capacity | 248 MW |
Minimum Load | 234 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 2018 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CT12 Details Operating April 2018
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | Yes |
Nameplate Capacity | 242.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 233 MW |
Winter Capacity | 248 MW |
Minimum Load | 233 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 2018 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator ST10 Details Operating April 2018
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC1 |
Ownership | Single Owner |
Duct Burners | Yes |
Nameplate Capacity | 362.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 313 MW |
Winter Capacity | 313 MW |
Minimum Load | 313 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 2018 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
W S Lee Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#55 | Hamilton Patriot Generation Plant | Montgomery, PA | 7.0 TWh |
#56 | Clean Energy Future-Lordstown, LLC | Lordstown, OH | 6.9 TWh |
#57 | Lake Side Power Plant | Vineyard, UT | 6.9 TWh |
#58 | P L Bartow | St. Petersburg, FL | 6.8 TWh |
#59 | Jack County | Bridgeport, TX | 6.8 TWh |
#60 | Dania Beach 7 | Ft. Lauderdale, FL | 6.6 TWh |
#61 | Marcus Hook Energy LP | Marcus Hook, PA | 6.6 TWh |
#62 | Acadia Energy Center | Eunice, LA | 6.6 TWh |
#63 | Hamilton Liberty | Towanda, PA | 6.6 TWh |
#64 | Lee Combined Cycle Plant | Goldsboro, NC | 6.6 TWh |
#66 | Cottonwood Energy Project | Deweyville, TX | 6.5 TWh |
#67 | Hickory Run Energy Station | New Castle, PA | 6.5 TWh |
#68 | Santan | Gilbert, AZ | 6.5 TWh |
#69 | Waterford Power, LLC | Waterford, OH | 6.5 TWh |
#70 | Taft Cogeneration Facility | Hahnville, LA | 6.5 TWh |
#71 | E B Harris Electric Generating Plant | Autaugaville, AL | 6.5 TWh |
#72 | Magnolia Power Plant | Ashland, MS | 6.4 TWh |
#73 | Allen | Memphis, TN | 6.3 TWh |
#74 | H L Culbreath Bayside Power Station | Tampa, FL | 6.3 TWh |
#75 | Polk | Mulberry, FL | 6.3 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding W S Lee.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ace Solar | Piedmont, SC | 2.1 GWh | 9.8 mi |
Adams | Piedmont, SC | 4.8 GWh | 8.3 mi |
Anderson (SC) | Anderson, SC | 4.7 GWh | 15.6 mi |
Berry Road Solar | Pelzer, SC | 3.7 GWh | 6.6 mi |
Bluebird Solar SC LLC | Pendleton, SC | 7.2 GWh | 17.3 mi |
BMW Manufacturing Co | Greer, SC | 34.4 GWh | 24.9 mi |
Boyds Mill Hydro | Ware Shoals, SC | 3.8 GWh | 16.8 mi |
Central Energy Facility | Clemson, SC | 6.0 MWh | 23.6 mi |
Duke Energy CHP at Clemson University | Clemson, SC | 92.7 GWh | 22.7 mi |
Enoree Phase II Landfill Gas Recovery | Greer, SC | 8.7 GWh | 19.8 mi |
Hollidays Bridge Hydro | Honea Path, SC | 11.4 GWh | 6.2 mi |
Honea Path | Honea Path, SC | 69.6 MWh | 11.8 mi |
Pelzer Lower | Williamston, SC | 6.5 GWh | 1.2 mi |
Pelzer Solar I | Pelzer, SC | 2.1 GWh | 5.4 mi |
Pelzer Upper | Petzer, SC | 4.7 GWh | 3 mi |
Piedmont Hydro Power Project | Piedmont, SC | 702.0 MWh | 7.1 mi |
Pinson Solar Farm | Woodruff, SC | 16.9 GWh | 22.8 mi |
Saluda Dam | Greenville, SC | 7.3 GWh | 17.5 mi |
White Horse Solar A | Greenville, SC | 3.6 GWh | 12.9 mi |
Whitt Solar | Piedmont, SC | 4.3 GWh | 9.7 mi |