Voyager Wind II
7021 Oak Creek Rd, Mojave, CA 93501Plant Summary Information
Voyager Wind II is ranked #3 out of 108 wind farms in California in terms of total annual net electricity generation.
Voyager Wind II generated 148.4 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Voyager Wind II |
---|---|
Utility Name | Terra-Gen Operating Co-Wind |
Location | Kern County, CA |
Initial Operation Date | December 2018 |
Last Update | Aug 2024 |
Annual Generation | 473.5 GWh |
Annual Consumption | 1.7 M MMBtu |
Ranked #1,344 out of 11,835 Power Plants Nationwide | |
Ranked #365 out of 1,343 Wind Power Plants Nationwide | |
Ranked #90 out of 1,569 California Power Plants | |
Ranked #3 out of 108 California Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
Terra-Gen Operating Co LLC (2017 to 2017) Terra-Gen Operating Co-Wind (2018 to 2023) |
Map of Voyager Wind II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Voyager Wind II.
Monthly Net Generation for Voyager Wind II
Voyager Wind II Details
Summary Information | |
---|---|
Plant Name | Voyager Wind II (61582) |
Plant Address | 7021 Oak Creek Rd, Mojave, CA 93501 |
Utility | Terra-Gen Operating Co-Wind (2770) |
Latitude, Longitude | 35.07338, -118.26862 |
Generation Dates on File | Dec 2018 to Aug 2024 |
Initial Operation Date | December 2018 |
Annual Generation | 473.5 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator VYGR2 Details Operating December 2018
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 128.7 MW |
Summer Capacity | 128.7 MW |
Winter Capacity | 128.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2018 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 36 |
Turbine Details | |
Number Of Turbines | 36 |
---|---|
Predominant Turbine Manufacturer | Vestas |
Predominant Turbine Model Number | V117-3.45 |
Design Wind Speed | 22 MPH |
Wind Quality Class | 1 - High Wind |
Turbine Hub Height Feet | 275 |
Voyager Wind II Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#355 | Goldthwaite Wind Energy Facility | Goldthwaite, TX | 490.1 GWh |
#356 | Thunder Spirit Wind, LLC | Hettinger, ND | 487.7 GWh |
#357 | Clearwater Wind East | Miles City, MT | 486.8 GWh |
#358 | Montague Wind Power Facility LLC | Arlington, OR | 485.7 GWh |
#359 | Ensign Wind LLC | Montezuma, KS | 483.0 GWh |
#360 | Cimarron Wind Energy LLC | Cimmaron, KS | 479.4 GWh |
#361 | Big Horn Wind Project | Bickelton, WA | 477.7 GWh |
#362 | Dakota Range III Wind Project | Summit, SD | 476.5 GWh |
#363 | Cimarron Windpower II | Cimarron, KS | 475.5 GWh |
#364 | Ford County Wind Farm LLC | Ford County, IL | 475.2 GWh |
#366 | Otter Creek Wind Farm LLC | Ransom, IL | 468.9 GWh |
#367 | Manzana Wind LLC | Rosamond, CA | 468.5 GWh |
#368 | Rocksprings | Del Rio, TX | 467.8 GWh |
#369 | Los Vientos Windpower III | Rio Grande City, TX | 465.2 GWh |
#370 | Walleye Wind | Beaver Creek, MN | 464.0 GWh |
#371 | Seven Mile Hill | Medicine Bow, WY | 463.2 GWh |
#372 | Senate Wind LLC | Bryson, TX | 463.1 GWh |
#373 | Desert Sky | Iraan, TX | 462.3 GWh |
#374 | Whispering Willow Wind Farm - East | Iowa Falls, IA | 459.4 GWh |
#375 | Meridian Wind Park | Merrill, MI | 456.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Voyager Wind II.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
85 A | Tehachapi, CA | 62.9 GWh | 3.5 mi |
Alta Wind Energy Center III | Mojave, CA | 302.6 GWh | 3.7 mi |
Cameron Ridge LLC | Mojave, CA | 125.1 GWh | 2.7 mi |
Mojave 16/17/18 | Mojave, CA | 53.9 GWh | 2 mi |
Mojave 3/4/5 | Mojave, CA | 83.2 GWh | 1.7 mi |
Mustang Hills LLC | Mojave, CA | 248.1 GWh | 3.3 mi |
Oak Creek Energy Systems I | Mojave, CA | 37.8 GWh | 2.1 mi |
Oasis Alta | Mojave, CA | 45.4 GWh | 1.6 mi |
Oasis Wind | Mojave, CA | 205.4 GWh | 1.6 mi |
Ridgetop | Mojave, CA | 119.5 GWh | 2.6 mi |
Ridgetop Energy LLC | Mojave, CA | 31.1 GWh | 2.7 mi |
Rising Tree Wind Farm | Mojave, CA | 213.4 GWh | 2.9 mi |
Rising Tree Wind Farm II | Mojave, CA | 47.7 GWh | 3.7 mi |
Rising Tree Wind Farm III | Mojave, CA | 261.7 GWh | 1.7 mi |
SEPV Mojave West | Mojave, CA | 51.1 GWh | 3.6 mi |
Tehachapi Wind Resource II | Tehachapi, CA | 42.1 GWh | 3.3 mi |
TPC Windfarms LLC | Mojave, CA | 38.7 GWh | 1.7 mi |
Voyager Wind I | Mojave, CA | 372.3 GWh | 2 mi |
Voyager Wind III | Mojave, CA | 142.9 GWh | 0.9 mi |
Voyager Wind IV | Mojave, CA | 70.2 GWh | 1.1 mi |