Vitro Architectural Glass (PA)
400 Park Drive, Carlisle, PA 17015Plant Summary Information
Vitro Architectural Glass (PA) is ranked #36 out of 53 distillate fuel oil power plants in Pennsylvania in terms of total annual net electricity generation.
Vitro Architectural Glass (PA) is comprised of 3 generators and generated 15.5 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Vitro Architectural Glass (PA) |
---|---|
Utility Name | Vitro Architectural Glass (PA) |
Location | Cumberland County, PA |
Initial Operation Date | July 1972 |
Last Update | Dec 2023 |
Annual Generation | 72.5 MWh |
Annual Consumption | 840 MMBtu |
Ranked #11,478 out of 11,836 Power Plants Nationwide | |
Ranked #820 out of 1,262 Distillate Fuel Oil Power Plants Nationwide | |
Ranked #223 out of 231 Pennsylvania Power Plants | |
Ranked #36 out of 53 Pennsylvania Distillate Fuel Oil Power Plants | |
Fuel Types | Distillate Fuel Oil |
Previous Operator |
PPG Industries, Inc. Works 6 (2013 to 2016) Vitro Architectural Glass (PA) (2017 to 2023) |
Map of Vitro Architectural Glass (PA)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Vitro Architectural Glass (PA).
Monthly Net Generation for Vitro Architectural Glass (PA)
Vitro Architectural Glass (PA) Details
Summary Information | |
---|---|
Plant Name | Vitro Architectural Glass (PA) (58051) |
Plant Address | 400 Park Drive, Carlisle, PA 17015 |
Utility | Vitro Architectural Glass (PA) (57425) |
Latitude, Longitude | 40.12639, -77.16444 |
Generation Dates on File | Jan 2013 to Dec 2023 |
Initial Operation Date | July 1972 |
Annual Generation | 72.5 MWh |
Fuel Types | Distillate Fuel Oil |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Nonmetallic Mineral Product Manufacturing (327) |
Sector | Industrial Non-CHP (6) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Metropolitan Edison Co (12390) PA |
Grid Voltage | 13.80 kV |
Energy Storage | No |
Generator L2AE Details Standby May 1996
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 0.7 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
First Operation Date | May 1996 |
---|---|
Combined Heat & Power | No |
Sector Name | Industrial Non-CHP (6) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator L2BW Details Standby May 1996
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 0.7 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
First Operation Date | May 1996 |
---|---|
Combined Heat & Power | No |
Sector Name | Industrial Non-CHP (6) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator L121 Details Standby November 2021
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
---|---|
First Operation Date | November 2021 |
Combined Heat & Power | No |
Sector Name | Industrial Non-CHP (6) |
Energy Source | Distillate Fuel Oil |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Vitro Architectural Glass (PA) Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#810 | WAL202 | Frisco, TX | 76.0 MWh |
#811 | Holton | City of Holton, KS | 1.0 GWh |
#812 | Malden | Malden, MO | 75.0 MWh |
#813 | Woodville RTO BTM | Woodville, OH | 75.0 MWh |
#814 | Ephrata PA BTM | Lancaster, PA | 75.0 MWh |
#815 | BYUI Central Energy Facility | Rexburg, ID | 39.5 GWh |
#816 | Algonquin Windsor Locks | Windsor Locks, CT | 130.4 GWh |
#817 | IMEA Flora | Flora, IL | 73.0 MWh |
#818 | Southwark | Philadelphia, PA | 73.0 MWh |
#819 | St Marys | St. Marys, OH | 73.0 MWh |
#821 | Chappell | Chappell, NE | 72.0 MWh |
#822 | Beaver Island | Beaver Island, MI | 71.0 MWh |
#823 | West Group Data Center | Eagan, MN | 71.0 MWh |
#824 | Winterset | Winterset, IA | 115.0 MWh |
#825 | Salmon Diesel | Salmon, ID | 69.0 MWh |
#826 | Benson City of | Benson, MN | 69.0 MWh |
#827 | Waterloo Lundquist | Waterloo, IA | 69.0 MWh |
#828 | MCRD Parris Island PV Hybrid | Parris Island, SC | 31.5 GWh |
#829 | Hartford Hospital Cogeneration | Hartford, CT | 43.8 GWh |
#830 | Luverne | Luverne, MN | 68.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Vitro Architectural Glass (PA).
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Adams Solar LLC PA | Gettysburg, PA | 106.8 GWh | 17.1 mi |
Blue Ridge Landfill | Chambersburg, PA | 45.9 GWh | 23.9 mi |
Brunner Island | York Haven, PA | 3.6 TWh | 24.8 mi |
CASD Solar | Carlisle, PA | 1.0 MWh | 6.5 mi |
Cumberland County PA LFG Recovery | Shippensburg, PA | 45.8 GWh | 18.1 mi |
Dickinson Solar | Carlisle, PA | 3.8 GWh | 5.7 mi |
Falling Spring | Chambersburg, PA | 906.0 MWh | 29.2 mi |
Haleon York RDC Solar Facility | York, PA | 1.6 GWh | 23.4 mi |
Harrisburg Facility | Harrisburg, PA | 93.2 GWh | 18.3 mi |
Hunterstown | Gettysburg, PA | 39.5 GWh | 18 mi |
Hunterstown Power Plant | Gettysburg, PA | 4.2 TWh | 17.5 mi |
Knouse Solar Project 1 | Gardners, PA | 4.2 GWh | 7.8 mi |
Lancaster County Resource Recovery | Brainbridge, PA | 185.5 GWh | 27.8 mi |
Mountain | Mount Holly Springs, PA | 5.4 GWh | 0.5 mi |
Paxton Creek Cogeneration | Harrisburg, PA | 414.0 MWh | 17.9 mi |
Phoenix Contact - CCHP Plant | Middletown, PA | 4.2 GWh | 23 mi |
Pixelle Specialty Solutions LLC - Spring Grove Facility | Spring Grove, PA | 387.5 GWh | 23.6 mi |
Whitetail Solar 1 | Newburg, PA | 23.4 GWh | 23.6 mi |
York County Resource Recovery | York, PA | 249.9 GWh | 25.1 mi |
York Haven | York Haven, PA | 110.4 GWh | 23.9 mi |