Virginia Beach

1997 Jake Sears Rd, Virginia Beach, VA 23464

Plant Summary Information

Virginia Beach is ranked #15 out of 17 landfill gas power plants in Virginia in terms of total annual net electricity generation.

Virginia Beach is comprised of 36 generators and generated 1.0 GWh during the 3-month period between September 2023 to December 2023.

Plant NameVirginia Beach
Utility NameIndustrial Power Generating Company LLC
LocationVirginia Beach city, VA
Initial Operation DateNovember 2001
Last Update Dec 2023
Annual Generation 4.2 GWh
Annual Consumption 48.3 k MMBtu
Ranked #8,033 out of 11,852 Power Plants Nationwide
Ranked #271 out of 299 Landfill Gas Power Plants Nationwide
Ranked #163 out of 212 Virginia Power Plants
Ranked #15 out of 17 Virginia Landfill Gas Power Plants
Fuel Types Landfill Gas : 84.3% Distillate Fuel Oil : 15.7%

Map of Virginia Beach

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Virginia Beach.

Create Your Account Today

Monthly Net Generation for Virginia Beach

Virginia Beach Details

Summary Information
Plant NameVirginia Beach (56693)
Plant Address1997 Jake Sears Rd, Virginia Beach, VA 23464
UtilityIndustrial Power Generating Company LLC (55938)
Latitude, Longitude36.7858, -76.2019
Generation Dates on FileJan 2007 to Dec 2023
Initial Operation DateNovember 2001
Annual Generation 4.2 GWh
Fuel Types Landfill Gas : 84.3% Distillate Fuel Oil : 15.7%
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionSERC
Balancing AuthorityPJM Interconnection, LLC (PJM)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water SourceMunicipality
Ash Impoundment No
Transmission / Distribution OwnerVirginia Electric & Power Co (19876) VA
Grid Voltage 34.50 kV
Energy StorageNo

Generator 1 Details Operating November 2001

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181319
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2001
Planned RetirementMay 2024
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 10 Details Operating November 2001

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181319
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2001
Planned RetirementMay 2024
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 11 Details Operating November 2001

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181319
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2001
Planned RetirementMay 2024
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 12 Details Operating November 2001

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181319
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2001
Planned RetirementMay 2024
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 13 Details Operating November 2001

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181319
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2001
Planned RetirementMay 2024
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 14 Details Operating November 2001

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181319
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2001
Planned RetirementMay 2024
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 15 Details Operating November 2001

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181319
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2001
Planned RetirementMay 2024
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 16 Details Operating November 2001

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181319
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2001
Planned RetirementMay 2024
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 17 Details Operating November 2001

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181319
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2001
Planned RetirementMay 2024
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 18 Details Operating November 2001

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181319
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2001
Planned RetirementMay 2024
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 19 Details Operating November 2001

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181319
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2001
Planned RetirementMay 2024
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 2 Details Operating November 2001

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181319
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2001
Planned RetirementMay 2024
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 20 Details Operating November 2001

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181319
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2001
Planned RetirementMay 2024
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 21 Details Operating November 2001

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181319
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2001
Planned RetirementMay 2024
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 22 Details Operating November 2001

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181319
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2001
Planned RetirementMay 2024
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 23 Details Operating November 2001

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181319
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2001
Planned RetirementMay 2024
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 24 Details Operating November 2001

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181319
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2001
Planned RetirementMay 2024
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 25 Details Operating November 2001

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181319
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2001
Planned RetirementMay 2024
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 26 Details Operating November 2001

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181319
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2001
Planned RetirementMay 2024
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 27 Details Operating November 2001

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181319
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2001
Planned RetirementMay 2024
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 28 Details Operating November 2001

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181319
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2001
Planned RetirementMay 2024
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 29 Details Operating November 2001

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181319
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2001
Planned RetirementMay 2024
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 3 Details Operating November 2001

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181319
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2001
Planned RetirementMay 2024
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 30 Details Operating November 2001

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181319
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2001
Planned RetirementMay 2024
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 31 Details Operating November 2001

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181319
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2001
Planned RetirementMay 2024
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 32 Details Operating November 2001

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181319
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2001
Planned RetirementMay 2024
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 33 Details Operating November 2001

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181319
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2001
Planned RetirementMay 2024
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 34 Details Operating November 2001

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181319
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2001
Planned RetirementMay 2024
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 35 Details Operating November 2001

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181319
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2001
Planned RetirementMay 2024
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 36 Details Operating November 2001

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181319
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2001
Planned RetirementMay 2024
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 4 Details Operating November 2001

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181319
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2001
Planned RetirementMay 2024
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 5 Details Operating November 2001

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181319
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2001
Planned RetirementMay 2024
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 6 Details Operating November 2001

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181319
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2001
Planned RetirementMay 2024
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 7 Details Operating November 2001

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181319
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2001
Planned RetirementMay 2024
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 8 Details Operating November 2001

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181319
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2001
Planned RetirementMay 2024
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Generator 9 Details Operating November 2001

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node Designation36181319
Nameplate Capacity0.3 MW
Nameplate Power Factor1
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2001
Planned RetirementMay 2024
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas / Distillate Fuel Oil
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceDFO / LFG

Virginia Beach Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Landfill Gas.

RankPlant NamePlant LocationAnnual Generation
#261Toyon Power StationLos Angeles, CA4.9 GWh
#262MorgantownMorgantown, PA4.8 GWh
#263MoretownWaterbury, VT4.8 GWh
#264Onalaska Campus Landfill BiogasOnalaska, WI4.4 GWh
#265Glasgow LFGTEGlasgow, KY4.3 GWh
#266North City - Landfill Gas Engine NorthSan Diego, CA4.2 GWh
#267Blue Ridge GeneratingIrvine, KY3.9 GWh
#268Inst and Envir Dir Marine Logistics BaseAlbany, GA3.9 GWh
#269MCLB Landfill Gas to EnergyAlbany, GA3.9 GWh
#270Morehead Generating FacilityMorehead, KY3.9 GWh
#272Munster Landfill Gas-to-EnergyMunster, IN3.5 GWh
#273SECCRA Community LandfillWest Grove, PA3.4 GWh
#274Laurel Ridge LFGTELily, KY3.4 GWh
#275Beecher Gas RecoveryBeecher, IL3.2 GWh
#276Sunnyvale City of WPCPSunnyvale, CA9.7 GWh
#277Granby LFGGranby, MA2.9 GWh
#278St Joseph Landfill Generating StationSt Joseph, MO2.9 GWh
#279Berkeley County LandfillMoncks Corner, SC2.5 GWh
#280Pennsauken LandfillPennsauken, NJ2.4 GWh
#281Chautauqua LFGTE FacilityJamestown, NY2.2 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Virginia Beach.

Plant NamePlant LocationAnnual GenerationDistance
Bedford SolarChesapeake, VA114.3 GWh6.3 mi
Caden Energix Hickory LLCChesapeake, VA57.8 GWh11.2 mi
ChesapeakeChesapeake, VA178.0 MWh5.6 mi
Chesapeake Solar ProjectChesapeake, VA180.5 GWh8.7 mi
Elizabeth River Power StationChesapeake, VA109.2 GWh5.9 mi
Grassfield SolarChesapeake, VA41.0 GWh12.5 mi
IKEA Norfolk Rooftop PV SystemNorfolk, VA1.5 GWh6.2 mi
Morgan's CornerElizabeth City, NC28.3 GWh26.8 mi
Oak Trail Solar, LLCMoyock, NC240.4 GWh19.5 mi
Oceana SolarVirginia Beach, VA29.0 GWh8.3 mi
Pleasant Hill SolarSuffolk, VA20.7 GWh21.8 mi
Ranchland Solar, LLCMoyock, NC115.4 GWh21.8 mi
Shawboro PV1Shawboro, NC35.8 GWh25.2 mi
Stratford Solar Center, LLCSuffolk, VA31.0 GWh21.7 mi
Summit Farms SolarMoyock, NC79.8 GWh21.7 mi
TWE Myrtle Solar Farm, LLCSuffolk, VA20.7 GWh25.9 mi
Waste Management Bethel LFGTEHampton, VA37.4 GWh24.1 mi
Western Branch High SchoolChesapeake, VA1.1 GWh12.1 mi
Wheelabrator PortsmouthPortsmouth, VA35.6 GWh5.8 mi
Woodland Solar FarmSmithfield, VA30.0 GWh23.7 mi