Vintner Solar
1030 El Pomar Drive, Templeton, CA 93465Plant Summary Information
Vintner Solar is ranked #455 out of 799 solar farms in California in terms of total annual net electricity generation.
Vintner Solar generated 765.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Vintner Solar |
---|---|
Utility Name | Ecos Energy LLC |
Location | San Luis Obispo County, CA |
Initial Operation Date | April 2014 |
Last Update | Dec 2023 |
Annual Generation | 3.9 GWh |
Annual Consumption | 13.8 k MMBtu |
Ranked #8,259 out of 11,852 Power Plants Nationwide | |
Ranked #3,229 out of 5,655 Solar Power Plants Nationwide | |
Ranked #1,153 out of 1,570 California Power Plants | |
Ranked #455 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of Vintner Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Vintner Solar.
Monthly Net Generation for Vintner Solar
Vintner Solar Details
Summary Information | |
---|---|
Plant Name | Vintner Solar (58509) |
Plant Address | 1030 El Pomar Drive, Templeton, CA 93465 |
Utility | Ecos Energy LLC (58135) |
Latitude, Longitude | 35.55795, -120.68287 |
Generation Dates on File | Apr 2014 to Dec 2023 |
Initial Operation Date | April 2014 |
Annual Generation | 3.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF13-650 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
Grid Voltage | 21.00 kV |
Energy Storage | No |
Generator PV4 Details Operating April 2014
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2014 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 2.1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Vintner Solar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3219 | Briarwood | Greenwood, SC | 3.9 GWh |
#3220 | Hostetter Solar One, LLC | Hagerstown, MD | 3.9 GWh |
#3221 | SSD Clackamas 7, LLC | Molalla, OR | 3.9 GWh |
#3222 | Cortez Solar 3, LLC | Cortez, CO | 3.9 GWh |
#3223 | Sampson Solar | Roseboro, NC | 3.9 GWh |
#3224 | Palmer Creek Solar, LLC | Dayton, OR | 3.9 GWh |
#3225 | Case Creek Solar | Woodburn, OR | 3.9 GWh |
#3226 | USS Itasca Clean Energy Solar LLC | Grand Rapids, MN | 3.8 GWh |
#3227 | Gary Solar | Bishopville, SC | 3.9 GWh |
#3228 | Bear Creek Solar | Lodi, CA | 3.9 GWh |
#3230 | Rosewood Solar | Goldsboro, NC | 3.9 GWh |
#3231 | Cortland | Cortland, IL | 3.9 GWh |
#3232 | Lena | Lena, IL | 3.9 GWh |
#3233 | Next Generation Solar Farm | New Haven, VT | 3.9 GWh |
#3234 | Perkins Solar, LLC | Roxboro, NC | 3.9 GWh |
#3235 | Holyoke Solar Cooperative at Mueller | Holyoke, MA | 3.9 GWh |
#3236 | Neisler Street Solar | Shelby, NC | 3.9 GWh |
#3237 | Ruskin Solar | Dudley, NC | 3.9 GWh |
#3238 | South Solar | Pamplico, SC | 3.9 GWh |
#3239 | Fremont CO 1, LLC | Canon City, CO | 3.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Vintner Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aera San Ardo Cogen Facility | San Ardo, CA | 23.6 GWh | 29.1 mi |
Atascadero State Hospital | Atascadero, CA | 2.8 GWh | 7.1 mi |
Avenal Park | Avenal, CA | 10.6 GWh | 43.8 mi |
CA Flats Solar 130, LLC | Shandon, CA | 228.5 GWh | 16.1 mi |
CA Flats Solar 150, LLC | Shandon, CA | 327.6 GWh | 16.1 mi |
CA-DGS-California Men's Colony | San Luis Obispo, CA | 3.7 GWh | 16.1 mi |
CED Avenal | Avenal, CA | 8.6 GWh | 42.5 mi |
Coalinga 25D Cogen | Coalinga, CA | 67.0 GWh | 44.3 mi |
Cold Canyon 1 | San Luis Obispo, CA | 10.0 GWh | 26.1 mi |
Coronal Lost Hills | Lost Hills, CA | 28.6 GWh | 45.2 mi |
Diablo Canyon | Avila Beach, CA | 16.7 TWh | 25.8 mi |
Firestone Walker Brewery - Phase 1 | Paso Robles, CA | 3.9 GWh | 2.7 mi |
Meridian Vineyards | Paso Robles, CA | 1.4 GWh | 10.1 mi |
Nacimiento Hydro Project | Bradley, CA | 18.6 GWh | 20.1 mi |
Roll Lost Hills | Lost Hills, CA | 5.5 GWh | 45 mi |
Salinas River Cogeneration | San Ardo, CA | 229.2 GWh | 29.1 mi |
Sand Drag LLC | Avenal, CA | 33.4 GWh | 43.5 mi |
Stenner Creek Solar | San Luis Obispo, CA | 700.0 MWh | 16.4 mi |
Sun City Project LLC | Avenal, CA | 34.3 GWh | 43.5 mi |
Topaz Solar Farm | Santa Margarita, CA | 1.1 TWh | 36.1 mi |