Vienna Wind Farm
1805 East Anson St., Marshalltown, IA 50158Plant Summary Information
Vienna Wind Farm is ranked #45 out of 124 wind farms in Iowa in terms of total annual net electricity generation.
Vienna Wind Farm generated 110.3 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Vienna Wind Farm |
---|---|
Utility Name | MidAmerican Energy Co |
Location | Marshall County, IA |
Initial Operation Date | November 2012 |
Last Update | Dec 2023 |
Annual Generation | 403.3 GWh |
Annual Consumption | 1.6 M MMBtu |
Ranked #1,499 out of 11,852 Power Plants Nationwide | |
Ranked #428 out of 1,345 Wind Power Plants Nationwide | |
Ranked #58 out of 272 Iowa Power Plants | |
Ranked #45 out of 124 Iowa Wind Power Plants | |
Fuel Types | Wind |
Map of Vienna Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Vienna Wind Farm.
Monthly Net Generation for Vienna Wind Farm
Vienna Wind Farm Details
Summary Information | |
---|---|
Plant Name | Vienna Wind Farm (57874) |
Plant Address | 1805 East Anson St., Marshalltown, IA 50158 |
Utility | MidAmerican Energy Co (12341) |
Latitude, Longitude | 42.15944, -92.77611 |
Generation Dates on File | Dec 2012 to Dec 2023 |
Initial Operation Date | November 2012 |
Annual Generation | 403.3 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | ITC Midwest LLC (56161) |
Grid Voltage | 161.00 kV |
Energy Storage | No |
Generator VIWF Details Operating November 2012
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 105.6 MW |
Summer Capacity | 105.6 MW |
Winter Capacity | 105.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2012 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
---|---|
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 45 |
Planned New Prime Mover | WT |
Planned Energy Source | WND |
Planned New Nameplate Capacity | 113.6 MW |
Planned Repower | September 2024 |
Other Planned Modifications | No |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 45 |
---|---|
Predominant Turbine Manufacturer | Siemens |
Predominant Turbine Model Number | SWT-2.3-108 |
Design Wind Speed | 16.8 MPH |
Wind Quality Class | 3 - Low Wind |
Turbine Hub Height Feet | 262.4 |
Generator VIIWF Details Operating December 2013
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
RTO ISO LMP Node Designation | MEC.VIENNA1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | MEC.VIENNA1 |
Nameplate Capacity | 44.6 MW |
Summer Capacity | 44.6 MW |
Winter Capacity | 44.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2013 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 19 |
Planned New Prime Mover | WT |
Planned Energy Source | WND |
Planned New Nameplate Capacity | 38.6 MW |
Planned Repower | October 2024 |
Other Planned Modifications | No |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 19 |
---|---|
Predominant Turbine Manufacturer | Siemens |
Predominant Turbine Model Number | SWT-2.3-108 |
Design Wind Speed | 16.8 MPH |
Wind Quality Class | 3 - Low Wind |
Turbine Hub Height Feet | 262.4 |
Vienna Wind Farm Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#418 | Prairie Rose Wind Farm | Hardwick, MN | 413.4 GWh |
#419 | Chickasaw Wind Farm | New Hampton, IA | 412.9 GWh |
#420 | Cottonwood Wind Energy Center | Blue Hill, NE | 412.2 GWh |
#421 | Keechi Wind | Jacksboro, TX | 411.9 GWh |
#422 | Mesteno | Rio Grande City, TX | 411.4 GWh |
#423 | Skookumchuck Wind Facility | Rainier, WA | 410.3 GWh |
#424 | Buffalo Gap 2 Wind Farm | Merkel, TX | 410.0 GWh |
#425 | Pioneer Hutt Wind Energy | Midland, TX | 409.1 GWh |
#426 | Osceola Windpower LLC | Harris, IA | 405.8 GWh |
#427 | Midway Wind, LLC | Taft, TX | 404.7 GWh |
#429 | Fowler Ridge IV Wind Farm LLC | Fowler, IN | 402.8 GWh |
#430 | Mesquite Wind Power LLC | Abilene, TX | 401.3 GWh |
#431 | Ranchland Wind Project I | Cisco, TX | 400.8 GWh |
#432 | Lost Creek Wind Energy Facility | King City, MO | 400.1 GWh |
#433 | Meadow Lake Wind Farm LLC | Lafayette, IN | 399.0 GWh |
#434 | Peyton Creek Wind Farm LLC | Bay City, TX | 398.3 GWh |
#435 | Roscoe Wind Farm LLC | Roscoe, TX | 397.4 GWh |
#436 | McAdoo Wind Energy LLC | McAdoo, TX | 395.1 GWh |
#437 | Callahan Divide Wind Energy Center | Tusocola, TX | 394.7 GWh |
#438 | White Oak Energy LLC | Carlock, IL | 394.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Vienna Wind Farm.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alliant SBD 9107 JBS USA | Marshalltown, IA | 34.3 MWh | 9.5 mi |
Cedar Falls Solar Farm | Cedar Falls, IA | 2.3 GWh | 27.5 mi |
Dike City Power Plant | Dike, IA | 60.0 MWh | 22.3 mi |
Electrifarm | Waterloo, IA | 11.6 GWh | 26.6 mi |
FPL Energy Story Wind LLC | Zearing, IA | 573.8 GWh | 25.7 mi |
Garden Wind LLC | Zearing, IA | 372.5 GWh | 30.9 mi |
Grundy Center City Light Plant | Grundy Center, IA | 388.1 MWh | 14.1 mi |
Ivester Wind Farm | Wellsburg, IA | 338.4 GWh | 14.8 mi |
La Porte | La Porte City, IA | 98.0 MWh | 31.7 mi |
Laurel Wind Farm | Laurel, IA | 431.3 GWh | 20.7 mi |
Marshalltown | Marshalltown, IA | 122.1 GWh | 8.8 mi |
Marshalltown Generating Station | Marshalltown, IA | 3.3 TWh | 9.4 mi |
State Center | State Center, IA | 53.0 MWh | 22.2 mi |
Streeter Station | Cedar Falls, IA | 7.5 GWh | 30.7 mi |
Traer Main | Traer, IA | 7.0 MWh | 16.2 mi |
Traer Wind Project | Traer, IA | 5.8 GWh | 17.1 mi |
University of Northern Iowa | Cedar Falls, IA | 19.6 GWh | 29.3 mi |
Venus Wind 3 LLC | Grinnell, IA | 5.5 GWh | 29.3 mi |
Waterloo Lundquist | Waterloo, IA | 69.0 MWh | 32.5 mi |
Wellsburg Wind Project | Wellsburg, IA | 441.8 GWh | 18.7 mi |