Victor Valley CC CPV Solar
18422 Bear Valley Road, Victorville, CA 92395Plant Summary Information
Victor Valley CC CPV Solar is ranked #544 out of 801 solar farms in California in terms of total annual net electricity generation.
Victor Valley CC CPV Solar generated 510.2 MWh during the 3-month period between September 2022 to December 2022.
Plant Name | Victor Valley CC CPV Solar |
---|---|
Utility Name | Victor Valley Community College District |
Location | San Bernardino County, CA |
Initial Operation Date | June 2010 |
Last Update | Dec 2022 |
Annual Generation | 2.8 GWh |
Annual Consumption | 10.4 k MMBtu |
Ranked #9,163 out of 11,866 Power Plants Nationwide | |
Ranked #4,006 out of 5,672 Solar Power Plants Nationwide | |
Ranked #1,260 out of 1,571 California Power Plants | |
Ranked #544 out of 801 California Solar Power Plants | |
Fuel Types | Solar |
Map of Victor Valley CC CPV Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Victor Valley CC CPV Solar.
Monthly Net Generation for Victor Valley CC CPV Solar
Victor Valley CC CPV Solar Details
Summary Information | |
---|---|
Plant Name | Victor Valley CC CPV Solar (57254) |
Plant Address | 18422 Bear Valley Road, Victorville, CA 92395 |
Utility | Victor Valley Community College District (56618) |
Latitude, Longitude | 34.48017, -117.25794 |
Generation Dates on File | Jun 2010 to Dec 2022 |
Initial Operation Date | June 2010 |
Annual Generation | 2.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Educational Services (611) |
Sector | Commercial Non-CHP (4) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 416.00 kV |
Energy Storage | No |
Generator 1PV Details Operating June 2010
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2010 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Multiple Fuels | No |
Solar Details | |
Dual Axis Tracking | Yes |
---|---|
DC Net Capacity | 1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Victor Valley CC CPV Solar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3996 | DG Tufts Knoll LLC CSG | North Grafton, MA | 2.8 GWh |
#3997 | Fairview Farms Solar | Whately, MA | 2.8 GWh |
#3998 | Goose Lake MN DPC-GM | Albert Lea, MN | 2.8 GWh |
#3999 | Limelight Solar II LLC | Spartanburg, SC | 2.8 GWh |
#4000 | Spruce - WCMD - Resh I | Hagerstown, MD | 2.8 GWh |
#4001 | Lincoln Financial Field | Philadelphia, PA | 2.8 GWh |
#4002 | Farmington Solar Farm | Farmington, MO | 2.8 GWh |
#4003 | Technology Drive Solar | Brattleboro, VT | 2.8 GWh |
#4004 | IMPA Huntingburg Solar Park | Huntingburg, IN | 2.8 GWh |
#4005 | HQC Rock River Solar Power Gen Station | Beloit, WI | 2.8 GWh |
#4007 | Kelly Bridge Road Community Solar Farm | Liberty, NY | 2.8 GWh |
#4008 | Elizabethtown Solar | Elizabethtown, PA | 2.8 GWh |
#4009 | Hobart & William Smith College Gates Rd. | Geneva, NY | 2.8 GWh |
#4010 | Atascadero State Hospital | Atascadero, CA | 2.8 GWh |
#4011 | Charter Durabar at Woodstock | Woodstock, IL | 2.8 GWh |
#4012 | Bd of Educ of Queen Anne's Cnty, Cnty HS | Centreville, MD | 2.8 GWh |
#4013 | Stetson Road Solar - Barre I | Barre, MA | 2.8 GWh |
#4014 | Chittenden County Solar Partners | South Burlington, VT | 2.8 GWh |
#4015 | Nickel 1 Solar Facility | Lost Hills, CA | 2.8 GWh |
#4016 | Atlantic City Convention Center | Atlantic City, NJ | 2.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Victor Valley CC CPV Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Adelanto Solar II, LLC | Adelanto, CA | 17.0 GWh | 8.6 mi |
Adelanto Solar Project | Adelanto, CA | 11.5 GWh | 11.2 mi |
Adelanto Solar, LLC | Adelanto, CA | 54.9 GWh | 8.6 mi |
Expressway Solar A | Victorville, CA | 3.8 GWh | 8.5 mi |
Expressway Solar B | Victorville, CA | 4.1 GWh | 8.5 mi |
Expressway Solar C2 | Victorville, CA | 3.5 GWh | 8.6 mi |
Foundation Cemex River Plant | Victorville, CA | 3.3 GWh | 6.3 mi |
Hesperia | Hesperia, CA | 3.3 GWh | 7.5 mi |
High Desert Power Plant | Victorville, CA | 4.5 TWh | 10 mi |
Longboat Solar, LLC | Barstow, CA | 25.1 GWh | 12 mi |
Navajo Solar Power Generation Station 1 LLC | Apple Valley, CA | 4.2 GWh | 6.2 mi |
Nunn | Apple Valley, CA | 2.1 GWh | 6.2 mi |
Otoe Solar Power Generation Station 1 LLC | Apple Valley, CA | 3.5 GWh | 5.8 mi |
Powhatan Solar Power Generation Station 1 LLC | Apple Valley, CA | 3.9 GWh | 6.5 mi |
SunEdison Walmart Apple Valley DC | Apple Valley, CA | 969.0 MWh | 8.8 mi |
Victor Dry Farm Ranch A | Victorville, CA | 8.8 GWh | 12 mi |
Victor Mesa Linda B2 | Victorville, CA | 2.1 GWh | 7.7 mi |
Victor Mesa Linda C2 | Victorville, CA | 2.0 GWh | 7.7 mi |
Victor Mesa Linda D2 | Victorville, CA | 3.7 GWh | 7.6 mi |
Victor Mesa Linda E2 | Victorville, CA | 3.6 GWh | 7.6 mi |