Victor Mesa Linda D2
12605 Seneca Road, Victorville, CA 92392Plant Summary Information
Victor Mesa Linda D2 is ranked #454 out of 747 solar farms in California in terms of total annual net electricity generation.
Victor Mesa Linda D2 generated 1.0 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Victor Mesa Linda D2 |
---|---|
Utility Name | AES Distributed Energy |
Location | San Bernardino County, CA |
Initial Operation Date | November 2014 |
Last Update | Dec 2022 |
Annual Generation | 4.0 GWh |
Annual Consumption | 14.4 k MMBtu |
Ranked #8,007 out of 11,249 Power Plants Nationwide | |
Ranked #3,035 out of 5,158 Solar Power Plants Nationwide | |
Ranked #1,121 out of 1,501 California Power Plants | |
Ranked #454 out of 747 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
sPower (2013 to 2013) Sustainable Power Group, LLC (2014 to 2020) AES Distributed Energy (2021 to 2022) |
Map of Victor Mesa Linda D2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Victor Mesa Linda D2.
Monthly Net Generation for Victor Mesa Linda D2
Victor Mesa Linda D2 Details
Summary Information | |
---|---|
Plant Name | Victor Mesa Linda D2 (59271) |
Plant Address | 12605 Seneca Road Victorville, CA 92392 |
Utility | AES Distributed Energy (61012) |
Latitude, Longitude | 34.50944, -117.38722 |
Generation Dates on File | Nov 2014 to Dec 2022 |
Initial Operation Date | November 2014 |
Annual Generation | 4.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator VMLD2 Details Operating November 2014
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2014 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Carbon Capture Technology | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 2.1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Victor Mesa Linda D2 Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3025 | Victor Mesa Linda B2 | Victorville, CA | 4.0 GWh |
#3026 | Vallecitos Water District | San Marcos, CA | 4.0 GWh |
#3027 | Aerojet II | Rancho Cordova, CA | 4.0 GWh |
#3028 | Victor Mesa Linda C2 | Victorville, CA | 4.0 GWh |
#3029 | Atkinson Solar II | Beulaville, NC | 4.0 GWh |
#3030 | Berkley East Solar LLC | Berkley, MA | 4.0 GWh |
#3031 | Rockford CSG | Rockford, IL | 4.0 GWh |
#3032 | City of Bowie | Mitchellville, MD | 4.0 GWh |
#3033 | Charlemont A | Charlemont, MA | 4.0 GWh |
#3034 | Duke Building 98 | Indianapolis, IN | 4.0 GWh |
#3036 | Waterford Holdco CSG | Waterford, MN | 4.0 GWh |
#3037 | Cedarville Road | Lena, IL | 4.0 GWh |
#3038 | Mendon | Mendon, MA | 4.0 GWh |
#3039 | Dover CSG | Dover Plains, NY | 4.0 GWh |
#3040 | Sun Harvest Solar NDP1 | Dos Palos, CA | 4.0 GWh |
#3041 | Soboba Community Solar Project | San Jacinto, CA | 4.0 GWh |
#3042 | Kinston | Kinston, NC | 4.0 GWh |
#3043 | Rising Paper | Great Barrington, MA | 4.0 GWh |
#3044 | Syncarpha El Rito | El Rito, NM | 4.0 GWh |
#3045 | Ballenger Road Solar A | Inman, SC | 4.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Victor Mesa Linda D2.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Adelanto Solar II, LLC | Adelanto, CA | 17.3 GWh | 3.3 mi |
Adelanto Solar Project | Adelanto, CA | 11.7 GWh | 4 mi |
Adelanto Solar, LLC | Adelanto, CA | 52.6 GWh | 3.3 mi |
Coronus Adelanto West 1 | Adelanto, CA | 3.0 GWh | 5.1 mi |
Coronus Adelanto West 2 | Adelanto, CA | 3.7 GWh | 5.1 mi |
Expressway Solar A | Victorville, CA | 5.1 GWh | 5.7 mi |
Expressway Solar B | Victorville, CA | 4.5 GWh | 5.8 mi |
Expressway Solar C2 | Victorville, CA | 2.5 GWh | 5.8 mi |
Foundation Cemex River Plant | Victorville, CA | 3.0 GWh | 5.8 mi |
Hesperia | Hesperia, CA | 3.1 GWh | 5.2 mi |
High Desert Power Plant | Victorville, CA | 4.5 TWh | 6.1 mi |
Industry Solar Power Generation Station 1 LLC | Adelanto, CA | 4.5 GWh | 5 mi |
RE Victor Phelan Solar One LLC | Adelanto, CA | 44.0 GWh | 5.1 mi |
SCE-Snowline-White Road (North) | Phelan, CA | 3.1 GWh | 7.9 mi |
Victor Dry Farm Ranch A | Victorville, CA | 10.5 GWh | 4.6 mi |
Victor Dry Farm Ranch B | Victorville, CA | 9.7 GWh | 4.8 mi |
Victor Mesa Linda B2 | Victorville, CA | 4.0 GWh | 0.2 mi |
Victor Mesa Linda C2 | Victorville, CA | 4.0 GWh | 0.1 mi |
Victor Mesa Linda E2 | Victorville, CA | 3.9 GWh | 0.1 mi |
Victor Valley CC CPV Solar | Victorville, CA | 2.9 GWh | 7.6 mi |