Vernon Dam
76 Governor Hunt Road, Vernon, VT 5354Plant Summary Information
Vernon Dam is ranked #3 out of 111 power plants in Vermont in terms of total annual net electricity generation.
Vernon Dam is comprised of 10 generators and generated 43.4 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Vernon Dam |
---|---|
Utility Name | Great River Hydro, LLC |
Location | Windham County, VT |
Initial Operation Date | August 1909 |
Last Update | Dec 2023 |
Annual Generation | 190.6 GWh |
Annual Consumption | 701.8 k MMBtu |
Ranked #2,371 out of 11,852 Power Plants Nationwide | |
Ranked #226 out of 1,371 Water Power Plants Nationwide | |
Ranked #3 out of 111 Vermont Power Plants | |
Ranked #3 out of 45 Vermont Water Power Plants | |
Fuel Types | Water |
Previous Operator |
TransCanada Hydro Northeast Inc., (2013 to 2016) Great River Hydro, LLC (2017 to 2023) |
Map of Vernon Dam
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Vernon Dam.
Monthly Net Generation for Vernon Dam
Vernon Dam Details
Summary Information | |
---|---|
Plant Name | Vernon Dam (2352) |
Plant Address | 76 Governor Hunt Road, Vernon, VT 5354 |
Utility | Great River Hydro, LLC (61122) |
Latitude, Longitude | 42.77165, -72.5146 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | August 1909 |
Annual Generation | 190.6 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 98-91-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Connecticut River |
Ash Impoundment | No |
Transmission / Distribution Owner | New England Power Company (13433) |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Generator 1 Details Operating August 1909
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 599 |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.4 MW |
Winter Capacity | 2.4 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 1909 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 2 Details Operating August 1909
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 599 |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.4 MW |
Winter Capacity | 2.4 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 1909 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 3 Details Operating August 1909
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 599 |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.4 MW |
Winter Capacity | 2.4 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 1909 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 4 Details Operating August 1909
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 599 |
Nameplate Capacity | 2.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.4 MW |
Winter Capacity | 2.4 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 1909 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 10 Details Operating January 1921
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 599 |
Nameplate Capacity | 4.2 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 4 MW |
Winter Capacity | 4 MW |
Minimum Load | 4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1921 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 9 Details Operating January 1921
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 599 |
Nameplate Capacity | 4.2 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 4 MW |
Winter Capacity | 4 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1921 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 6A Details Operating March 2008
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 599 |
Nameplate Capacity | 5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 4.5 MW |
Winter Capacity | 4.5 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 2008 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 7A Details Operating March 2008
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 599 |
Nameplate Capacity | 5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 4.5 MW |
Winter Capacity | 4.5 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 2008 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 8 Details Operating March 2008
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 599 |
Nameplate Capacity | 4.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 3.6 MW |
Winter Capacity | 3.6 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2008 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 5 Details Operating April 2008
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 599 |
Nameplate Capacity | 4.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 3.6 MW |
Winter Capacity | 3.6 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2008 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Vernon Dam Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#216 | Wateree Hydro | Ridgeway, SC | 201.3 GWh |
#217 | Salt Springs | Pioneer, CA | 200.8 GWh |
#218 | West Point (GA) | West Point, GA | 198.7 GWh |
#219 | Caribou 1 | Belden, CA | 197.9 GWh |
#220 | Claytor | Radford, VA | 197.8 GWh |
#221 | Eklutna Hydro Project | Palmer, AK | 197.8 GWh |
#222 | H Neely Henry Dam | Ohatchee, AL | 196.7 GWh |
#223 | Pit 1 | Burney, CA | 195.3 GWh |
#224 | Wilder | Hartford, VT | 192.4 GWh |
#225 | John C Boyle | Keno, OR | 192.0 GWh |
#227 | Cowlitz Falls | Randle, WA | 190.4 GWh |
#228 | Carmen Smith | McKenzie Bridge, OR | 188.6 GWh |
#229 | Lower Salmon | Hagerman, ID | 187.9 GWh |
#230 | Nantahala | Topton, NC | 186.1 GWh |
#231 | Kern River 3 | Kernville, CA | 184.5 GWh |
#232 | Balch 1 | Balch Camp, CA | 184.4 GWh |
#233 | Weiss Dam | Leesburg, AL | 183.2 GWh |
#234 | Pardee | Valley Springs, CA | 181.6 GWh |
#235 | Cheatham | Ashland City, TN | 177.3 GWh |
#236 | Charles E Monty | Lewiston, ME | 176.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Vernon Dam.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Axio Green LLC | Greenfield Township, MA | 2.1 GWh | 14.4 mi |
Cabot | Montague, MA | 394.4 GWh | 13.1 mi |
Deerfield 2 | Conway, MA | 39.4 GWh | 16.9 mi |
Deerfield 3 | Buckland, MA | 34.4 GWh | 16.3 mi |
Deerfield 4 | Buckland, MA | 29.0 GWh | 15.4 mi |
Deerfield CSG Solar | Deerfield, MA | 5.6 GWh | 14.9 mi |
Erving CSG | Erving, MA | 1.4 GWh | 11.8 mi |
Erving Paper Mills | Erving, MA | 42.5 GWh | 13.6 mi |
French King Solar LLC | Erving, MA | 7.3 GWh | 12.3 mi |
Gardners Falls | Buckland, MA | 17.7 GWh | 16.6 mi |
Greenfield Solar PV | Greenfield, MA | 3.0 GWh | 9.7 mi |
Kearsarge Gill | Gill, MA | 2.8 GWh | 7.2 mi |
Kearsarge Montague | Montague, MA | 6.8 GWh | 13 mi |
Kearsarge Montague BD(CSG) | Montague, MA | 3.3 GWh | 13 mi |
NFM Solar Power LLC | Northfield, MA | 1.7 GWh | 11.3 mi |
Orange PV | Orange, MA | 2.3 GWh | 17.1 mi |
Technology Drive Solar | Brattleboro, VT | 2.8 GWh | 7.7 mi |
Turners Falls | Montague, MA | 13.9 GWh | 11.6 mi |
W. Orange Rd Solar LLC | Orange, MA | 7.2 GWh | 14.6 mi |
Wilbur Woods Solar LLC | Orange, MA | 8.1 GWh | 14 mi |