Verdi
Hwy 80, Verdi, NV 89439Plant Summary Information
Verdi is ranked #3 out of 6 hydroelectric power plants in Nevada in terms of total annual net electricity generation.
Verdi is comprised of 1 generator and generated 4.9 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Verdi |
---|---|
Utility Name | Truckee Meadows Water Authority |
Location | Washoe County, NV |
Initial Operation Date | January 1911 |
Last Update | Aug 2024 |
Annual Generation | 19.1 GWh |
Annual Consumption | 71.0 k MMBtu |
Ranked #5,111 out of 11,835 Power Plants Nationwide | |
Ranked #774 out of 1,371 Water Power Plants Nationwide | |
Ranked #94 out of 109 Nevada Power Plants | |
Ranked #3 out of 6 Nevada Water Power Plants | |
Fuel Types | Water |
Map of Verdi
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Verdi.
Monthly Net Generation for Verdi
Verdi Details
Summary Information | |
---|---|
Plant Name | Verdi (6531) |
Plant Address | Hwy 80, Verdi, NV 89439 |
Utility | Truckee Meadows Water Authority (56369) |
Latitude, Longitude | 39.3125, -119.585 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | January 1911 |
Annual Generation | 19.1 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Nevada Power Company (NEVP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Truckee River |
Ash Impoundment | No |
Transmission / Distribution Owner | Sierra Pacific Power Co (17166) NV |
Grid Voltage | 25.00 kV |
Energy Storage | No |
Generator 1 Details Operating January 1911
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 2.4 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 2.4 MW |
Winter Capacity | 2.4 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1911 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Verdi Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#764 | Magic Dam Hydroelectric Project | Shoshone, ID | 20.0 GWh |
#765 | Oakdale | Monticello, IN | 20.0 GWh |
#766 | Brassua Hydroelectric Project | Rockwood, ME | 19.9 GWh |
#767 | Newport | Newport, VT | 19.8 GWh |
#768 | Clark Falls | Milton, VT | 19.8 GWh |
#769 | Deep Creek | Oakland, MD | 19.7 GWh |
#770 | Foothill Feeder | Castaic, CA | 19.6 GWh |
#771 | Fort Miller Hydroelectric Facility | Northumberland, NY | 19.5 GWh |
#772 | Gaston Shoals | Blacksburg, SC | 19.3 GWh |
#773 | Power Creek | Cordova, AK | 19.2 GWh |
#775 | Kansas River Project | Lawrence, KS | 19.0 GWh |
#776 | Alexander | Merrill, WI | 19.0 GWh |
#777 | Rochester 5 | Rochester, NY | 18.9 GWh |
#778 | Pioneer | Ogden, UT | 18.7 GWh |
#779 | PEC Headworks | Moses Lake, WA | 18.7 GWh |
#780 | Nacimiento Hydro Project | Bradley, CA | 18.6 GWh |
#781 | Nottely | Blairsville, GA | 18.6 GWh |
#782 | Lower Molina | Molina, CO | 18.6 GWh |
#783 | Lachute Hydro Lower | Ticonderoga, NY | 18.5 GWh |
#784 | Lachute Hydro Upper | Ticonderoga, NY | 18.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Verdi.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Fleish | Fleish, NV | 20.7 GWh | 1.9 mi |
Fort Churchill | Yerington, NV | 508.0 GWh | 27.4 mi |
Ft. Churchill PV | Yerington, NV | 23.7 GWh | 27 mi |
Galena 2 Geothermal Power Plant | Reno, NV | 38.1 GWh | 10.5 mi |
Galena 3 Geothermal Power Plant | Reno, NV | 92.1 GWh | 10.2 mi |
Lahontan | Fallon, NV | 8.4 GWh | 29.6 mi |
New Lahontan | Fallon, NV | 17.2 GWh | 29.7 mi |
Richard Burdette Geothermal | Reno, NV | 110.1 GWh | 10.6 mi |
Stampede | Truckee, CA | 6.5 GWh | 29.8 mi |
Steamboat Hills LP | Reno, NV | 235.6 GWh | 10.5 mi |
Steamboat II | Reno, NV | 42.1 GWh | 10.4 mi |
Steamboat III | Reno, NV | 45.6 GWh | 10.4 mi |
Tesla Reno GigaFactory | Sparks, NV | 11.1 GWh | 17.5 mi |
Tracy | Sparks, NV | 4.0 TWh | 17.6 mi |
Turquoise Liberty Solar | Sparks, NV | 14.8 GWh | 19.5 mi |
Turquoise Nevada, LLC | Sparks, NV | 106.3 GWh | 18.4 mi |
Washoe | Verdi, NV | 11.1 GWh | 1.5 mi |
Waste Management Lockwood LFGTE | Sparks, NV | 23.7 GWh | 12.6 mi |
Western 102 Power Plant | McCarran, NV | 491.8 GWh | 17.6 mi |
Whitegrass No. 1 | Yerington, NV | 17.7 GWh | 24 mi |