Venable Solar 2
882 S Intake Boulevard, Blythe, CA 92225Plant Summary Information
Venable Solar 2 is ranked #501 out of 801 solar farms in California in terms of total annual net electricity generation.
Venable Solar 2 generated 742.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Venable Solar 2 |
---|---|
Utility Name | Venable Solar, LLC |
Location | Riverside County, CA |
Initial Operation Date | April 2015 |
Last Update | Dec 2023 |
Annual Generation | 3.4 GWh |
Annual Consumption | 11.7 k MMBtu |
Ranked #8,711 out of 11,866 Power Plants Nationwide | |
Ranked #3,616 out of 5,672 Solar Power Plants Nationwide | |
Ranked #1,205 out of 1,571 California Power Plants | |
Ranked #501 out of 801 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Belectric Inc (2013 to 2013) Venable Solar, LLC (2014 to 2023) |
Map of Venable Solar 2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Venable Solar 2.
Monthly Net Generation for Venable Solar 2
Venable Solar 2 Details
Summary Information | |
---|---|
Plant Name | Venable Solar 2 (58290) |
Plant Address | 882 S Intake Boulevard, Blythe, CA 92225 |
Utility | Venable Solar, LLC (59455) |
Latitude, Longitude | 33.59722, -114.57167 |
Generation Dates on File | Apr 2015 to Dec 2023 |
Initial Operation Date | April 2015 |
Annual Generation | 3.4 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF15-142-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 12.00 kV |
Energy Storage | No |
Generator VSPV Details Operating April 2015
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2015 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 198 |
Tilt Angle | 20 |
DC Net Capacity | 1.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Venable Solar 2 Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3606 | NSE Camber Solar PS11 LLC (CSG) | Sterling, CO | 3.4 GWh |
#3607 | Venable Solar 1 | Blythe, CA | 3.4 GWh |
#3608 | Archdiocese of Baltimore L | Perryman, MD | 3.4 GWh |
#3609 | Norcap North | East Windsor, CT | 3.4 GWh |
#3610 | Lannon Stone | Pewaukee, WI | 3.4 GWh |
#3611 | Pika Solar | Mt. Angel, OR | 3.4 GWh |
#3612 | General Dynamics | Hampton, AR | 3.4 GWh |
#3613 | Oak Leaf - CSG Portfolio (OL 44) | Watkins, CO | 3.4 GWh |
#3614 | Bulldog Solar One, LLC | Bowie, MD | 3.4 GWh |
#3615 | Forbes Street Solar | East Providence, RI | 3.4 GWh |
#3617 | ELP Saugerties CSG | Saugerties, NY | 3.4 GWh |
#3618 | Hardwick-Athol & Eagle Hill | Hardwick, MA | 3.4 GWh |
#3619 | Oak Hill Solar Array | Evansville, IN | 3.4 GWh |
#3620 | Owens Corning at Bethlehem | Bethlehem, NY | 3.4 GWh |
#3621 | HCE Johnston I, LLC | Willow Springs, NC | 3.4 GWh |
#3622 | Summer Solar A2 | Lancaster, CA | 3.4 GWh |
#3623 | Cedar Creek Solar, LLC | Winder, GA | 3.4 GWh |
#3624 | NSE Camber Solar PS6 LLC CSG | Platteville, CO | 3.4 GWh |
#3625 | Copperfield | Troy, NC | 3.4 GWh |
#3626 | Slate Hill(CSG) | Johnson, NY | 3.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Venable Solar 2.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arica Solar | Desert Center, CA | 470.0 GWh | 43.4 mi |
Arlington Energy Center II | Blythe, CA | 631.1 GWh | 13.4 mi |
Arlington Energy Center III | Blythe, CA | 268.7 GWh | 13.4 mi |
Blythe Energy Inc | Blythe, CA | 873.9 GWh | 6.7 mi |
Blythe Mesa Solar II | Blythe, CA | 545.4 GWh | 6.9 mi |
Blythe Solar 110, LLC | Blythe, CA | 584.2 GWh | 11.3 mi |
Blythe Solar II, LLC | Blythe, CA | 329.6 GWh | 10.8 mi |
Blythe Solar III, LLC Hybrid | Blythe, CA | 346.2 GWh | 10.6 mi |
Blythe Solar IV, LLC | Blythe, CA | 301.7 GWh | 12.7 mi |
Chuckawalla Solar | Blythe, CA | 6.8 GWh | 20 mi |
Chuckawalla Valley State Prison | Blythe, CA | 1.2 GWh | 19.2 mi |
Genesis Solar Energy Project | Blythe, CA | 609.1 GWh | 25 mi |
Headgate Rock | Parker, AZ | 32.3 GWh | 42.9 mi |
Ironwood Solar LLC | Blythe, CA | 8.2 GWh | 20.1 mi |
McCoy Solar Energy Project Hybrid | Blythe, CA | 524.7 GWh | 11.8 mi |
Palo Verde College | Blythe, CA | 2.0 GWh | 6.4 mi |
Solar Blythe 2 | Blythe, CA | 40.5 GWh | 7.3 mi |
Solar Blythe LLC | Blythe, CA | 40.5 GWh | 9.9 mi |
SunEdison Ironwood State Prison | Blythe, CA | 1.3 GWh | 20 mi |
Venable Solar 1 | Blythe, CA | 3.4 GWh | 0.1 mi |