Vancourt Solar Interconnections
13156 FM 3067, La Feria, TX 78559Plant Summary Information
Vancourt Solar Interconnections is ranked #97 out of 166 solar farms in Texas in terms of total annual net electricity generation.
Vancourt Solar Interconnections generated 26.3 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Vancourt Solar Interconnections |
---|---|
Utility Name | Rayos del Sol Solar Project, LLC |
Location | Cameron County, TX |
Initial Operation Date | September 2022 |
Last Update | Sep 2024 |
Annual Generation | 86.2 GWh |
Annual Consumption | 326.0 k MMBtu |
Ranked #3,355 out of 11,852 Power Plants Nationwide | |
Ranked #657 out of 5,655 Solar Power Plants Nationwide | |
Ranked #467 out of 754 Texas Power Plants | |
Ranked #97 out of 166 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of Vancourt Solar Interconnections
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Vancourt Solar Interconnections.
Monthly Net Generation for Vancourt Solar Interconnections
Vancourt Solar Interconnections Details
Summary Information | |
---|---|
Plant Name | Vancourt Solar Interconnections (65662) |
Plant Address | 13156 FM 3067, La Feria, TX 78559 |
Utility | Rayos del Sol Solar Project, LLC (64917) |
Latitude, Longitude | 26.0901, -97.79845 |
Generation Dates on File | Oct 2022 to Sep 2024 |
Initial Operation Date | September 2022 |
Annual Generation | 86.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator VAN1 Details Operating September 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 45 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 45 MW |
Winter Capacity | 45 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Tilt Angle | 60 |
DC Net Capacity | 59.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 59.5 MW |
Virtual Net Metering Agreement | No |
Vancourt Solar Interconnections Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#647 | Hazlehurst II | Hazlehurst, GA | 88.5 GWh |
#648 | Sanford Solar | Sanford, ME | 88.5 GWh |
#649 | OCI Alamo Solar I Hybrid | San Antonio, TX | 88.3 GWh |
#650 | Pecan Tree | Defuniak Springs, FL | 88.3 GWh |
#651 | Sunnybrook Solar Project - Hybrid | Scottsburg, VA | 88.0 GWh |
#652 | Kayenta Solar Project | Kayenta, AZ | 87.9 GWh |
#653 | Black Mesa Solar, LLC | King Hill, ID | 86.9 GWh |
#654 | OE_AZ1 | Salome, AZ | 86.7 GWh |
#655 | Citrus Ridge Solar | Bay Lake, FL | 86.7 GWh |
#656 | Gulf Coast Solar Center III | Bellview, FL | 86.5 GWh |
#658 | Sycamore Solar | Gretna, VA | 85.6 GWh |
#659 | Wild Quail | Defuniak Springs, FL | 85.6 GWh |
#660 | Grazing Yak Solar | Calhan, CO | 85.6 GWh |
#661 | Steel Solar LLC | Plymouth, UT | 85.1 GWh |
#662 | Brightside | Beeville, TX | 85.0 GWh |
#663 | Edwards Sanborn S3 | Mojave, CA | 80.0 GWh |
#664 | Little Bear Solar 1, LLC | Mendota, CA | 83.5 GWh |
#665 | CPV Stagecoach Solar | Andersonville, GA | 83.4 GWh |
#666 | Seville 2 | Ocotillo Wells, CA | 83.0 GWh |
#667 | Spectrum Solar PV Power Project | Las Vegas, NV | 83.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Vancourt Solar Interconnections.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Cameron Wind 1 LLC | Rio Hondo, TX | 346.0 GWh | 21.9 mi |
E. Porte Ct. | Harlingen, TX | 599.0 MWh | 10.9 mi |
HEB00038 | San Juan, TX | 241.0 MWh | 24 mi |
La Chalupa, LLC | Rio Hondo, TX | 445.4 GWh | 20.9 mi |
Las Majadas Wind Farm | Santa Monica, TX | 859.5 GWh | 24.6 mi |
Los Vientos Wind 1A | Sebastian, TX | 348.5 GWh | 21.2 mi |
Los Vientos Wind 1B | Sebastian, TX | 179.3 GWh | 19.7 mi |
Nebula Solar | La Feria, TX | 253.2 GWh | 0 mi |
Palmas Wind, LLC | Rio Hondo, TX | 326.0 GWh | 23.2 mi |
Raymond Wind Farm, LLC | Lyford, TX | 611.8 GWh | 19 mi |
Ridge Rd | Alamo, TX | 684.0 MWh | 19.4 mi |
Rio Grande Valley Sugar Growers | Santa Rosa, TX | 92.0 MWh | 13.1 mi |
San Roman Wind I, LLC | Los Fresnos, TX | 224.1 GWh | 26.2 mi |
Santa Rosa | Santa Rosa, TX | 706.0 MWh | 9.8 mi |
Silas Ray | Brownsville, TX | 125.1 GWh | 21.1 mi |
Vaquero | Harlingen, TX | 709.0 MWh | 10.5 mi |
Villa Cavasos | Brownsville, TX | 696.0 MWh | 13.4 mi |
WAL456 | Brownsville, TX | 374.0 MWh | 19 mi |
WAL5165 | Alamo, TX | 391.0 MWh | 21.6 mi |
West Raymond Wind Farm LLC | Lyford, TX | 706.0 GWh | 23.2 mi |