Valfilm Wind Project

12325 Township Road 99, Findlay, OH 45840

Plant Summary Information

Valfilm Wind Project is ranked #17 out of 22 wind farms in Ohio in terms of total annual net electricity generation.

Valfilm Wind Project generated 2.0 GWh during the 3-month period between September 2023 to December 2023.

Plant NameValfilm Wind Project
Utility NameOEE XXV LLC
LocationHancock County, OH
Initial Operation DateSeptember 2018
Last Update Dec 2023
Annual Generation 6.9 GWh
Annual Consumption 26.3 k MMBtu
Ranked #6,965 out of 11,835 Power Plants Nationwide
Ranked #1,153 out of 1,343 Wind Power Plants Nationwide
Ranked #92 out of 182 Ohio Power Plants
Ranked #17 out of 22 Ohio Wind Power Plants
Fuel Types Wind

Map of Valfilm Wind Project

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Valfilm Wind Project.

Create Your Account Today

Monthly Net Generation for Valfilm Wind Project

Valfilm Wind Project Details

Summary Information
Plant NameValfilm Wind Project (61356)
Plant Address12325 Township Road 99, Findlay, OH 45840
UtilityOEE XXV LLC (60996)
Latitude, Longitude41.08433, -83.64413
Generation Dates on FileSep 2018 to Dec 2023
Initial Operation DateSeptember 2018
Annual Generation 6.9 GWh
Fuel Types Wind
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionRFC
Balancing AuthorityPJM Interconnection, LLC (PJM)
NAICS CodePlastics Material and Resin Manufacturing (325211)
Sector Industrial Non-CHP (6)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerAmerican Transmission Systems Inc (56162)
Grid Voltage 37.50 kV
Energy StorageNo

Generator W1 Details Operating September 2018

TechnologyOnshore Wind Turbine
Prime MoverWind Turbine, Onshore
OwnershipSingle Owner
Nameplate Capacity1.5 MW
Summer Capacity1.5 MW
Winter Capacity1.5 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateSeptember 2018
Combined Heat & Power No
Sector NameIndustrial Non-CHP (6)
Energy SourceWind
Turbines/Hydrokinetic Buoys1
Turbine Details
Number Of Turbines1
Predominant Turbine ManufacturerGoldwind
Predominant Turbine Model NumberGW 87/1500
Design Wind Speed14 MPH
Wind Quality Class3 - Low Wind
Turbine Hub Height Feet262

Generator W2 Details Operating September 2018

TechnologyOnshore Wind Turbine
Prime MoverWind Turbine, Onshore
OwnershipSingle Owner
Nameplate Capacity1.5 MW
Summer Capacity1.5 MW
Winter Capacity1.5 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateSeptember 2018
Combined Heat & Power No
Sector NameIndustrial Non-CHP (6)
Energy SourceWind
Turbines/Hydrokinetic Buoys1
Turbine Details
Number Of Turbines1
Predominant Turbine ManufacturerGoldwind
Predominant Turbine Model NumberGW 87/1500
Design Wind Speed14 MPH
Wind Quality Class3 - Low Wind
Turbine Hub Height Feet262

Valfilm Wind Project Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Wind.

RankPlant NamePlant LocationAnnual Generation
#1143Dinosaur PointLos Banos, CA7.9 GWh
#1144Polk County Renewables, LLCOsceola, NE7.8 GWh
#1145Anchor Wind, LLCMechanicsville, IA7.8 GWh
#1146RP WindRussells Point, OH7.6 GWh
#1147Lake Region Community Hybrid, LLCRothsay, MN7.4 GWh
#1148SpringviewSpringview, NE7.4 GWh
#1149Redwood Falls WindRedwood Falls, MN7.4 GWh
#1150Findlay Wind FarmFindlay, OH7.2 GWh
#1151Optimum Wind 3 LLCNevada, IA7.1 GWh
#1152Seward Wind FarmSeward, NE7.0 GWh
#1154RosemanAnita, IA6.9 GWh
#1155CCC Hastings Wind TurbineHastings, NE6.9 GWh
#1156Cape Cod Air Force Station - 6 SWSSagamore, MA6.9 GWh
#1157August Wind FarmClearfield, IA6.8 GWh
#1158Salka Cabazon WindNorth Palm Springs, CA6.7 GWh
#1159Loess HillsRock Port, MO6.6 GWh
#1160BirchClearfield, IA6.6 GWh
#1161Equity Industrial TurbinesGloucester, MA6.6 GWh
#1162WED Coventry 6Coventry, RI6.5 GWh
#1163Com Adam 1WF-1Sublette, IL6.5 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Valfilm Wind Project.

Plant NamePlant LocationAnnual GenerationDistance
Bowling Green Generating StationBowling Green, OH2.1 GWh21.6 mi
Bowling Green PeakingBowling Green, OH1.5 GWh21 mi
Bowling Green WindBowling Green, OH4.6 GWh20.9 mi
Buckeye Power Inc.Marion, OH3.9 GWh5 mi
DG AMP Solar Bowling GreenBowling Green, OH39.4 GWh21.8 mi
Energy Developments, HancockFindlay, OH21.4 GWh12.3 mi
Findlay Wind FarmFindlay, OH7.2 GWh1.2 mi
Fremont Energy CenterFremont, OH3.6 TWh32.2 mi
Hardin Solar Energy LLCAlger, OH285.7 GWh30.7 mi
Hog Creek Wind ProjectAda, OH198.1 GWh20.6 mi
Napoleon Solar INapoleon, OH9.4 GWh31.5 mi
Ohio Northern University Solar SiteAda, OH4.0 GWh24.6 mi
POET Biorefining - FostoriaFostoria, OH21.5 GWh15.1 mi
POET Biorefining - Leipsic, LLCLeipsic, OH13.0 GWh17.2 mi
Troy Energy LLCLuckey, OH821.7 GWh28.8 mi
Whirlpool Corporation - Ottawa Wind FarmOttawa, OH3.8 GWh21.1 mi
Woodville RTO BTMWoodville, OH75.0 MWh29.5 mi
Wyandot Solar FarmUpper Sandusky, OH11.4 GWh22.2 mi
Zephyr WindFindlay, OH10.1 GWh0.8 mi
Zephyr Wind Project - 2.0Findlay, OH10.4 GWh0.7 mi