Valencia 3
20 W. Harris Rd, Imperial, CA 92251Plant Summary Information
Valencia 3 is ranked #320 out of 799 solar farms in California in terms of total annual net electricity generation.
Valencia 3 generated 1.6 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Valencia 3 |
---|---|
Utility Name | Greenbacker Renewable Energy Corporation |
Location | Imperial County, CA |
Initial Operation Date | April 2021 |
Last Update | Dec 2023 |
Annual Generation | 8.3 GWh |
Annual Consumption | 29.4 k MMBtu |
Ranked #6,531 out of 11,852 Power Plants Nationwide | |
Ranked #1,997 out of 5,655 Solar Power Plants Nationwide | |
Ranked #900 out of 1,570 California Power Plants | |
Ranked #320 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of Valencia 3
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Valencia 3.
Monthly Net Generation for Valencia 3
Valencia 3 Details
Summary Information | |
---|---|
Plant Name | Valencia 3 (64441) |
Plant Address | 20 W. Harris Rd, Imperial, CA 92251 |
Utility | Greenbacker Renewable Energy Corporation (60025) |
Latitude, Longitude | 32.88567, -115.53765 |
Generation Dates on File | Apr 2021 to Dec 2023 |
Initial Operation Date | April 2021 |
Annual Generation | 8.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Imperial Irrigation District (IID) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Imperial Irrigation District (9216) CA |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator 266 Details Operating April 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 3 MW |
Summer Capacity | 3 MW |
Winter Capacity | 3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Tilt Angle | 52 |
DC Net Capacity | 4.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Valencia 3 Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1987 | Downs Farm Solar | Cofield, NC | 8.3 GWh |
#1988 | Southwick Solar PV | Southwick, MA | 8.3 GWh |
#1989 | Redman South Community Solar | Brockport, NY | 8.3 GWh |
#1990 | Andromeda Community Solar | Lester Prairie, MN | 8.3 GWh |
#1991 | Oakboro Farm | Laurinburg, NC | 8.3 GWh |
#1992 | Wendell Solar Farm LLC | Wendell, NC | 8.3 GWh |
#1993 | Cottage Grove CSG, LLC | Cottage Grove, MN | 8.3 GWh |
#1994 | Lenoir Farm | Kinston, NC | 8.3 GWh |
#1995 | Little Rock Pham Solar | Palmdale, CA | 8.3 GWh |
#1996 | 4Oaks | Four Oaks, NC | 8.3 GWh |
#1998 | Phillips Route 82 Solar LLC | East Fishkill, NY | 8.3 GWh |
#1999 | Hertford Solar Farm | Hertford, NC | 8.3 GWh |
#2000 | Syncarpha Blandford Hybrid CSG | Blandford, MA | 8.1 GWh |
#2001 | Cash Solar | Nashville, NC | 8.3 GWh |
#2002 | Crossett Solar | AR | 8.2 GWh |
#2003 | Koppelman Sun CSG | Eagle Lake, MN | 8.2 GWh |
#2004 | Felton CSG PV1-5 | Randolph, MN | 8.2 GWh |
#2005 | Troupsburg | Troupsburg, NY | 8.2 GWh |
#2006 | Ironwood Solar LLC | Blythe, CA | 8.2 GWh |
#2007 | Kilvert | Warwick, RI | 8.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Valencia 3.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Campo Verde Solar | El Centro, CA | 328.6 GWh | 14.3 mi |
Centinela Solar Energy | Calexico, CA | 491.6 GWh | 15.1 mi |
Centinela State Prison | Sacramento, CA | 18.1 GWh | 14.8 mi |
Community Solar 1 | Brawley, CA | 13.3 GWh | 7.4 mi |
Crown Cooling Facility | Brawley, CA | 537.0 MWh | 5.6 mi |
El Centro Hybrid | El Centro, CA | 1.1 TWh | 5.8 mi |
Heber Geothermal | Heber, CA | 250.1 GWh | 11.9 mi |
Heber Solar | Heber, CA | 25.5 GWh | 12 mi |
Imperial Valley Solar, LLC | Calexico, CA | 346.4 GWh | 15.1 mi |
IVC Solar | Imperial, CA | 3.7 GWh | 4.1 mi |
Mount Signal Solar Farm V | Calexico, CA | 610.3 GWh | 14.4 mi |
North Brawley Geothermal Plant | Brawley, CA | 28.2 GWh | 8.9 mi |
Rockwood | Brawley, CA | 3.9 GWh | 4.8 mi |
Second Imperial Geothermal | Heber, CA | 326.6 GWh | 11.8 mi |
SEPV Imperial Dixieland East | Imperial, CA | 5.3 GWh | 15.1 mi |
Sol Orchard El Centro PV | El Centro, CA | 46.2 GWh | 5.7 mi |
Solar Gen 2 Solar Facility | Calipatria, CA | 376.5 GWh | 14 mi |
Spreckels Sugar Company | Brawley, CA | 15.8 GWh | 2.5 mi |
Valencia 1 Solar CA | Westmorland, CA | 4.3 GWh | 12.1 mi |
Valencia 2 | Imperial, CA | 7.1 GWh | 9.4 mi |