Valencia 2
3575 Highway 111, Imperial, CA 92251Plant Summary Information
Valencia 2 is ranked #343 out of 799 solar farms in California in terms of total annual net electricity generation.
Valencia 2 generated 783.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Valencia 2 |
---|---|
Utility Name | Greenbacker Renewable Energy Corporation |
Location | Imperial County, CA |
Initial Operation Date | December 2020 |
Last Update | Dec 2023 |
Annual Generation | 7.1 GWh |
Annual Consumption | 25.2 k MMBtu |
Ranked #6,927 out of 11,835 Power Plants Nationwide | |
Ranked #2,281 out of 5,643 Solar Power Plants Nationwide | |
Ranked #958 out of 1,569 California Power Plants | |
Ranked #343 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of Valencia 2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Valencia 2.
Monthly Net Generation for Valencia 2
Valencia 2 Details
Summary Information | |
---|---|
Plant Name | Valencia 2 (64267) |
Plant Address | 3575 Highway 111, Imperial, CA 92251 |
Utility | Greenbacker Renewable Energy Corporation (60025) |
Latitude, Longitude | 33.0218, -115.52641 |
Generation Dates on File | Dec 2020 to Dec 2023 |
Initial Operation Date | December 2020 |
Annual Generation | 7.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 20-1081 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Imperial Irrigation District (IID) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Imperial Irrigation District (9216) CA |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator 265 Details Operating December 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 3 MW |
Summer Capacity | 3 MW |
Winter Capacity | 3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
DC Net Capacity | 4.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 2.7 MW |
Virtual Net Metering Agreement | No |
Valencia 2 Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2271 | Bellisario Solar 3 | Lapeer, NY | 7.1 GWh |
#2272 | Tinker (NC) | Moncure, NC | 7.1 GWh |
#2273 | Outback Solar At Christmas Valley | Christmas Valley, OR | 7.1 GWh |
#2274 | South Milford Solar Plant | Milford, UT | 7.1 GWh |
#2275 | Williamsville Hybrid CSG | Hubbardston, MA | 7.0 GWh |
#2276 | SR Kersey | Kersey, CO | 7.1 GWh |
#2277 | Raeford Farm | Raeford, NC | 7.1 GWh |
#2278 | Sherburne Community Solar | Clear Lake, MN | 7.1 GWh |
#2279 | Carol Jean Solar | Walnut Cove, NC | 7.1 GWh |
#2280 | Junction Road | Raritan Township, NJ | 7.1 GWh |
#2282 | Breckenridge Solar | Palmer, MA | 6.9 GWh |
#2283 | 0 Hammond St CSG | Carver, MA | 7.0 GWh |
#2284 | ASD Wallum MA Solar LLC(CSG) | Douglas, MA | 7.0 GWh |
#2285 | Church Road Solar LLC | Angier, NC | 7.1 GWh |
#2286 | Hwy 14 Holdco Solar CSG | Byron, MN | 7.1 GWh |
#2287 | Cottage Grove Project CSG | Cottage Grove, MN | 7.1 GWh |
#2288 | Bellisario Solar 2 | Lapeer, NY | 7.0 GWh |
#2289 | The Lawrenceville School Solar Facility | Lawrenceville, NJ | 7.0 GWh |
#2290 | Goose Pond Solar | Southwick, MA | 7.0 GWh |
#2291 | Swansboro Solar, LLC | Maysville, NC | 7.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Valencia 2.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Calipatria Solar Farm | Calipatria, CA | 41.2 GWh | 10 mi |
Calipatria State Prison | Calipatria, CA | 17.8 GWh | 10.1 mi |
CE Leathers | Calipatria, CA | 335.0 GWh | 11 mi |
CE Turbo LLC | Calipatria, CA | 54.8 GWh | 10.1 mi |
Community Solar 1 | Brawley, CA | 13.3 GWh | 3.7 mi |
Crown Cooling Facility | Brawley, CA | 537.0 MWh | 3.8 mi |
Del Ranch Company | Calipatria, CA | 311.2 GWh | 11.1 mi |
Midway Solar Farm 1 | Calipatria, CA | 123.1 GWh | 11 mi |
Midway Solar Farm II | Calipatria, CA | 66.6 GWh | 9.7 mi |
Midway Solar Farm III | Calipatria, CA | 48.9 GWh | 9.2 mi |
North Brawley Geothermal Plant | Brawley, CA | 28.2 GWh | 1.2 mi |
Rockwood | Brawley, CA | 3.9 GWh | 4.6 mi |
Salton Sea Power Gen Co - Unit 3 | Calipatria, CA | 336.5 GWh | 11.4 mi |
Salton Sea Power Gen Co - Unit 4 | Calipatria, CA | 319.7 GWh | 11.4 mi |
Salton Sea Power LLC - Unit 5 | Calipatria, CA | 302.8 GWh | 11.2 mi |
Solar Gen 2 Solar Facility | Calipatria, CA | 376.5 GWh | 5.2 mi |
Spreckels Sugar Company | Brawley, CA | 15.8 GWh | 8 mi |
Valencia 1 Solar CA | Westmorland, CA | 4.3 GWh | 6.1 mi |
Valencia 3 | Imperial, CA | 8.3 GWh | 9.4 mi |
Vulcan-BN Geothermal Power Company | Calipatria, CA | 259.4 GWh | 11.1 mi |