V H Braunig
15290 Streich Rd., Elmendorf, TX 78112Plant Summary Information
V H Braunig is ranked #57 out of 304 natural gas power plants in Texas in terms of total annual net electricity generation.
V H Braunig is comprised of 7 generators and generated 671.1 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | V H Braunig |
---|---|
Utility Name | City of San Antonio - (TX) |
Location | Bexar County, TX |
Initial Operation Date | March 1966 |
Last Update | Dec 2024 |
Annual Generation | 2.0 TWh |
Annual Consumption | 22.3 M MMBtu |
Ranked #520 out of 11,949 Power Plants Nationwide | |
Ranked #323 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #73 out of 769 Texas Power Plants | |
Ranked #57 out of 304 Texas Natural Gas Power Plants | |
Fuel Types | Natural Gas : 99.7% |
Map of V H Braunig
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for V H Braunig.
Monthly Net Generation for V H Braunig
V H Braunig Details
Summary Information | |
---|---|
Plant Name | V H Braunig (3612) |
Plant Address | 15290 Streich Rd., Elmendorf, TX 78112 |
Utility | City of San Antonio - (TX) (16604) |
Latitude, Longitude | 29.2567, -98.3825 |
Generation Dates on File | Jan 2001 to Dec 2024 |
Initial Operation Date | March 1966 |
Annual Generation | 2.0 TWh |
Fuel Types | Natural Gas : 99.7% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Braunig Lake |
Ash Impoundment | No |
Transmission / Distribution Owner | City of San Antonio - (TX) (16604) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | ENTERPRISE TEXAS PIPELINE |
Natural Gas Storage | No |
Generator 1 Details Operating March 1966
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | BRAUNIG_VHB1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | BRAUNIG_VHB1 |
Nameplate Capacity | 225 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 217 MW |
Winter Capacity | 217 MW |
Minimum Load | 60 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 1966 |
---|---|
Planned Retirement | March 2025 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 2 Details Operating April 1968
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | BRAUNIG_VHB2 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | BRAUNIG_VHB2 |
Nameplate Capacity | 252 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 230 MW |
Winter Capacity | 230 MW |
Minimum Load | 60 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 1968 |
---|---|
Planned Retirement | March 2025 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 3 Details Operating May 1970
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | BRAUNIG_VHB3 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | BRAUNIG_VHB3 |
Nameplate Capacity | 417 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 412 MW |
Winter Capacity | 412 MW |
Minimum Load | 70 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1970 |
---|---|
Planned Retirement | March 2025 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 5 Details Operating December 2010
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | BR_VHB6CT5_6 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | BR_VHB6CT5_6 |
Nameplate Capacity | 61 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 48 MW |
Winter Capacity | 48 MW |
Minimum Load | 20 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2010 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 48 MW |
Net Winter Capacity With Natural Gas | 48 MW |
Net Summer Capacity With Oil | 48 MW |
Net Winter Capacity With Oil | 48 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 6 Details Operating December 2010
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | BR_VHB6CT5_6 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | BR_VHB6CT5_6 |
Nameplate Capacity | 61 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 48 MW |
Winter Capacity | 48 MW |
Minimum Load | 20 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2010 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 48 MW |
Net Winter Capacity With Natural Gas | 48 MW |
Net Summer Capacity With Oil | 48 MW |
Net Winter Capacity With Oil | 48 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 7 Details Operating December 2010
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | BR_VHB6CT7_8 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | BR_VHB6CT7_8 |
Nameplate Capacity | 61 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 48 MW |
Winter Capacity | 48 MW |
Minimum Load | 20 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2010 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 48 MW |
Net Winter Capacity With Natural Gas | 48 MW |
Net Summer Capacity With Oil | 48 MW |
Net Winter Capacity With Oil | 48 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 8 Details Operating December 2010
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | BR_VHB6CT7_8 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | BR_VHB6CT7_8 |
Nameplate Capacity | 61 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 47 MW |
Winter Capacity | 47 MW |
Minimum Load | 20 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2010 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 47 MW |
Net Winter Capacity With Natural Gas | 47 MW |
Net Summer Capacity With Oil | 47 MW |
Net Winter Capacity With Oil | 47 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
V H Braunig Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#313 | Apache Station | Cochise, AZ | 2.3 TWh |
#314 | Northside Generating Station | Jacksonville, FL | 2.9 TWh |
#315 | Bayou Cogen Plant | Pasadena, TX | 2.3 TWh |
#316 | Dogwood Energy Facility | Pleasant Hill, MO | 2.1 TWh |
#317 | Hidalgo Energy Center | Edinburg, TX | 2.1 TWh |
#318 | McClain Energy Facility | Newcastle, OK | 2.1 TWh |
#319 | Coyote Springs | Boardman, OR | 2.0 TWh |
#320 | Hot Spring Generating Facility | Malvern, AR | 2.0 TWh |
#321 | Chesterfield | Chester, VA | 2.0 TWh |
#322 | Hopewell Cogeneration | Hopewell, VA | 2.0 TWh |
#324 | Apex Generating Station | Las Vegas, NV | 2.0 TWh |
#325 | Watson Cogeneration | Carson, CA | 2.4 TWh |
#326 | Moselle | Moselle, MS | 2.0 TWh |
#327 | RS Cogen | Lake Charles, LA | 2.0 TWh |
#328 | Jackson Generating Station | Jackson, MI | 2.0 TWh |
#329 | ANP Blackstone Energy Project | Blackstone, MA | 2.0 TWh |
#330 | Mint Farm Generating Station | Longview, WA | 2.0 TWh |
#331 | Louisiana 1 | Baton Rouge, LA | 2.6 TWh |
#332 | St Francis Energy Facility | Campbell, MO | 2.0 TWh |
#333 | O W Sommers | San Antonio, TX | 1.9 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding V H Braunig.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arthur Von Rosenberg | Elmendorf, TX | 3.0 TWh | 0.1 mi |
Blue Wing Solar Energy Generation | San Antonio, TX | 17.8 GWh | 3.5 mi |
CPS 1 Community Solar | Adkins, TX | 1.8 GWh | 10.8 mi |
FELPS 1 - Calaveras | Floresville, TX | 2.1 GWh | 8.3 mi |
FELPS 2 - Calaveras | Floresville, TX | 2.1 GWh | 8.3 mi |
FELPS 6- Floresville West | Floresville, TX | 2.2 GWh | 14.2 mi |
FELPS 7- Floresville West | Floresville, TX | 2.2 GWh | 14.3 mi |
HEB_CPSSADC | San Antonio, TX | 1.2 GWh | 11.2 mi |
IKEA Live Oak Rooftop PV System | Live Oak, TX | 2.1 GWh | 17.4 mi |
J K Spruce | San Antonio, TX | 6.1 TWh | 5.2 mi |
Leon Creek | San Antonio, TX | 223.2 GWh | 13.4 mi |
Nelson Gardens Landfill Gas to Energy | San Antonio, TX | 8.5 GWh | 17.5 mi |
O W Sommers | San Antonio, TX | 1.9 TWh | 5 mi |
OCI Alamo 2, LLC | Converse, TX | 9.5 GWh | 15 mi |
OCI Alamo 3 LLC | San Antonio, TX | 10.3 GWh | 16.2 mi |
OCI Alamo 4, LLC | Brackettville, TX | 78.9 GWh | 16.2 mi |
OCI Alamo Solar I Hybrid | San Antonio, TX | 88.3 GWh | 3.9 mi |
SunE CPS1 LLC | San Antonio, TX | 9.0 GWh | 2.3 mi |
SunE CPS2 LLC | San Antonio, TX | 9.7 GWh | 2.3 mi |
SunE CPS3 LLC | Somerset, TX | 10.3 GWh | 17.4 mi |