USPS PV
7001 S Central, Los Angeles, CA 90052Plant Summary Information
USPS PV is ranked #296 out of 799 solar farms in California in terms of total annual net electricity generation.
USPS PV generated 1.8 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | USPS PV |
---|---|
Utility Name | Altus Power America Management, LLC |
Location | Los Angeles County, CA |
Initial Operation Date | July 2017 |
Last Update | Dec 2023 |
Annual Generation | 10.8 GWh |
Annual Consumption | 38.7 k MMBtu |
Ranked #5,788 out of 11,852 Power Plants Nationwide | |
Ranked #1,461 out of 5,655 Solar Power Plants Nationwide | |
Ranked #830 out of 1,570 California Power Plants | |
Ranked #296 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
USPS LA Solar FiT A & B (2016 to 2022) Altus Power America Management, LLC (2023 to 2023) |
Map of USPS PV
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for USPS PV.
Monthly Net Generation for USPS PV
USPS PV Details
Summary Information | |
---|---|
Plant Name | USPS PV (61250) |
Plant Address | 7001 S Central, Los Angeles, CA 90052 |
Utility | Altus Power America Management, LLC (60281) |
Latitude, Longitude | 33.97792, -118.2587 |
Generation Dates on File | Jul 2017 to Dec 2023 |
Initial Operation Date | July 2017 |
Annual Generation | 10.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Los Angeles Department of Water & Power (11208) CA |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator USPS1 Details Operating July 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 7.4 MW |
Summer Capacity | 7.4 MW |
Winter Capacity | 7.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2017 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 225 |
Tilt Angle | 10 |
DC Net Capacity | 8.1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
USPS PV Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1451 | HL Solar | Wendel, CA | 10.9 GWh |
#1452 | Walnut Springs Solar | Walnut Springs, TX | 10.9 GWh |
#1453 | Kearsarge Smithfield LLC | Burrillville, RI | 10.9 GWh |
#1454 | Selwyn Farm | Lilesville, NC | 10.9 GWh |
#1455 | Overman Solar | Goldsboro, NC | 10.9 GWh |
#1456 | Winslow PV - BD Solar 2 LLC | Winslow, ME | 10.9 GWh |
#1457 | Buttercup Solar, LLC | Rose Hill, NC | 10.9 GWh |
#1458 | Oxford PV - BD Solar Oxford LLC | Oxford, ME | 10.9 GWh |
#1459 | IND Solar Farm (Phase IIA) | Indianapolis, IN | 10.8 GWh |
#1460 | RE Bruceville 1 LLC | Elk Grove, CA | 10.8 GWh |
#1462 | Imeson Solar | Jscksonville, FL | 10.8 GWh |
#1463 | Overhill Solar | Clinton, NC | 10.8 GWh |
#1464 | Albertson Solar LLC | Albertson, NC | 10.8 GWh |
#1465 | Saw Solar | China Grove, NC | 10.8 GWh |
#1466 | ANAD Solar Array | Anniston Army Depot, AL | 10.7 GWh |
#1467 | Gliden (Op Zone) | Tyner, NC | 10.7 GWh |
#1468 | Ryland Road Solar | Tyner, NC | 10.7 GWh |
#1469 | RE Bruceville 2 LLC | Elk Grove, CA | 10.7 GWh |
#1470 | Grissom Solar, LLC | Enfield, NC | 10.6 GWh |
#1471 | Riverside Renewable Energy LLC | Gloucester City, NJ | 10.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding USPS PV.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
AT&T - Gardena | Gardena, CA | 8.7 GWh | 7.3 mi |
AT&T - Hawthorne | Hawthorne, CA | 5.8 GWh | 5.1 mi |
Big Bear | Los Angeles, CA | 7.9 GWh | 4.6 mi |
Carson Cogeneration | Carson, CA | 34.8 GWh | 7.1 mi |
CBS Television City | Los Angeles, CA | 7.7 GWh | 8.9 mi |
Central Utilities Plant LAX 2 | Los Angeles, CA | 39.5 GWh | 8.7 mi |
Equinix Douglas St. Fuel Cell | El Segundo, CA | 8.1 GWh | 8.2 mi |
Equinix Maple Ave. Fuel Cell | El Segundo, CA | 7.8 GWh | 8.6 mi |
Forever 21 Retail, Inc. | Los Angeles, CA | 1.7 GWh | 7.4 mi |
Francisco St. Solar | Torrance, CA | 1.8 GWh | 9.4 mi |
H. Gonzales | Vernon, CA | 297.9 MWh | 2.5 mi |
Kaiser - LA | Los Angeles, CA | 33.1 GWh | 8.7 mi |
Kaiser Downey | Downey, CA | 5.3 GWh | 8.5 mi |
Lafayette 2 - Internal Services Dept | Los Angeles, CA | 2.7 GWh | 6.7 mi |
Lafayette 2 - MLK Jr. Hospital (MLK) | Los Angeles, CA | 2.4 GWh | 4.1 mi |
Malburg | Vernon, CA | 333.2 GWh | 2.5 mi |
Metro Support Services Center Solar | Los Angeles, CA | 479.0 MWh | 5.8 mi |
Ratkovich Alhambra | Alhambra, CA | 7.8 GWh | 9.4 mi |
Rio Hondo | South Gate, CA | 2.1 GWh | 9.3 mi |
Verizon-Torrance | Torrance, CA | 5.8 GWh | 9.2 mi |