US Magnesium
12819 N. Skull Valley Road, Rowley, UT 84029Plant Summary Information
US Magnesium is ranked #22 out of 23 natural gas power plants in Utah in terms of total annual net electricity generation.
US Magnesium is comprised of 3 generators and generated 3.9 MWh during the 3-month period between June 2024 to September 2024.
Plant Name | US Magnesium |
---|---|
Utility Name | US Magnesium |
Location | Tooele County, UT |
Initial Operation Date | January 1972 |
Last Update | Sep 2024 |
Annual Generation | 82.3 MWh |
Annual Consumption | 102.6 k MMBtu |
Ranked #11,467 out of 11,852 Power Plants Nationwide | |
Ranked #2,156 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #118 out of 121 Utah Power Plants | |
Ranked #22 out of 23 Utah Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of US Magnesium
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for US Magnesium.
Monthly Net Generation for US Magnesium
US Magnesium Details
Summary Information | |
---|---|
Plant Name | US Magnesium (58191) |
Plant Address | 12819 N. Skull Valley Road, Rowley, UT 84029 |
Utility | US Magnesium (58153) |
Latitude, Longitude | 40.91333, -112.73389 |
Generation Dates on File | Jan 2012 to Sep 2024 |
Initial Operation Date | January 1972 |
Annual Generation | 82.3 MWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | Yes |
FERC Cogeneration Docket Number | 97-75-001 |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | PacifiCorp - East (PACE) |
NAICS Code | Primary Metal Manufacturing (331) |
Sector | Industrial CHP (7) |
Water Source | Wells |
Ash Impoundment | No |
Transmission / Distribution Owner | PacifiCorp (14354) UT |
Grid Voltage | 13.80 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | QUESTAR GAS COMPANY |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator GT1 Details Operating January 1972
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 16 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 11 MW |
Winter Capacity | 13 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1972 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 11 MW |
Net Winter Capacity With Natural Gas | 13 MW |
Net Summer Capacity With Oil | 11 MW |
Net Winter Capacity With Oil | 12 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | No |
Generator GT2 Details OA January 1972
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 16 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 11 MW |
Winter Capacity | 13 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | OA |
First Operation Date | January 1972 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 11 MW |
Net Winter Capacity With Natural Gas | 13 MW |
Net Summer Capacity With Oil | 11 MW |
Net Winter Capacity With Oil | 12 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | No |
Generator GT3 Details Operating January 1972
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 16 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 11 MW |
Winter Capacity | 13 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1972 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 11 MW |
Net Winter Capacity With Natural Gas | 13 MW |
Net Summer Capacity With Oil | 11 MW |
Net Winter Capacity With Oil | 12 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | No |
US Magnesium Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2146 | HEB00776 | Katy, TX | 96.0 MWh |
#2147 | GenConn Devon LLC | Milford, CT | 2.3 GWh |
#2148 | WAL3226 | Katy, TX | 93.0 MWh |
#2149 | Regional Wastewater Control Facility | Stockton, CA | 4.1 GWh |
#2150 | L L Wilkins | Clarksdale, MS | 90.0 MWh |
#2151 | Meade | Meade, KS | 105.0 MWh |
#2152 | CCSU Co-Gen-STBY Gen | New Britain, CT | 88.2 MWh |
#2153 | Triton East and West Cogen | River Grove, IL | 87.0 MWh |
#2154 | University of Arizona - Biosphere 2 | Oracle, AZ | 118.0 MWh |
#2155 | Ampersand Chowchilla Biomass LLC | Chowchilla, CA | 49.1 GWh |
#2157 | Wells IC | Wells, MN | 128.0 MWh |
#2158 | Beloit Memorial Hospital Power Plant | Beloit, WI | 117.6 MWh |
#2159 | Sterling | Sterling, KS | 157.0 MWh |
#2160 | Minneapolis City of | Minneapolis, KS | 84.0 MWh |
#2161 | Des Moines Wastewater Reclamation Fac | Des Moines, IA | 72.5 MWh |
#2162 | Moline | Moline, IL | 21.5 GWh |
#2163 | Riley Generating Station | Zeeland, MI | 70.0 MWh |
#2164 | WAL1455 | Fort Worth, TX | 69.0 MWh |
#2165 | Alliant SBG 9802 Toyota | Cedar Rapids, IA | 66.6 MWh |
#2166 | Wichita Plant | Wichita, KS | 66.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding US Magnesium.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bountiful City | Bountiful, UT | 21.4 GWh | 44.4 mi |
Elektron Solar, LLC | Grantsville, UT | 89.7 GWh | 3.5 mi |
Gadsby | Salt Lake City, UT | 361.7 GWh | 43.2 mi |
Gateway | Mountain Green, UT | 15.9 GWh | 49.5 mi |
Hill AFB LFG Facility, Bldg #737 | Hill AFB, UT | 8.6 GWh | 42.8 mi |
Horseshoe Solar, LLC | Tooele, UT | 103.9 GWh | 13.9 mi |
HTW Plant 303 COGEN | Salt Lake City, UT | 45.7 GWh | 47.8 mi |
Kennecott Power Plant | Magna, UT | 129.1 GWh | 34.9 mi |
Murray Turbine | Murray, UT | 14.1 GWh | 47.2 mi |
Pine View Dam | Ogden, UT | 4.4 GWh | 51.8 mi |
Pioneer | Ogden, UT | 18.7 GWh | 46.9 mi |
Rocket Solar, LLC | Corinne, UT | 158.5 GWh | 52.2 mi |
Salt Lake Energy Systems | Salt Lake City, UT | 24.8 GWh | 38.4 mi |
Salt Palace Solar Gen Plant | Salt Lake City, UT | 2.0 GWh | 45 mi |
Tesoro SLC Cogeneration Plant | Salt Lake City, UT | 184.2 GWh | 44.2 mi |
Tooele Army Depot(CSG) | Tooele, UT | 2.8 GWh | 34.1 mi |
Trans-Jordan Generating Station | South Jordan, UT | 38.2 GWh | 43.2 mi |
Weber | South Weber, UT | 9.5 GWh | 46.9 mi |
Weber State University - Davis Campus PV | Layton, UT | 2.5 GWh | 41.2 mi |
West Valley Generation Project | West Valley City, UT | 940.9 GWh | 40.5 mi |