Urtica Solar Project

751 Manastash Road, Ellensburg, WA 98926

Plant Summary Information

Urtica Solar Project is ranked #8 out of 8 solar farms in Washington in terms of total annual net electricity generation.

Urtica Solar Project generated 112.0 MWh during the 3-month period between September 2022 to December 2022.

Plant NameUrtica Solar Project
Utility NameGreenbacker Renewable Energy Corporation
LocationKittitas County, WA
Initial Operation DateNovember 2022
Last Update Dec 2022
Annual Generation 112.0 MWh
Annual Consumption 382 MMBtu
Ranked #10,881 out of 11,249 Power Plants Nationwide
Ranked #5,109 out of 5,158 Solar Power Plants Nationwide
Ranked #131 out of 131 Washington Power Plants
Ranked #8 out of 8 Washington Solar Power Plants
Fuel Types Solar
Previous Operator TUUSSO Energy, LLC (2018 to 2020)
Greenbacker Renewable Energy Corporation (2021 to 2022)

Map of Urtica Solar Project

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Urtica Solar Project.

Create Your Account Today

Monthly Net Generation for Urtica Solar Project

Urtica Solar Project Details

Summary Information
Plant NameUrtica Solar Project (62067)
Plant Address751 Manastash Road Ellensburg, WA 98926
UtilityGreenbacker Renewable Energy Corporation (60025)
Latitude, Longitude47.10754, -120.68974
Generation Dates on FileNov 2022 to Dec 2022
Initial Operation DateNovember 2022
Annual Generation 112.0 MWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket Number17-344; 17-344-001; 17-344-002
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityPuget Sound Energy (PSEI)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerPuget Sound Energy Inc (15500) WA
Grid Voltage 12.00 kV
Energy StorageNo

Generator URTIC Details Operating November 2022

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity5 MW
Summer Capacity5 MW
Winter Capacity5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2022
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solar Details
Single Axis TrackingYes
Azimuth Angle180
DC Net Capacity6.7 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

Urtica Solar Project Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#5099Allie L.L.C.Renville, MN149.0 MWh
#5100Lanai Solar-Electric PlantLanai City, HI145.0 MWh
#5101Cattail (CSG)Fulton, IL130.0 MWh
#5102Laredo Bus Facility Solar CanopiesDecatur, GA128.5 MWh
#5103NSE Astoria - SkywardBoring, OR128.0 MWh
#5104La Joya Del SolFresno, CA127.1 MWh
#5105Merck Rahway Power PlantRahway, NJ46.2 GWh
#5106Ramona Solar EnergyRamona, CA122.5 MWh
#5107Amazon MDW6 Solar ProjectRomeoville, IL122.0 MWh
#5108Sikorsky Aircraft CHPStratford, CT77.0 GWh
#5110196 Tremont St(CSG)Carver, MA106.0 MWh
#5111Framingham State University PlantFramingham, MA127.0 MWh
#5112Sandy River Solar (CSG)Sandy, OR103.0 MWh
#5113Tooele Army Depot(CSG)Tooele, UT2.2 GWh
#5114Pivot Solar 2 LLC (CSG)Brush, CO99.0 MWh
#5115Crafton Hills College Solar FarmYucaipa, CA97.8 MWh
#5116Cosper Creek Solar (CSG)Willamina, OR94.0 MWh
#5117Laskin SolarHoyt Lakes, MN90.0 MWh
#5118Carnes Creek Solar (CSG)Salem, OR83.0 MWh
#5119Pivot Solar 14 LLC (CSG)Brush, CO79.0 MWh

Nearby Power Plants

Below are closest 20 power plants surrounding Urtica Solar Project.

Plant NamePlant LocationAnnual GenerationDistance
Camas Solar ProjectEllensburg, WA1.3 GWh13.3 mi
Cedar Falls (WA)North Bend, WA92.4 GWh55.6 mi
CowicheTieton, WA3.2 GWh28.8 mi
Crystal MountainGreenwater, WA158.0 MWh38.5 mi
Orchard Avenue 1Yakima, WA2.5 GWh35.3 mi
PackwoodPackwood, WA97.7 GWh54.6 mi
PEC HeadworksMoses Lake, WA18.4 GWh37.5 mi
Penstemon Solar ProjectEllensburg, WA8.4 GWh13.3 mi
Priest RapidsMattawa, WA4.0 TWh48.8 mi
Rock IslandWenatchee, WA2.1 TWh32.5 mi
Rocky ReachWenatchee, WA5.2 TWh34.8 mi
RozaYakima, WA57.5 GWh35.2 mi
Sagebrush Power PartnersEllensburg, WA280.3 GWh1.9 mi
Swauk Wind LLCThorp, WA9.1 GWh3.7 mi
Tieton Dam Hydro Electric ProjectRimrock, WA58.6 GWh37.3 mi
Twin Falls HydroNorth Bend, WA79.1 GWh52.3 mi
Vantage Wind Energy LLCEllensburg, WA268.4 GWh26.1 mi
WanapumBeverly, WA4.2 TWh37.6 mi
Weeks FallsNorth Bend, WA14.0 GWh50.3 mi
Wild HorseEllensburg, WA564.1 GWh23.3 mi