Upton County Solar
2361 Letter B Road, McCamey, TX 79752Plant Summary Information
Upton County Solar is ranked #53 out of 161 solar farms in Texas in terms of total annual net electricity generation.
Upton County Solar generated 113.8 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Upton County Solar |
---|---|
Utility Name | Consolidated Edison Development Inc. |
Location | Upton County, TX |
Initial Operation Date | December 2017 |
Last Update | Aug 2024 |
Annual Generation | 287.4 GWh |
Annual Consumption | 1.1 M MMBtu |
Ranked #1,878 out of 11,835 Power Plants Nationwide | |
Ranked #169 out of 5,643 Solar Power Plants Nationwide | |
Ranked #346 out of 749 Texas Power Plants | |
Ranked #53 out of 161 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of Upton County Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Upton County Solar.
Monthly Net Generation for Upton County Solar
Upton County Solar Details
Summary Information | |
---|---|
Plant Name | Upton County Solar (60581) |
Plant Address | 2361 Letter B Road, McCamey, TX 79752 |
Utility | Consolidated Edison Development Inc. (56769) |
Latitude, Longitude | 31.24181, -102.29027 |
Generation Dates on File | Dec 2017 to Aug 2024 |
Initial Operation Date | December 2017 |
Annual Generation | 287.4 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 18-75 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Lower Colorado River Authority (11269) |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator UCTX Details Operating December 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 150 MW |
Summer Capacity | 150 MW |
Winter Capacity | 150 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2017 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
DC Net Capacity | 213 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Upton County Solar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#159 | Victory Pass | Desert Center, CA | 296.2 GWh |
#160 | Hudson - High Desert Hybrid | Victorville, CA | 288.5 GWh |
#161 | Wistaria Ranch Solar | Calexico, CA | 295.2 GWh |
#162 | Concho Valley Solar, LLC | San Angelo, TX | 293.4 GWh |
#163 | Blythe Solar IV, LLC | Blythe, CA | 284.6 GWh |
#164 | Montague Solar | Arlington, OR | 292.3 GWh |
#165 | Springbok Solar Farm 1 | Cantil, CA | 291.6 GWh |
#166 | Ganado Solar | Gail, TX | 288.0 GWh |
#167 | Umbriel Solar | Livington, TX | 289.8 GWh |
#168 | Harry Allen Solar Energy LLC | Apex, NV | 287.9 GWh |
#170 | Elm Branch Solar 1 | Bardwell, TX | 287.2 GWh |
#171 | Arlington Energy Center III | Blythe, CA | 263.6 GWh |
#172 | Hardin Solar Energy LLC | Alger, OH | 285.7 GWh |
#173 | Tres Bahias | Port Lavaca, TX | 284.6 GWh |
#174 | East Blackland Solar Project 1 | Manor, TX | 283.4 GWh |
#175 | Colonial Trail West | Spring Grove, VA | 282.3 GWh |
#176 | BPL Files Solar | Itasca, TX | 282.2 GWh |
#177 | Valentine Solar, LLC | Rosamond, CA | 282.1 GWh |
#178 | Emerald Grove | Crane, TX | 281.6 GWh |
#179 | Mesquite Solar 2, LLC | Tonopah, AZ | 281.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Upton County Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alamo 6 | Fort Stockton, TX | 238.9 GWh | 17.2 mi |
Appaloosa Run Wind | Rankin, TX | 708.3 GWh | 27.7 mi |
Castle Gap Solar Hybrid | McCarney, TX | 385.9 GWh | 1.4 mi |
CED Crane Solar | Crane, TX | 405.5 GWh | 1.5 mi |
Desert Sky | Iraan, TX | 462.3 GWh | 25.4 mi |
East Pecos Solar | McCamey, TX | 259.2 GWh | 16.7 mi |
Emerald Grove | Crane, TX | 281.6 GWh | 11 mi |
Greasewood Solar | Fort Stockton, TX | 165.2 GWh | 18.7 mi |
High Lonesome Wind Power, LLC Hybrid | Rankin, TX | 1.3 TWh | 24.7 mi |
King Mountain Wind Ranch 1 | McCamey, TX | 561.3 GWh | 3.6 mi |
Midway Solar - TX | Fort Stockton, TX | 302.3 GWh | 17.5 mi |
NWP Indian Mesa Wind Farm | Iraan, TX | 197.8 GWh | 22.1 mi |
Oberon IA | Odessa, TX | 276.9 GWh | 40 mi |
Oberon IB | Odessa, TX | 56.3 GWh | 39.3 mi |
Pearl Solar | Fort Stockton, TX | 99.6 GWh | 17.6 mi |
RE Maplewood | McCamey, TX | 491.6 GWh | 18.4 mi |
Roadrunner, LLC Hybrid | McCamey, TX | 990.1 GWh | 6 mi |
Sherbino II | Ft. Stockton, TX | 533.6 GWh | 34.8 mi |
Woodward Mountain I | Girvin, TX | 175.7 GWh | 21.4 mi |
Woodward Mountain II | Girvin, TX | 168.8 GWh | 21.4 mi |