Upper Marlboro 1 CSG
7420 South Osborne Road, Upper Marlboro, MD 20772Plant Summary Information
Upper Marlboro 1 CSG is ranked #72 out of 140 solar farms in Maryland in terms of total annual net electricity generation.
Upper Marlboro 1 CSG generated 516.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Upper Marlboro 1 CSG |
---|---|
Utility Name | Nautilus Solar Solutions |
Location | Prince George's County, MD |
Initial Operation Date | December 2019 |
Last Update | Dec 2023 |
Annual Generation | 2.8 GWh |
Annual Consumption | 10.2 k MMBtu |
Ranked #9,162 out of 11,852 Power Plants Nationwide | |
Ranked #3,999 out of 5,655 Solar Power Plants Nationwide | |
Ranked #104 out of 179 Maryland Power Plants | |
Ranked #72 out of 140 Maryland Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Forefront Power, LLC (2019 to 2020) Nautilus Solar Solutions (2021 to 2023) |
Map of Upper Marlboro 1 CSG
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Upper Marlboro 1 CSG.
Monthly Net Generation for Upper Marlboro 1 CSG
Upper Marlboro 1 CSG Details
Summary Information | |
---|---|
Plant Name | Upper Marlboro 1 CSG (63075) |
Plant Address | 7420 South Osborne Road, Upper Marlboro, MD 20772 |
Utility | Nautilus Solar Solutions (61227) |
Latitude, Longitude | 38.78922, -76.80091 |
Generation Dates on File | Dec 2019 to Dec 2023 |
Initial Operation Date | December 2019 |
Annual Generation | 2.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | PECO Energy Co (14940) PA |
Grid Voltage | 21.00 kV |
Energy Storage | No |
Generator 20 Details Operating December 2019
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2019 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
Tilt Angle | 25 |
DC Net Capacity | 3 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | Yes |
Virtual Net Metering DC Capacity | 3 MW |
Upper Marlboro 1 CSG Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3989 | Charter Durabar at Woodstock | Woodstock, IL | 2.8 GWh |
#3990 | Bd of Educ of Queen Anne's Cnty, Cnty HS | Centreville, MD | 2.8 GWh |
#3991 | Stetson Road Solar - Barre I | Barre, MA | 2.8 GWh |
#3992 | Temple Solar Arrays | Reading, PA | 2.8 GWh |
#3993 | Chittenden County Solar Partners | South Burlington, VT | 2.8 GWh |
#3994 | Nickel 1 Solar Facility | Lost Hills, CA | 2.8 GWh |
#3995 | Atlantic City Convention Center | Atlantic City, NJ | 2.8 GWh |
#3996 | Lawrence Brook | Morristown, VT | 2.8 GWh |
#3997 | Carver MA 1 Community Solar | Carver, MA | 2.8 GWh |
#3998 | Greenville CSG | Port Jervis, NY | 2.8 GWh |
#4000 | Weston Landfill Solar | Weston, MA | 2.8 GWh |
#4001 | White Plains_RFP-Gedney Way Landfill | White Plains, NY | 2.8 GWh |
#4002 | San Diego - NCRC at Vista | Vista, CA | 2.8 GWh |
#4003 | Columbia Bryson | Grovetown, GA | 2.8 GWh |
#4004 | Panda Solar NC 7, LLC | Faison, NC | 2.8 GWh |
#4005 | Wakefern Food Corp | Keasbey, NJ | 2.8 GWh |
#4006 | Gifford CSG | Schenectady, NY | 2.8 GWh |
#4007 | Clif Bar Bakery of Twin Falls | Twin Falls, ID | 2.8 GWh |
#4008 | Washington St Community Solar Farm #3 | Ogden, NY | 2.8 GWh |
#4009 | Whistling Winds DPC Solar | New Lisbon, WI | 2.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Upper Marlboro 1 CSG.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bluefin Origination 1 | Brandywine, MD | 3.8 GWh | 4.2 mi |
Brandywine Power Facility | Brandywine, MD | 545.5 GWh | 9.1 mi |
Bulldog Solar One, LLC | Bowie, MD | 3.4 GWh | 10.3 mi |
City of Bowie | Mitchellville, MD | 3.8 GWh | 10 mi |
FedEx Field Solar Facility | Landover, MD | 3.5 GWh | 8.9 mi |
First Baptist Church of Glenarden | Upper Marlboro, MD | 2.8 GWh | 4.3 mi |
Holly Spring Meadows | District Heights, MD | 656.0 MWh | 7.8 mi |
Keys Energy Center | Brandywine, MD | 4.8 TWh | 6.6 mi |
Kirby Road Solar, LLC | Clinton, MD | 2.6 GWh | 6.7 mi |
MD - CS - BGE - PR24 TPE | Mitchellville, MD | 4.1 GWh | 11 mi |
MD - PR97 (CSG) | Bowie, MD | 4.4 GWh | 11.1 mi |
MNCPPC Randall Farm | Upper Marlboro, MD | 2.4 GWh | 2.9 mi |
OER Monarch CSG | Upper Marlboro, MD | 3.4 GWh | 0.9 mi |
OER Patuxent CSG | Lothian, MD | 4.2 GWh | 7.2 mi |
Ridgecrest | Washington, DC | 2.2 GWh | 10.2 mi |
Sheriff Road | Hyattsville, MD | 1.9 GWh | 9.8 mi |
Sol Phoenix | Capitol Heights, MD | 4.0 GWh | 9.1 mi |
Synergen Panorama, LLC CSG | Fort Washington, MD | 8.1 GWh | 9.4 mi |
WMATA - Naylor Rd. Metro | Temple Hills, MD | 29.0 MWh | 9.4 mi |
WMATA - S. Ave. Carport (East) (CSG) | Hillcrest Heights, MD | 956.0 MWh | 10 mi |