University Park North
787 Industrial Drive, University Park, IL 60484Plant Summary Information
University Park North is ranked #17 out of 72 natural gas power plants in Illinois in terms of total annual net electricity generation.
University Park North is comprised of 12 generators and generated 47.8 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | University Park North |
---|---|
Utility Name | LSP University Park LLC |
Location | Will County, IL |
Initial Operation Date | June 2002 |
Last Update | Dec 2023 |
Annual Generation | 208.2 GWh |
Annual Consumption | 2.5 M MMBtu |
Ranked #2,255 out of 11,835 Power Plants Nationwide | |
Ranked #734 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #81 out of 318 Illinois Power Plants | |
Ranked #17 out of 72 Illinois Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of University Park North
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for University Park North.
Monthly Net Generation for University Park North
University Park North Details
Summary Information | |
---|---|
Plant Name | University Park North (55640) |
Plant Address | 787 Industrial Drive, University Park, IL 60484 |
Utility | LSP University Park LLC (56928) |
Latitude, Longitude | 41.4425, -87.7514 |
Generation Dates on File | Jul 2002 to Dec 2023 |
Initial Operation Date | June 2002 |
Annual Generation | 208.2 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Commonwealth Edison Co (4110) IL |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | NARRAGANSETT ELECTRIC CO GAS DIV RI |
Pipeline Name | ANR PIPELINE COMPANY |
Natural Gas Storage | No |
Generator 1 Details Operating June 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 970 UP N13.5 KV UN-1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 970 UP N13.5 KV UN-1 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 45 MW |
Winter Capacity | 45 MW |
Minimum Load | 24 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2002 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 2 Details Operating June 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 970 UP N13.5 KV UN-2 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 970 UP N13.5 KV UN-2 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 45 MW |
Winter Capacity | 45 MW |
Minimum Load | 24 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2002 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 3 Details Operating June 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 970 UP N13.5 KV UN-3 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 970 UP N13.5 KV UN-3 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 45 MW |
Winter Capacity | 45 MW |
Minimum Load | 24 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2002 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 4 Details Operating June 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 970 UP N13.5 KV UN-4 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 970 UP N13.5 KV UN-4 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 45 MW |
Winter Capacity | 45 MW |
Minimum Load | 24 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2002 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 5 Details Operating June 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 970 UP N13.5 KV UN-5 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 970 UP N13.5 KV UN-5 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 45 MW |
Winter Capacity | 45 MW |
Minimum Load | 24 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2002 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 6 Details Operating June 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 970 UP N13.5 KV UN-6 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 970 UP N13.5 KV UN-6 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 45 MW |
Winter Capacity | 45 MW |
Minimum Load | 24 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2002 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 7 Details Operating June 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 970 UP N13.5 KV UN-7 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 970 UP N13.5 KV UN-7 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 45 MW |
Winter Capacity | 45 MW |
Minimum Load | 24 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2002 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 8 Details Operating June 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 970 UP N13.5 KV UN-8 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 970 UP N13.5 KV UN-8 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 45 MW |
Winter Capacity | 45 MW |
Minimum Load | 24 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2002 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 9 Details Operating June 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 970 UP N13.5 KV UN-9 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 970 UP N13.5 KV UN-9 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 45 MW |
Winter Capacity | 45 MW |
Minimum Load | 24 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2002 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 10 Details Operating July 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 970 UP N13.5 KV UN10 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 970 UP N13.5 KV UN10 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 45 MW |
Winter Capacity | 45 MW |
Minimum Load | 24 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2002 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 11 Details Operating July 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 970 UP N13.5 KV UN11 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 970 UP N13.5 KV UN11 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 45 MW |
Winter Capacity | 45 MW |
Minimum Load | 24 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2002 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 12 Details Operating July 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 970 UP N13.5 KV UN12 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 970 UP N13.5 KV UN12 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 45 MW |
Winter Capacity | 45 MW |
Minimum Load | 24 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2002 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
University Park North Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#724 | Tulsa | Tulsa, OK | 214.3 GWh |
#725 | Essential Power Rock Springs LLC | Rising Sun, MD | 213.7 GWh |
#726 | Cass County | Plattsmouth, NE | 210.4 GWh |
#727 | Saguaro Power | Henderson, NV | 210.4 GWh |
#728 | Perryman | Harford County, MD | 220.2 GWh |
#729 | Milford Power LP | Milford, MA | 210.3 GWh |
#730 | Silver Creek | Prentiss, MS | 210.2 GWh |
#731 | Exelon West Medway II LLC | Medway, MA | 210.2 GWh |
#732 | Mead Coated Board | Mahrt, AL | 758.7 GWh |
#733 | Tenaska Georgia Generation Facility | Franklin, GA | 214.0 GWh |
#735 | Texas Petrochemicals | Houston, TX | 236.3 GWh |
#736 | A.J. Mihm Generating Station | Pelkie, MI | 207.9 GWh |
#737 | Crossroads Energy Center | Clarksdale, MS | 207.9 GWh |
#738 | Hartwell Energy Facility | Hartwell, GA | 207.1 GWh |
#739 | Calvert City | Calvert City, KY | 206.7 GWh |
#740 | Agua Fria | Glendale, AZ | 197.1 GWh |
#741 | Mass Inst Tech Cntrl Utilities/Cogen Plt | Cambridge, MA | 204.5 GWh |
#742 | Groton Generation Station | Groton, SD | 201.9 GWh |
#743 | AES Alamitos LLC | Long Beach, CA | 201.8 GWh |
#744 | Edward L. Addison Generating Plant | Thomaston, GA | 200.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding University Park North.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
AES Griggs Solar, LLC | Grant Park, IL | 3.9 GWh | 17.9 mi |
Amazon MDW7 Solar Project | Monee, IL | 361.0 MWh | 1.7 mi |
Beecher Gas Recovery | Beecher, IL | 3.2 GWh | 7.3 mi |
CED Beecher Sun Solar | Beecher, IL | 3.5 GWh | 10.8 mi |
CID Gas Recovery | Calumet City, IL | 14.7 GWh | 17.4 mi |
Crete Energy Venture LLC | Crete, IL | 54.1 GWh | 6.9 mi |
Elwood Energy LLC | Elwood, IL | 187.2 GWh | 19.3 mi |
Exelon Solar Chicago | Chicago, IL | 11.1 GWh | 16.9 mi |
Griffith | Griffith, IN | 3.0 GWh | 17.2 mi |
IGS East Central, LLC | Joliet, IL | 3.3 GWh | 15.3 mi |
IGS Frankfort 2 CSG | Frankfort, IL | 3.4 GWh | 4.1 mi |
IKEA Joliet Rooftop PV System | Joliet, IL | 1.6 GWh | 16.7 mi |
Jackson Generation, LLC | Elwood, IL | 7.1 TWh | 18.6 mi |
Lincoln Generating Facility | Manhattan, IL | 12.3 GWh | 10.5 mi |
Lineage Logistics Solar | University Park, IL | 2.5 GWh | 0.9 mi |
Munster Landfill Gas-to-Energy | Munster, IN | 3.5 GWh | 13.8 mi |
Nostrand | Manteno Township, IL | 2.9 GWh | 16.9 mi |
University Park South | University Park, IL | 83.4 GWh | 0.1 mi |
Woodlawn CSG | Crete, IL | 4.3 GWh | 8.8 mi |
Woodlawn II (CSG) | Crete, IL | 3.7 GWh | 8.8 mi |