University of Alaska Fairbanks
802 Alumni drive, Fairbanks, AK 99775Plant Summary Information
University of Alaska Fairbanks is ranked #17 out of 130 power plants in Alaska in terms of total annual net electricity generation.
University of Alaska Fairbanks is comprised of 5 generators and generated 14.6 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | University of Alaska Fairbanks |
---|---|
Utility Name | University of Alaska |
Location | Fairbanks North Star Borough, AK |
Initial Operation Date | January 1964 |
Last Update | Aug 2024 |
Annual Generation | 68.9 GWh |
Annual Consumption | 1.8 M MMBtu |
Ranked #3,562 out of 11,835 Power Plants Nationwide | |
Ranked #115 out of 132 Subbituminous Coal Power Plants Nationwide | |
Ranked #17 out of 130 Alaska Power Plants | |
Ranked #3 out of 4 Alaska Subbituminous Coal Power Plants | |
Fuel Types | Subbituminous Coal : 97.3% Distillate Fuel Oil : 2.6% |
Map of University of Alaska Fairbanks
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for University of Alaska Fairbanks.
Monthly Net Generation for University of Alaska Fairbanks
University of Alaska Fairbanks Details
Summary Information | |
---|---|
Plant Name | University of Alaska Fairbanks (50711) |
Plant Address | 802 Alumni drive, Fairbanks, AK 99775 |
Utility | University of Alaska (19511) |
Latitude, Longitude | 64.85417, -147.82208 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | January 1964 |
Annual Generation | 68.9 GWh |
Fuel Types | Subbituminous Coal : 97.3% Distillate Fuel Oil : 2.6% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | |
Balancing Authority | () |
NAICS Code | Educational Services (611) |
Sector | Commercial CHP (5) |
Water Source | Municipality |
Ash Impoundment | No |
Transmission / Distribution Owner | Golden Valley Elec Assn Inc (7353) AK |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | FAIRBANKS NATURAL GAS |
Natural Gas Storage | No |
Generator GEN1 Details Out of Service January 1964
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.5 MW |
Winter Capacity | 1.4 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Out of Service |
First Operation Date | January 1964 |
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
---|---|
Energy Source | Subbituminous Coal / Distillate Fuel Oil / Jet Fuel |
Startup Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Stoker Technology | No |
Other Combustion Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN2 Details Out of Service January 1964
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.5 MW |
Winter Capacity | 1.4 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Out of Service |
First Operation Date | January 1964 |
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
---|---|
Energy Source | Subbituminous Coal / Distillate Fuel Oil / Jet Fuel |
Startup Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Stoker Technology | No |
Other Combustion Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN3 Details Out of Service April 1981
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 10 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 8.1 MW |
Winter Capacity | 10 MW |
Minimum Load | 2.5 MW |
Uprate/Derate Completed | No |
Status | Out of Service |
First Operation Date | April 1981 |
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
---|---|
Energy Source | Subbituminous Coal / Distillate Fuel Oil / Natural Gas / Jet Fuel |
Startup Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Fluidized Bed Technology | Yes |
Stoker Technology | No |
Other Combustion Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN4 Details Standby August 2000
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 9.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 9.6 MW |
Winter Capacity | 9.6 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
First Operation Date | August 2000 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN5 Details Operating February 2020
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 17 MW |
Nameplate Power Factor | 0.94 |
Summer Capacity | 17 MW |
Winter Capacity | 17 MW |
Minimum Load | 4 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 2020 |
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Subbituminous Coal / Distillate Fuel Oil / Natural Gas / Jet Fuel |
---|---|
Startup Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Fluidized Bed Technology | Yes |
Pulverized Coal Technology | No |
Stoker Technology | No |
Other Combustion Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | LIG / WDS / NG |
---|
University of Alaska Fairbanks Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Subbituminous Coal.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#105 | Platte | Grand Island, NE | 361.9 GWh |
#106 | Kyger Creek | Cheshire, OH | 4.6 TWh |
#107 | Archer Daniels Midland Columbus | Columbus, NE | 316.1 GWh |
#108 | Archer Daniels Midland Decatur | Decatur, IL | 654.1 GWh |
#109 | Genesis Alkali | Green River, WY | 264.4 GWh |
#110 | Apache Station | Cochise, AZ | 2.2 TWh |
#111 | Aurora Energy LLC Chena | Fairbanks, AK | 143.4 GWh |
#112 | American Crystal Sugar Hillsboro | Hillsboro, ND | 91.8 GWh |
#113 | Eielson AFB Central Heat & Power Plant | Eielson AFB, AK | 86.9 GWh |
#114 | Biron Mill | Wisconsin Rapids, WI | 185.5 GWh |
#116 | Utility Plants Section | Fort Wainwright, AK | 64.0 GWh |
#117 | Meramec | St. Louis, MO | 165.0 GWh |
#118 | Prairie Creek | Cedar Rapids, IA | 75.2 GWh |
#119 | American Crystal Sugar Crookston | Crookston, MN | 46.8 GWh |
#120 | American Crystal Sugar Drayton | Drayton, ND | 42.8 GWh |
#121 | American Crystal Sugar Moorhead | Moorhead, MN | 39.8 GWh |
#122 | Georgia-Pacific Muskogee | Muskogee, OK | 373.6 GWh |
#123 | American Crystal Sugar East Grand Forks | East Grand Forks, MN | 28.5 GWh |
#124 | Nippon Dynawave Packaging Longview WA | Longview, WA | 291.9 GWh |
#125 | Southern Minnesota Beet Sugar | Renville, MN | 26.9 GWh |
Nearby Power Plants
Below are closest 7 power plants surrounding University of Alaska Fairbanks.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aurora Energy LLC Chena | Fairbanks, AK | 143.4 GWh | 2.6 mi |
Eielson AFB Central Heat & Power Plant | Eielson AFB, AK | 86.9 GWh | 25.3 mi |
Eva Creek Wind | Healy, AK | 31.1 GWh | 63.7 mi |
Fairbanks | Fairbanks, AK | 6.3 GWh | 3 mi |
Healy | Healy, AK | 381.8 GWh | 76.9 mi |
North Pole | North Pole, AK | 483.0 GWh | 16.2 mi |
Utility Plants Section | Fort Wainwright, AK | 64.0 GWh | 5.5 mi |