Univ of Massachusetts Medical Center
55 Lake Ave. North, Worcester, MA 1655Plant Summary Information
Univ of Massachusetts Medical Center is ranked #26 out of 598 power plants in Massachusetts in terms of total annual net electricity generation.
Univ of Massachusetts Medical Center is comprised of 4 generators and generated 17.6 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Univ of Massachusetts Medical Center |
---|---|
Utility Name | University of Massachusetts Medical |
Location | Worcester County, MA |
Initial Operation Date | April 1974 |
Last Update | Dec 2023 |
Annual Generation | 68.1 GWh |
Annual Consumption | 1.7 M MMBtu |
Ranked #3,583 out of 11,852 Power Plants Nationwide | |
Ranked #1,011 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #26 out of 598 Massachusetts Power Plants | |
Ranked #17 out of 44 Massachusetts Natural Gas Power Plants | |
Fuel Types | Natural Gas : 97.4% Residual Fuel Oil : 2.4% |
Map of Univ of Massachusetts Medical Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Univ of Massachusetts Medical Center.
Monthly Net Generation for Univ of Massachusetts Medical Center
Univ of Massachusetts Medical Center Details
Summary Information | |
---|---|
Plant Name | Univ of Massachusetts Medical Center (50087) |
Plant Address | 55 Lake Ave. North, Worcester, MA 1655 |
Utility | University of Massachusetts Medical (23955) |
Latitude, Longitude | 42.27902, -71.75977 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | April 1974 |
Annual Generation | 68.1 GWh |
Fuel Types | Natural Gas : 97.4% Residual Fuel Oil : 2.4% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | Yes |
FERC Cogeneration Docket Number | 81-14-000 |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Educational Services (611) |
Sector | Commercial CHP (5) |
Water Source | Municipality |
Ash Impoundment | No |
Transmission / Distribution Owner | Massachusetts Electric Co (11804) MA |
Grid Voltage | 13.80 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | NSTAR GAS COMPANY |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator GEN1 Details Operating April 1974
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 2.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 1974 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | B |
Energy Source | Natural Gas / Residual Fuel Oil |
Startup Source | Natural Gas / Residual Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 1.5 MW |
Net Winter Capacity With Natural Gas | 1.5 MW |
Net Summer Capacity With Oil | 1.5 MW |
Net Winter Capacity With Oil | 1.5 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GEN2 Details Operating April 1974
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 2.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 1974 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | B |
Energy Source | Natural Gas / Residual Fuel Oil |
Startup Source | Natural Gas / Residual Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 1.5 MW |
Net Winter Capacity With Natural Gas | 1.5 MW |
Net Summer Capacity With Oil | 1.5 MW |
Net Winter Capacity With Oil | 1.5 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GEN3 Details Operating June 2002
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 3 MW |
Winter Capacity | 3 MW |
Minimum Load | 1.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2002 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | B |
Energy Source | Natural Gas / Residual Fuel Oil |
Startup Source | Natural Gas / Residual Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 3 MW |
Net Winter Capacity With Natural Gas | 1.5 MW |
Net Summer Capacity With Oil | 3 MW |
Net Winter Capacity With Oil | 1.5 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GEN4 Details Operating February 2013
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 7.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 6 MW |
Winter Capacity | 7.5 MW |
Minimum Load | 4.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 2013 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 6 MW |
Net Winter Capacity With Natural Gas | 6 MW |
Net Summer Capacity With Oil | 6 MW |
Net Winter Capacity With Oil | 6 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Univ of Massachusetts Medical Center Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1001 | Greenville Electric Generating Station | Greenville, OH | 68.5 GWh |
#1002 | Beaver Dam | Canton Township, PA | 68.1 GWh |
#1003 | Hopewell Mill | Hopewell, VA | 285.1 GWh |
#1004 | La Luz Energy Center | Belen, NM | 67.7 GWh |
#1005 | International Paper Vicksburg Mill | Vicksburg, MS | 205.1 GWh |
#1006 | Coalinga 25D Cogen | Coalinga, CA | 67.0 GWh |
#1007 | Lee Energy Facility | Dixon, IL | 67.0 GWh |
#1008 | River Valley | Panama, OK | 536.6 GWh |
#1009 | Harrington | Amarillo, TX | 2.3 TWh |
#1010 | Packaging Corp of America | Counce, TN | 410.8 GWh |
#1012 | Wolf Run Energy | Wilmot Township, PA | 66.1 GWh |
#1013 | Georgia-Pacific Wauna Mill | Clatskanie, OR | 186.3 GWh |
#1014 | Packaging Corp. of America Jackson Mill | Jackson, AL | 158.4 GWh |
#1015 | The Andersons Albion Ethanol LLC | Albion, MI | 65.7 GWh |
#1016 | Cumberland (NJ) | Millville, NJ | 65.6 GWh |
#1017 | 491 E 48th Street | Holland, MI | 65.3 GWh |
#1018 | International Paper Pensacola | Cantonment, FL | 336.2 GWh |
#1019 | Sikorsky Aircraft CHP | Stratford, CT | 64.3 GWh |
#1020 | Boulder Park | Spokane, WA | 63.9 GWh |
#1021 | CityCenter Central Plant Cogen Units | Las Vegas, NV | 63.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Univ of Massachusetts Medical Center.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
3Colton | Millbury, MA | 1.6 GWh | 5.1 mi |
BlueWave Capital - Grafton (SREC II) | Grafton, MA | 1.9 GWh | 6.2 mi |
Centech Gas Generator | Shrewsbury, MA | 340.0 MWh | 3.9 mi |
Clark University | Worcester, MA | 8.6 GWh | 3.8 mi |
DG Tufts Knoll LLC CSG | North Grafton, MA | 2.8 GWh | 5.1 mi |
DG Tufts Science LLC CSG | North Grafton, MA | 1.5 GWh | 4.7 mi |
Grafton PV | Grafton, MA | 4.1 GWh | 6.2 mi |
Grafton Solar | Grafton, MA | 2.1 GWh | 6.9 mi |
Leicester One MA Solar LLC | Leicester, MA | 5.1 GWh | 7.2 mi |
Mass Midstate Solar 1 | Warren, MA | 7.3 GWh | 7.3 mi |
Norton Powerhouse 2 | Worcester, MA | 28.9 GWh | 2.6 mi |
SELCO Community Solar | Shrewsbury, MA | 4.9 GWh | 3.8 mi |
Shrewsbury Solar | Shrewsbury, MA | 4.1 GWh | 3.4 mi |
Stafford St 2 Community Solar | Lecister, MA | 3.1 GWh | 6.8 mi |
Stafford St Solar 1 CSG | Leicester, MA | 11.6 GWh | 6.8 mi |
Stafford St Solar 3 CSG | Leicester, MA | 1.7 GWh | 6.8 mi |
Syncarpha Leicester Hybrid CSG | Leicester, MA | 4.4 GWh | 6.8 mi |
West Boylston Community Shared Solar | West Boylston, MA | 2.2 GWh | 3.7 mi |
Wheelabrator Millbury Facility | Millbury, MA | 320.2 GWh | 4 mi |
Worcester Landfill | Worcester, MA | 8.8 GWh | 4.4 mi |