.608 County Highway 10, Morris, MN 56267Plant Summary Information
UMM Wind Turbine is ranked #92 out of 125 wind farms in Minnesota in terms of total annual net electricity generation.
UMM Wind Turbine generated 1.3 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | UMM Wind Turbine |
---|---|
Utility Name | University of Minnesota Morris Campus |
Location | Stevens County, MN |
Initial Operation Date | June 2011 |
Last Update | Dec 2022 |
Annual Generation | 4.5 GWh |
Annual Consumption | 20.2 k MMBtu |
Ranked #7,880 out of 11,835 Power Plants Nationwide | |
Ranked #1,228 out of 1,343 Wind Power Plants Nationwide | |
Ranked #303 out of 736 Minnesota Power Plants | |
Ranked #92 out of 125 Minnesota Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
University of Minnestoa Morris Campus (2013 to 2017) University of Minnesota Morris Campus (2018 to 2023) |
Map of UMM Wind Turbine
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for UMM Wind Turbine.
Monthly Net Generation for UMM Wind Turbine
UMM Wind Turbine Details
Summary Information | |
---|---|
Plant Name | UMM Wind Turbine (57732) |
Plant Address | .608 County Highway 10, Morris, MN 56267 |
Utility | University of Minnesota Morris Campus (57046) |
Latitude, Longitude | 45.5897, -95.87703 |
Generation Dates on File | Jun 2011 to Dec 2022 |
Initial Operation Date | June 2011 |
Annual Generation | 4.5 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Educational Services (611) |
Sector | Commercial Non-CHP (4) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Otter Tail Power Co (14232) MN |
Grid Voltage | 12.50 kV |
Energy Storage | No |
Generator UMM1 Details Operating June 2011
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 1.7 MW |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.9 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2011 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Turbines/Hydrokinetic Buoys | 1 |
Time From Cold Shutdown To Full Load | 10M |
Turbine Details | |
Number Of Turbines | 1 |
---|---|
Predominant Turbine Manufacturer | Vestas |
Predominant Turbine Model Number | V82-1.65 |
Design Wind Speed | 18 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 265 |
UMM Wind Turbine Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1218 | Florence Hills LLC | Lake Benton, MN | 4.8 GWh |
#1219 | WED Plainfield, LLC | Johnston, RI | 4.8 GWh |
#1220 | Greenfield Wind | Greenfield, IA | 4.7 GWh |
#1221 | Boeve Windfarm LLC | Woodstock, MN | 4.7 GWh |
#1222 | Valentine Wind, LLC | Valentine, NE | 4.7 GWh |
#1223 | East Winds Project | Palm Springs, CA | 4.7 GWh |
#1224 | NLMU Wind | New London, IA | 4.7 GWh |
#1225 | Bowling Green Wind | Bowling Green, OH | 4.6 GWh |
#1226 | WCROC Wind Farm | Morris, MN | 4.6 GWh |
#1227 | Westridge Windfarm LLC | Woodstock, MN | 4.5 GWh |
#1229 | Windwalkers LLC | Kensett, IA | 4.4 GWh |
#1230 | Greenback Energy | Pipestone, MN | 4.4 GWh |
#1231 | Iowa Distributed Wind Generation Project | Algona, IA | 4.3 GWh |
#1232 | City of Soledad Water Reclamation | Soledad, CA | 4.3 GWh |
#1233 | Coram Tehachapi | Tehachapi, CA | 4.3 GWh |
#1234 | Golden Acorn Casino | Campo, CA | 4.3 GWh |
#1235 | LE Wind Turbine 1 | Euclid, OH | 4.2 GWh |
#1236 | Stahl Wind Energy | Pipestone, MN | 4.2 GWh |
#1237 | Carstensen Wind | Pipestone, MN | 4.2 GWh |
#1238 | Foundation CDCR LAC | Lancaster, CA | 4.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding UMM Wind Turbine.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alexandria | Alexandria, MN | 34.0 MWh | 31.7 mi |
Aquila Community Solar | Glenwood, MN | 2.0 GWh | 26.3 mi |
Armstrong Solar | Glenwood, MN | 4.7 GWh | 25.4 mi |
Benson City of | Benson, MN | 69.0 MWh | 23.2 mi |
Camellia Solar, LLC | Glenwood, MN | 2.2 GWh | 25.6 mi |
Cassiopeia Community Solar | Glenwood, MN | 1.9 GWh | 26.8 mi |
Grant County Wind LLC | Woodstock, MN | 51.3 GWh | 14.8 mi |
Leven Garden Solar | Villard, MN | 1.8 GWh | 30.9 mi |
Libra Community Solar | Glenwood, MN | 1.9 GWh | 24.3 mi |
Lowry CSG2, LLC | Glenwood, MN | 2.3 GWh | 18.5 mi |
Malmedal Solar Garden | Starbuck, MN | 1.7 GWh | 17.9 mi |
Novel Stavem Solar LLC CSG | Glenwood, MN | 2.2 GWh | 23.6 mi |
PopeSun CSG, LLC | Starbuck, MN | 6.9 GWh | 17.4 mi |
SolarClub 03 | Starbuck, MN | 327.0 MWh | 17.1 mi |
Star Garden | Starbuck, MN | 1.7 GWh | 17.2 mi |
Stevens Community Medical Center | Morris, MN | 8.0 MWh | 1.4 mi |
Strandness Garden | Starbuck, MN | 1.7 GWh | 17.4 mi |
Swan Garden | Villard, MN | 2.3 GWh | 30.9 mi |
WCROC Wind Farm | Morris, MN | 4.6 GWh | 0 mi |
Wollan Garden Solar | Starbuck, MN | 1.5 GWh | 17 mi |