Uintah
Uintah Canyon Farm Creek Junct, Neola, UT 84053Plant Summary Information
Uintah is ranked #16 out of 28 hydroelectric power plants in Utah in terms of total annual net electricity generation.
Uintah is comprised of 2 generators and generated 1.5 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Uintah |
---|---|
Utility Name | Moon Lake Electric Assn Inc |
Location | Duchesne County, UT |
Initial Operation Date | July 1920 |
Last Update | Dec 2023 |
Annual Generation | 6.3 GWh |
Annual Consumption | 22.6 k MMBtu |
Ranked #7,184 out of 11,852 Power Plants Nationwide | |
Ranked #1,094 out of 1,371 Water Power Plants Nationwide | |
Ranked #88 out of 121 Utah Power Plants | |
Ranked #16 out of 28 Utah Water Power Plants | |
Fuel Types | Water |
Map of Uintah
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Uintah.
Monthly Net Generation for Uintah
Uintah Details
Summary Information | |
---|---|
Plant Name | Uintah (3704) |
Plant Address | Uintah Canyon Farm Creek Junct, Neola, UT 84053 |
Utility | Moon Lake Electric Assn Inc (12866) |
Latitude, Longitude | 40.53806, -110.06611 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | July 1920 |
Annual Generation | 6.3 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Western Area Power Administration - Rocky Mountain Region (WACM) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Uintah River |
Ash Impoundment | No |
Transmission / Distribution Owner | Moon Lake Electric Assn Inc (12866) UT |
Grid Voltage | 12.50 kV |
Energy Storage | No |
Generator 1 Details Operating July 1920
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 1920 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Combustion Technology | No |
Multiple Fuels | No |
Generator 2 Details Operating September 1940
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 1940 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Uintah Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1084 | Millville Hydro Station | Millville, WV | 6.6 GWh |
#1085 | Redlands Water & Power | Grand Junction, CO | 6.6 GWh |
#1086 | Tomahawk | Tomahawk, WI | 6.5 GWh |
#1087 | Stampede | Truckee, CA | 6.5 GWh |
#1088 | Hiilangaay Hydro | Hydaburg, AK | 6.4 GWh |
#1089 | Little Wood Hydro Project | Carey, ID | 6.4 GWh |
#1090 | Lower Village Water Power Project | Claremont, NH | 6.4 GWh |
#1091 | West Charleston | West Charleston, VT | 6.3 GWh |
#1092 | Site 980 65 | Madera, CA | 6.3 GWh |
#1093 | Swift Creek | Afton, WY | 6.3 GWh |
#1095 | Peters Drive Plant | Hood River, OR | 6.3 GWh |
#1096 | Arpin Dam | Radisson, WI | 6.3 GWh |
#1097 | International Paper Woronoco Mill | Woronoco, MA | 6.2 GWh |
#1098 | Saluda Dam | Greenville, SC | 6.2 GWh |
#1099 | Burney Creek | Burney, CA | 6.2 GWh |
#1100 | Mother Ann Lee | Harrodsburg, KY | 6.2 GWh |
#1101 | Fontana | Rialto, CA | 6.2 GWh |
#1102 | Texon Hydroelectric Project | Russell, MA | 6.1 GWh |
#1103 | Mottville | White Pigeon, MI | 6.1 GWh |
#1104 | Radford | Radford, VA | 6.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Uintah.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bartholomew | Springville, UT | 1.7 GWh | 79.7 mi |
Bonanza | Vernal, UT | 3.3 TWh | 51.7 mi |
Deer Creek (UT) | Heber, UT | 23.4 GWh | 77.4 mi |
Echo Dam | Echo, UT | 12.9 GWh | 77.4 mi |
Flaming Gorge | Dutch John, UT | 413.6 GWh | 42.6 mi |
General Chemical | Green River, WY | 219.6 GWh | 74.7 mi |
Genesis Alkali | Green River, WY | 264.4 GWh | 76 mi |
Graphite Solar I | Wellington, UT | 193.0 GWh | 76.4 mi |
Heber City | Heber City, UT | 22.3 GWh | 71.4 mi |
Jordanelle Dam Hydroelectric Project | Heber, UT | 50.0 GWh | 71.4 mi |
Lake Creek Dam | Heber City, UT | 3.1 GWh | 65.5 mi |
Mountain Wind Power II LLC | Fort Bridger, WY | 174.1 GWh | 56 mi |
Mountain Wind Power LLC | Fort Bridger, WY | 132.3 GWh | 56.2 mi |
Snake Creek | Midway, UT | 3.2 GWh | 75.4 mi |
Snowbird Power Plant | Snowbird, UT | 14.4 GWh | 83.4 mi |
Sunnyside Cogen Associates | Sunnyside, UT | 340.7 GWh | 70.6 mi |
Sweetwater Solar | Green River, WY | 180.5 GWh | 78 mi |
Taylor Draw Hydroelectric Facility | Rangely, CO | 34.0 MWh | 77.4 mi |
TransAlta Wyoming Wind | Evanston, WY | 264.6 GWh | 57.7 mi |
Wanship | Wanship, UT | 12.3 GWh | 72.3 mi |