UCONN Cogen Facility
240 Glenbrook Road, Storrs, CT 6269Plant Summary Information
UCONN Cogen Facility is ranked #17 out of 156 power plants in Connecticut in terms of total annual net electricity generation.
UCONN Cogen Facility is comprised of 4 generators and generated 34.6 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | UCONN Cogen Facility |
---|---|
Utility Name | University of Connecticut |
Location | Capitol Planning Region, CT |
Initial Operation Date | March 2006 |
Last Update | Sep 2024 |
Annual Generation | 122.8 GWh |
Annual Consumption | 1.6 M MMBtu |
Ranked #2,932 out of 11,852 Power Plants Nationwide | |
Ranked #849 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #17 out of 156 Connecticut Power Plants | |
Ranked #13 out of 55 Connecticut Natural Gas Power Plants | |
Fuel Types | Natural Gas : 99.7% |
Map of UCONN Cogen Facility
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for UCONN Cogen Facility.
Monthly Net Generation for UCONN Cogen Facility
UCONN Cogen Facility Details
Summary Information | |
---|---|
Plant Name | UCONN Cogen Facility (58159) |
Plant Address | 240 Glenbrook Road, Storrs, CT 6269 |
Utility | University of Connecticut (58130) |
Latitude, Longitude | 41.80917, -72.25417 |
Generation Dates on File | Jan 2012 to Sep 2024 |
Initial Operation Date | March 2006 |
Annual Generation | 122.8 GWh |
Fuel Types | Natural Gas : 99.7% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Educational Services (611) |
Sector | Commercial CHP (5) |
Water Source | UCONN Well Fields |
Ash Impoundment | No |
Transmission / Distribution Owner | Connecticut Light & Power Co (4176) CT |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | CONNECTICUT NAT GAS CORP |
Pipeline Name | Algonquin Gas Transmission Company |
Natural Gas Storage | No |
Generator CGT1 Details Operating March 2006
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | STG1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 6.9 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 6.4 MW |
Winter Capacity | 6.4 MW |
Minimum Load | 3.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2006 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 6.39 MW |
Net Winter Capacity With Natural Gas | 6.39 MW |
Net Summer Capacity With Oil | 6.39 MW |
Net Winter Capacity With Oil | 6.39 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator CGT2 Details Operating March 2006
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | STG1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 6.9 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 6.4 MW |
Winter Capacity | 6.4 MW |
Minimum Load | 3.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2006 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Planned Net Summer Capacity Uprate | 0.5 MW |
Planned Net Winter Capacity Uprate | 0.5 MW |
Planned Uprate | May 2024 |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 6.39 MW |
Net Winter Capacity With Natural Gas | 6.39 MW |
Net Summer Capacity With Oil | 6.39 MW |
Net Winter Capacity With Oil | 6.39 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator CGT3 Details Operating March 2006
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | STG1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 6.9 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 6.4 MW |
Winter Capacity | 6.4 MW |
Minimum Load | 3.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2006 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 6.39 MW |
Net Winter Capacity With Natural Gas | 6.39 MW |
Net Summer Capacity With Oil | 6.39 MW |
Net Winter Capacity With Oil | 6.39 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator STG1 Details Operating March 2006
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | STG1 |
Ownership | Single Owner |
Duct Burners | Yes |
Nameplate Capacity | 5 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 4.9 MW |
Winter Capacity | 4.9 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2006 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
UCONN Cogen Facility Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#839 | Escanaba Mill | Escanaba, MI | 408.7 GWh |
#840 | Springdale 1 & 2 | Springdale, PA | 128.2 GWh |
#841 | Hardin County Peaking Facility | Kountze, TX | 128.1 GWh |
#842 | Brush Generation Facility | Brush, CO | 127.8 GWh |
#843 | Darbytown | Richmond, VA | 143.5 GWh |
#844 | Gans | Gans, PA | 126.1 GWh |
#845 | Silas Ray | Brownsville, TX | 125.1 GWh |
#846 | PPS Power Plant No 1 | Paducah, KY | 124.8 GWh |
#847 | Rawhide | Wellington, CO | 1.3 TWh |
#848 | New Orleans Power | New Orleans, LA | 123.4 GWh |
#850 | Comanche (CO) | Pueblo, CO | 5.7 TWh |
#851 | Marshalltown | Marshalltown, IA | 122.1 GWh |
#852 | Central Utility Plant - Texas A&M | College Station, TX | 122.1 GWh |
#853 | Woodland Pulp, LLC | Baileyville, ME | 366.6 GWh |
#854 | Mid-Georgia Cogeneration Facility | Kathleen, GA | 121.4 GWh |
#855 | Purdue CHP | West Lafayette, IN | 121.0 GWh |
#856 | Vernon Boulevard | Long Island City, NY | 120.4 GWh |
#857 | Sumpter | Belleville, MI | 120.0 GWh |
#858 | Concord | Watertown, WI | 119.8 GWh |
#859 | Millcreek Power Generation | St. George, UT | 118.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding UCONN Cogen Facility.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Adams Solar | Lebanon, CT | 1.5 GWh | 11.7 mi |
Dickinson Solar (CT) | Hampton, CT | 3.0 GWh | 9.4 mi |
East Windsor Solar One | East Windsor, CT | 8.8 GWh | 14.7 mi |
Franklin Solar | Lebanon, CT | 1.5 GWh | 11.7 mi |
Generate Colchester Fuel Cells, LLC | Colchester, CT | 82.3 GWh | 15.4 mi |
Hamilton Solar | Lebanon, CT | 1.5 GWh | 11.6 mi |
Jefferson Solar | Lebanon, CT | 1.5 GWh | 11.6 mi |
Manchester Community College East | Manchester, CT | 1.4 GWh | 15.9 mi |
Manchester Community College North | Great Path, CT | 1.5 GWh | 16.2 mi |
McHenry Solar | Hampton, CT | 1.6 GWh | 9.4 mi |
Norcap North | East Windsor, CT | 3.4 GWh | 15.7 mi |
Norcap South | East Windsor, CT | 3.4 GWh | 15.8 mi |
Scotland Dam | Windham, CT | 9.6 GWh | 12.1 mi |
Somers Solar Center, LLC | Somers, CT | 7.9 GWh | 14.1 mi |
Southington Solar One | Southington, CT | 8.7 GWh | 14.7 mi |
Stafford MS Ground Mount Community Solar | Stafford, CT | 3.2 GWh | 11.1 mi |
Sydney Solar | Hampton, CT | 3.1 GWh | 9.5 mi |
Ticket Network South Windsor | South Windsor, CT | 1.6 GWh | 13.1 mi |
UDR Glastonbury Fuel Cell | Glastonbury, CT | 21.1 GWh | 15.9 mi |
Wilson Solar | Lebanon, CT | 1.5 GWh | 11.6 mi |