UC Merced Solar Hybrid
5200 Lake Rd, Merced, CA 92350Plant Summary Information
UC Merced Solar Hybrid is ranked #316 out of 799 solar farms in California in terms of total annual net electricity generation.
UC Merced Solar Hybrid generated 1.4 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | UC Merced Solar Hybrid |
---|---|
Utility Name | MN8 Energy LLC |
Location | Merced County, CA |
Initial Operation Date | December 2018 |
Last Update | Dec 2023 |
Annual Generation | 8.5 GWh |
Annual Consumption | 30.3 k MMBtu |
Ranked #6,454 out of 11,852 Power Plants Nationwide | |
Ranked #1,918 out of 5,655 Solar Power Plants Nationwide | |
Ranked #891 out of 1,570 California Power Plants | |
Ranked #316 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
Solar University, LLC (2018 to 2019) Goldman Sachs Renewable Power Group (2020 to 2020) Goldman Sachs Renewable Power LLC (2021 to 2021) MN8 Energy LLC (2022 to 2023) |
Map of UC Merced Solar Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for UC Merced Solar Hybrid.
Monthly Net Generation for UC Merced Solar Hybrid
UC Merced Solar Hybrid Details
Summary Information | |
---|---|
Plant Name | UC Merced Solar Hybrid (61995) |
Plant Address | 5200 Lake Rd, Merced, CA 92350 |
Utility | MN8 Energy LLC (61944) |
Latitude, Longitude | 37.36569, -120.43223 |
Generation Dates on File | Dec 2018 to Dec 2023 |
Initial Operation Date | December 2018 |
Annual Generation | 8.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 19-592 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
Grid Voltage | 15.00 kV / 12.47 kV / 0.48 kV |
Energy Storage | Yes |
Generator UCMBA Details Operating December 2018
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 0.5 MW |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.5 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 10M |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 0.9 |
---|---|
Maximum Charge Rate | 0.5 MW |
Maximum Discharge Rate | 0.5 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 0.5 |
Storage Enclosure Type | CS |
System Peak Shaving | Yes |
Excess Wind And Solar Generation | P |
Ac Coupled | Yes |
Direct Support Of Another Unit | Yes |
Direct Support Plant Id | 61995 |
Direct Support Gen Id | UCMPV |
Support T D Asset | No |
Generator UCMPV Details Operating December 2018
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 4.5 MW |
Summer Capacity | 4.3 MW |
Winter Capacity | 1.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 48 |
Tilt Angle | 10 |
DC Net Capacity | 5.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 4.3 MW |
Virtual Net Metering Agreement | No |
UC Merced Solar Hybrid Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1908 | Fuquay Farm | Middle Creek Township, NC | 8.6 GWh |
#1909 | Sherburne North Project CSG | St. Cloud, MN | 8.6 GWh |
#1910 | Mohea Solar Energy Center, LLC | Gaffney, SC | 8.6 GWh |
#1911 | Bizzell Church Solar 2 | Selma, NC | 8.5 GWh |
#1912 | Innovative Solar 63, LLC | Snow Hill, NC | 8.5 GWh |
#1913 | Stagecoach Solar | Henderson, NC | 8.5 GWh |
#1914 | Sun Farm VIII, LLC | Battleboro, NC | 8.5 GWh |
#1915 | Royal Solar | Godwin, NC | 8.5 GWh |
#1916 | Nesvold Watertown Solar | Watertown, MN | 8.5 GWh |
#1917 | GSSP Schneider LLC | Waite Park, MN | 8.5 GWh |
#1919 | Warren Solar Farm LLC | Newton Grove, NC | 8.5 GWh |
#1920 | Daniel Farm LLC | Mocksville, NC | 8.5 GWh |
#1921 | Hastings Solar | Hastings, MN | 8.5 GWh |
#1922 | Market Farm | Reidsville, NC | 8.5 GWh |
#1923 | Dartmouth | Dartmouth, MA | 8.5 GWh |
#1924 | Nitro Solar | Smitfield, NC | 8.5 GWh |
#1925 | OlivePV | New Carlisle, IN | 8.5 GWh |
#1926 | Dement Farm LLC | Henderson, NC | 8.5 GWh |
#1927 | West Creek Solar | Newark Valley, NY | 8.5 GWh |
#1928 | West Street Solar 1 LLC | Gardner, MA | 8.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding UC Merced Solar Hybrid.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
2097 Helton Solar Project | Merced, CA | 2.6 GWh | 4.2 mi |
Adera Solar | Chowchilla, CA | 27.4 GWh | 17.9 mi |
Ampersand Chowchilla Biomass LLC | Chowchilla, CA | 49.1 GWh | 20.6 mi |
Broadway 3 - UC Merced 1 | Merced, CA | 1.2 GWh | 0.1 mi |
Chowchilla II | Chowchilla, CA | 13.6 GWh | 20.5 mi |
DGS Valley State Prison | Chowchilla, CA | 4.0 GWh | 23.9 mi |
Diamond H Dairy Power | Chowchilla, CA | 10.9 GWh | 24.4 mi |
Don Pedro | La Grange, CA | 491.6 GWh | 22.8 mi |
El Nido Facility | El Nido, CA | 43.7 GWh | 12.8 mi |
Exchequer | Snelling, CA | 250.6 GWh | 17.6 mi |
Five H Farms Solar Array | Merced, CA | 2.3 GWh | 18.6 mi |
Henry Miller RD | Dos Palos, CA | 3.3 GWh | 24.2 mi |
La Grange | La Grange, CA | 8.2 GWh | 21 mi |
McSwain | Snelling, CA | 45.9 GWh | 12.7 mi |
Merced Falls | Snelling, CA | 12.5 GWh | 12.2 mi |
Merced Solar LLC | Merced, CA | 4.1 GWh | 7.3 mi |
Mission Solar LLC | Merced, CA | 4.1 GWh | 7.3 mi |
Parker | Snelling, CA | 4.0 GWh | 7.8 mi |
Turlock Lake | Hickman, CA | 5.7 GWh | 19.2 mi |
Upper Dawson | La Grange, CA | 11.5 GWh | 19.8 mi |