U S Alliance Coosa Pines
17589 Plant Rd, Coosa Pines, AL 35044Plant Summary Information
U S Alliance Coosa Pines is ranked #9 out of 11 black liquor power plants in Alabama in terms of total annual net electricity generation.
U S Alliance Coosa Pines is comprised of 1 generator and generated 36.0 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | U S Alliance Coosa Pines |
---|---|
Utility Name | Bowater Newport Coosa Pines Op |
Location | Talladega County, AL |
Initial Operation Date | January 1968 |
Last Update | Dec 2023 |
Annual Generation | 139.3 GWh |
Annual Consumption | 10.2 M MMBtu |
Ranked #2,760 out of 11,835 Power Plants Nationwide | |
Ranked #64 out of 85 Black Liquor Power Plants Nationwide | |
Ranked #55 out of 75 Alabama Power Plants | |
Ranked #9 out of 11 Alabama Black Liquor Power Plants | |
Fuel Types | Black Liquor : 71.3% Natural Gas : 28.7% |
Map of U S Alliance Coosa Pines
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for U S Alliance Coosa Pines.
Monthly Net Generation for U S Alliance Coosa Pines
U S Alliance Coosa Pines Details
Summary Information | |
---|---|
Plant Name | U S Alliance Coosa Pines (54216) |
Plant Address | 17589 Plant Rd, Coosa Pines, AL 35044 |
Utility | Bowater Newport Coosa Pines Op (2053) |
Latitude, Longitude | 33.32811, -86.35683 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | January 1968 |
Annual Generation | 139.3 GWh |
Fuel Types | Black Liquor : 71.3% Natural Gas : 28.7% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Southern Company Services, Inc. - Trans (SOCO) |
NAICS Code | Paper Manufacturing (322) |
Sector | Industrial CHP (7) |
Water Source | Coosa River |
Ash Impoundment | Yes Not Lined Out of Service |
Transmission / Distribution Owner | Alabama Power Co (195) AL |
Grid Voltage | 110.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | SOUTHERN NATURAL GAS COMPANY |
Natural Gas Storage | No |
Generator GEN7 Details Operating November 2007
Technology | Wood/Wood Waste Biomass |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 25.9 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 24.9 MW |
Winter Capacity | 24.9 MW |
Minimum Load | 4 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2007 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
---|---|
Topping Or Bottoming | T |
Energy Source | Black Liquor / Natural Gas |
Startup Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Pulverized Coal Technology | No |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
U S Alliance Coosa Pines Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Black Liquor.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#54 | International Paper - Orange | Orange, TX | 238.6 GWh |
#55 | Inland Paperboard Packaging Rome | Rome, GA | 358.0 GWh |
#56 | Nippon Dynawave Packaging Longview WA | Longview, WA | 291.9 GWh |
#57 | Plant 31 Paper Mill | West Monroe, LA | 490.9 GWh |
#58 | Hopewell Mill | Hopewell, VA | 284.6 GWh |
#59 | KapStone Kraft Paper Corp | Roanoke Rapids, NC | 195.8 GWh |
#60 | Canton North Carolina | Canton, NC | 281.5 GWh |
#61 | International Paper Vicksburg Mill | Vicksburg, MS | 203.7 GWh |
#62 | WestRock (WA) | Tacoma, WA | 196.3 GWh |
#63 | Longview Fibre | Longview, WA | 170.9 GWh |
#65 | Georgia-Pacific Wauna Mill | Clatskanie, OR | 181.3 GWh |
#66 | Packaging Corp. of America Jackson Mill | Jackson, AL | 158.4 GWh |
#67 | International Paper Riverdale Mill | Selma, AL | 462.7 GWh |
#68 | Brunswick Cellulose | Brunswick, GA | 377.9 GWh |
#69 | Pixelle Specialty Solutions LLC - Chillicothe Facility | Chillicothe, OH | 205.6 GWh |
#70 | Johnsonburg Mill | Johnsonburg, PA | 137.2 GWh |
#71 | Georgia-Pacific Corp - Nekoosa Mill | Nekoosa, WI | 173.0 GWh |
#72 | Kaukauna Paper Mill | Kaukauna, WI | 122.8 GWh |
#73 | Clearwater Paper APP CB | Arkansas City, AR | 110.7 GWh |
#74 | IP Springfield Oregon | Springfield, OR | 91.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding U S Alliance Coosa Pines.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
ABC Coke | Tarrant, AL | 83.0 MWh | 30.1 mi |
AMEA Peaking | Sylacauga, AL | 46.3 GWh | 12 mi |
ANAD Solar Array | Anniston Army Depot, AL | 10.7 GWh | 30.4 mi |
Bankhead Dam | Northport, AL | 138.7 GWh | 58.4 mi |
Calhoun Energy Center | Eastaboga, AL | 270.0 GWh | 28.5 mi |
Central Alabama Generating Station | Billingsley, AL | 4.3 TWh | 51.9 mi |
E C Gaston | Wilsonville, AL | 3.9 TWh | 8.2 mi |
H Neely Henry Dam | Ohatchee, AL | 196.7 GWh | 36.1 mi |
Harris Dam | Lineville, AL | 128.9 GWh | 43.1 mi |
Hillabee Energy Center | Alexander City, AL | 4.5 TWh | 34.6 mi |
James H Miller Jr | Quinton, AL | 17.1 TWh | 45.6 mi |
Jordan Dam | Wetumpka, AL | 263.3 GWh | 49.4 mi |
Lay Dam | Clanton, AL | 454.7 GWh | 26.9 mi |
Lewis Smith Dam | Jasper, AL | 233.4 GWh | 60.5 mi |
Logan Martin Dam | Vincent, AL | 343.5 GWh | 6.8 mi |
Martin Dam | Dadeville, AL | 326.6 GWh | 51.7 mi |
Mitchell Dam | Verbena, AL | 409.4 GWh | 36.4 mi |
Tenaska Lindsay Hill Generating Station | Billingsley, AL | 1.5 TWh | 51.7 mi |
Walter Bouldin Dam | Wetumpka, AL | 514.5 GWh | 51.6 mi |
Yates Dam | Tallassee, AL | 118.8 GWh | 58.7 mi |