Tyler Bluff Wind Project, LLC
5858 County Road 424, Muenster, TX 76252Plant Summary Information
Tyler Bluff Wind Project, LLC is ranked #147 out of 221 wind farms in Texas in terms of total annual net electricity generation.
Tyler Bluff Wind Project, LLC generated 93.3 GWh during the 3-month period between October 2024 to January 2025.
Plant Name | Tyler Bluff Wind Project, LLC |
---|---|
Utility Name | Southern Power Co |
Location | Cooke County, TX |
Initial Operation Date | December 2016 |
Last Update | Jan 2025 |
Annual Generation | 372.7 GWh |
Annual Consumption | 1.4 M MMBtu |
Ranked #1,628 out of 11,979 Power Plants Nationwide | |
Ranked #480 out of 1,359 Wind Power Plants Nationwide | |
Ranked #316 out of 774 Texas Power Plants | |
Ranked #147 out of 221 Texas Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
Tyler Bluff Wind Project, LLC (2015 to 2015) Southern Power Co (2016 to 2023) |
Map of Tyler Bluff Wind Project, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Tyler Bluff Wind Project, LLC.
Monthly Net Generation for Tyler Bluff Wind Project, LLC
Tyler Bluff Wind Project, LLC Details
Summary Information | |
---|---|
Plant Name | Tyler Bluff Wind Project, LLC (60502) |
Plant Address | 5858 County Road 424, Muenster, TX 76252 |
Utility | Southern Power Co (17650) |
Latitude, Longitude | 33.70385, -97.37201 |
Generation Dates on File | Dec 2016 to Jan 2025 |
Initial Operation Date | December 2016 |
Annual Generation | 372.7 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG16-109-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Brazos Electric Power Coop Inc (2172) |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator GEN1 Details Operating December 2016
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 125.6 MW |
Summer Capacity | 125 MW |
Winter Capacity | 125 MW |
Minimum Load | 2.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2016 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 52 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 52 |
---|---|
Predominant Turbine Manufacturer | Siemens |
Predominant Turbine Model Number | SWT-2.3-108 |
Design Wind Speed | 17 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262.4 |
Tyler Bluff Wind Project, LLC Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Tyler Bluff Wind Project, LLC | 30 Ivan Allen Jr. Blvd, NW, Atlanta, GA 30308 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#470 | Leaning Juniper Wind Power II | Arlington, OR | 378.1 GWh |
#471 | Milford Wind Corridor I LLC | Milford, UT | 376.3 GWh |
#472 | Gratiot Farms Wind Project | Carson City, MI | 375.9 GWh |
#473 | Blue Summit II Wind, LLC | Vernon, TX | 375.8 GWh |
#474 | Wolf Ridge Wind | Muenster, TX | 375.6 GWh |
#475 | Victory Wind Farm | Westside, IA | 375.2 GWh |
#476 | Penascal Wind Power LLC | Sarita, TX | 374.9 GWh |
#477 | Crescent Wind Park | Hillsdale, MI | 374.7 GWh |
#478 | Bitter Ridge Wind Farm, LLC | Redkey, IN | 374.3 GWh |
#479 | Redbed Plains Wind Farm | Tuttle, OK | 372.8 GWh |
#481 | Tuscola Bay Wind | Reese, MI | 370.6 GWh |
#482 | Pocahontas Prairie Wind Farm | Pomeroy, IA | 370.6 GWh |
#483 | White Rock West Wind Project | Anadarko, OK | 368.1 GWh |
#484 | Breckinridge Wind Project LLC | Enid, OK | 364.9 GWh |
#485 | Rocky Ridge Wind Project | Hobart, OK | 364.4 GWh |
#486 | Camp Grove Wind Farm | Wyoming, IL | 363.5 GWh |
#487 | Roscoe Wind Farm LLC | Roscoe, TX | 362.3 GWh |
#488 | Alta Wind Energy Center I | Mojave, CA | 361.0 GWh |
#489 | Baldwin Wind LLC | Wilton, ND | 360.4 GWh |
#490 | Buckthorn Wind | Mingus, TX | 358.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Tyler Bluff Wind Project, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bridgeport Gas Processing Plant | Bridgeport, TX | 49.6 GWh | 43 mi |
BT Cooke Solar, LLC | Gainsville, TX | 112.4 GWh | 15.4 mi |
Connolly BESS | Decatur, TX | 13.5 GWh | 34.2 mi |
CoServ Community Solar Station | Aubrey, TX | 1.8 GWh | 37.5 mi |
Denison | Denison, TX | 112.9 GWh | 46.8 mi |
Denton Energy Center | Denton, TX | 247.0 GWh | 35.1 mi |
Highway 56 Solar | Sherman, TX | 5.0 GWh | 39.7 mi |
Marietta | Marietta, OK | 3.9 GWh | 22.4 mi |
Noble Solar | Krum, TX | 466.9 GWh | 31.5 mi |
North Gainesville Solar | Gainesville, TX | 9.7 GWh | 13.3 mi |
Porter Solar, LLC (TX) | Krum, TX | 113.6 GWh | 27.2 mi |
Rayburn Energy Station LLC | Sherman, TX | 3.7 TWh | 44.2 mi |
Spencer | Denton, TX | 46.6 GWh | 38.2 mi |
WAL3777 | Frisco, TX | 3.0 MWh | 45.9 mi |
WAL947 | Sherman, TX | 287.0 MWh | 43.7 mi |
West Moore Solar II | Sherman, TX | 5.3 GWh | 43.2 mi |
Whitesboro Solar | Whitesboro, TX | 10.2 GWh | 29.6 mi |
Whitesboro Solar II | Whitesboro, TX | 10.2 GWh | 29.5 mi |
Wildcat Creek Wind Farm LLC | Gainesville, TX | 547.0 GWh | 11 mi |
Wolf Ridge Wind | Muenster, TX | 375.6 GWh | 3.8 mi |