Twin Rivers Solar Power Plant
3600 SW 59th Place, Jasper, FL 32052Plant Summary Information
Twin Rivers Solar Power Plant is ranked #37 out of 165 solar farms in Florida in terms of total annual net electricity generation.
Twin Rivers Solar Power Plant generated 39.2 GWh during the 3-month period between December 2023 to March 2024.
Plant Name | Twin Rivers Solar Power Plant |
---|---|
Utility Name | Duke Energy Florida, LLC |
Location | Hamilton County, FL |
Initial Operation Date | March 2021 |
Last Update | Mar 2024 |
Annual Generation | 159.9 GWh |
Annual Consumption | 545.6 k MMBtu |
Ranked #2,589 out of 11,249 Power Plants Nationwide | |
Ranked #328 out of 5,158 Solar Power Plants Nationwide | |
Ranked #106 out of 272 Florida Power Plants | |
Ranked #37 out of 165 Florida Solar Power Plants | |
Fuel Types | Solar |
Map of Twin Rivers Solar Power Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Twin Rivers Solar Power Plant.
Monthly Net Generation for Twin Rivers Solar Power Plant
Twin Rivers Solar Power Plant Details
Summary Information | |
---|---|
Plant Name | Twin Rivers Solar Power Plant (63518) |
Plant Address | 3600 SW 59th Place Jasper, FL 32052 |
Utility | Duke Energy Florida, LLC (6455) |
Latitude, Longitude | 30.46643, -82.96872 |
Generation Dates on File | Mar 2021 to Mar 2024 |
Initial Operation Date | March 2021 |
Annual Generation | 159.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Florida Inc (FPC) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Duke Energy Florida, LLC (6455) FL |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator PV1 Details Operating March 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 74.9 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 74.9 MW |
Winter Capacity | 74.9 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2021 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Subcritical Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 104.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Twin Rivers Solar Power Plant Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#318 | Union Springs Solar Center | Lake Butler, FL | 162.5 GWh |
#319 | Barefoot Bay Solar Energy Center | Sebastian, FL | 162.2 GWh |
#320 | Bay Tree | Harrells, NC | 162.0 GWh |
#321 | Magnolia Springs Solar Center | Green Cove Springs, FL | 161.6 GWh |
#322 | Gutenberg Solar | Garysburg, NC | 161.5 GWh |
#323 | Hibiscus Solar Energy Center | Westlake, FL | 161.3 GWh |
#324 | Hammock Solar | Labelle, FL | 160.6 GWh |
#325 | SR Cedar Springs, LLC | Blakely, GA | 160.1 GWh |
#326 | Blue Cypress Solar Energy Center | Vero Beach, FL | 160.0 GWh |
#327 | Wilkinson Solar LLC | Pantego, NC | 159.9 GWh |
#329 | Chestnut Solar | Enfield, NC | 159.3 GWh |
#330 | Solar Star California, XLI, LLC | Rosamond, CA | 158.7 GWh |
#331 | Palmer Solar | Fountain, CO | 158.7 GWh |
#332 | Lakeside Solar Center | Okeechobee, FL | 158.5 GWh |
#333 | Edwards Sanborn E5 | Mojave, CA | 157.8 GWh |
#334 | NC 102 Project LLC | Midland, NC | 157.5 GWh |
#335 | Citrus Solar Energy Center Hybrid | Arcadia, FL | 157.0 GWh |
#336 | Babcock Solar Energy Center Hybrid | Punta Gorda, FL | 154.3 GWh |
#337 | Discovery Solar Center | Merrit Island, FL | 156.9 GWh |
#338 | Centerfield Cooper Solar, LLC | Chesterfield, SC | 156.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Twin Rivers Solar Power Plant.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Buckeye Florida LP | Perry, FL | 292.1 GWh | 43.1 mi |
Columbia Solar Power Plant | Fort White, FL | 151.3 GWh | 43.5 mi |
Echo River Solar | Live Oak, FL | 175.5 GWh | 13.3 mi |
Hamilton Solar Power Plant | Jasper, FL | 170.1 GWh | 13.1 mi |
Hildreth Solar Power Plant | O'Brien, FL | 170.6 GWh | 35.7 mi |
Lakeland Solar Energy LLC | Lakeland, GA | 3.1 GWh | 39.1 mi |
Lowndes IDA | Valdosta, GA | 3.3 GWh | 29.8 mi |
Lowndes Tycor Farms | Lake Park, GA | 4.8 GWh | 19.3 mi |
Moody Air Force Base Solar | Valdosta, GA | 99.9 GWh | 37.1 mi |
Northern Preserve Solar | Glen St. Mary, FL | 134.7 GWh | 46.7 mi |
PCA-Valdosta Mill | Valdosta, GA | 325.6 GWh | 25.4 mi |
Pecan Row Landfill To Electric Facility | Valdosta, GA | 33.6 GWh | 33.6 mi |
Perry Solar Facility | Perry, FL | 8.2 GWh | 42.7 mi |
Sunshine Gateway Solar Energy Center | Lake City, FL | 147.8 GWh | 17.8 mi |
Suwannee River | Live Oak, FL | 86.4 GWh | 14.1 mi |
Suwannee Solar Facility | Live Oak, FL | 18.4 GWh | 13.7 mi |
Swift Creek Chemical Complex | White Springs, FL | 98.0 GWh | 6.3 mi |
Valdosta | Valdosta, GA | 1.8 GWh | 28.2 mi |
Valdosta Prison | Valdosta, GA | 1.9 GWh | 35.8 mi |
Winquepin Renewable Energy Center | Lee, FL | 9.0 GWh | 23.4 mi |