Twin Bridges LFGTE
123 Twin Bridges Road, Danville, IN 46122Plant Summary Information
Twin Bridges LFGTE is ranked #9 out of 10 landfill gas power plants in Indiana in terms of total annual net electricity generation.
Twin Bridges LFGTE is comprised of 14 generators and generated 1.4 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Twin Bridges LFGTE |
---|---|
Utility Name | Wabash Valley Power Assn, Inc |
Location | Hendricks County, IN |
Initial Operation Date | October 1994 |
Last Update | Dec 2023 |
Annual Generation | 6.1 GWh |
Annual Consumption | 114.7 k MMBtu |
Ranked #7,229 out of 11,835 Power Plants Nationwide | |
Ranked #255 out of 299 Landfill Gas Power Plants Nationwide | |
Ranked #128 out of 198 Indiana Power Plants | |
Ranked #9 out of 10 Indiana Landfill Gas Power Plants | |
Fuel Types | Landfill Gas |
Map of Twin Bridges LFGTE
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Twin Bridges LFGTE.
Monthly Net Generation for Twin Bridges LFGTE
Twin Bridges LFGTE Details
Summary Information | |
---|---|
Plant Name | Twin Bridges LFGTE (54925) |
Plant Address | 123 Twin Bridges Road, Danville, IN 46122 |
Utility | Wabash Valley Power Assn, Inc (40211) |
Latitude, Longitude | 39.74498, -86.49466 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | October 1994 |
Annual Generation | 6.1 GWh |
Fuel Types | Landfill Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | RFC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Hendricks County Rural E M C (8447) IN |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | Tallgrass Interstate Gas Transmission |
Pipeline Notes | Pipeline to be connected late 2024. |
Generator I-1 Details Operating October 1994
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CIN.TWINBR1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CIN.TWINBR1 |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.4 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 1994 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator I-2 Details Operating October 1994
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CIN.TWINBR1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CIN.TWINBR1 |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.4 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 1994 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator I-3 Details Operating October 1994
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CIN.TWINBR1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CIN.TWINBR1 |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.4 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 1994 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator I-4 Details Operating October 1994
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CIN.TWINBR1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CIN.TWINBR1 |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.4 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 1994 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator II-1 Details Operating July 2002
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CIN.TWINBR1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CIN.TWINBR1 |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.4 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator II-2 Details Operating July 2002
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CIN.TWINBR1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CIN.TWINBR1 |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.4 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator II-3 Details Operating July 2002
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CIN.TWINBR1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CIN.TWINBR1 |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.4 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator II-4 Details Operating July 2002
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CIN.TWINBR1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CIN.TWINBR1 |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.4 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator III-1 Details Operating January 2009
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2009 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator III-2 Details Operating January 2009
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2009 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator III-3 Details Operating January 2009
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2009 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator III-4 Details Operating January 2009
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2009 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator IV-1 Details Operating June 2012
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2012 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator IV-2 Details Operating June 2012
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2012 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Twin Bridges LFGTE Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#245 | Waste Management Northern Oaks LFGTE | Harrison, MI | 8.0 GWh |
#246 | CII Methane Management IV, LLC | Smithfield, NC | 7.9 GWh |
#247 | Prairie Bluff | Houston, MS | 7.8 GWh |
#248 | Flathead Landfill to Gas Energy Facility | Kalispell, MT | 7.8 GWh |
#249 | White Street Renewables | Greensboro, NC | 14.1 GWh |
#250 | COC Surry LFG, LLC | Mount Airy, NC | 7.6 GWh |
#251 | Henrico | Glen Allen, VA | 7.3 GWh |
#252 | Sonoma Central Landfill Phase II | Petaluma, CA | 6.6 GWh |
#253 | Mas Durham Power, LLC | Durham, NC | 6.6 GWh |
#254 | Grand River | Grand Ledge, MI | 6.4 GWh |
#256 | Waste Mangement Redwood LFGTE | Novato, CA | 5.9 GWh |
#257 | Blackburn Landfill Co-Generation | Newton, NC | 5.6 GWh |
#258 | Roseburg LFG | Roseburg, OR | 5.5 GWh |
#259 | New Milford Gas Recovery | New Milford, CT | 5.4 GWh |
#260 | CII Methane Management III LFG Plant | Winterville, GA | 5.4 GWh |
#261 | Toyon Power Station | Los Angeles, CA | 4.9 GWh |
#262 | Morgantown | Morgantown, PA | 4.8 GWh |
#263 | Moretown | Waterbury, VT | 4.8 GWh |
#264 | Onalaska Campus Landfill Biogas | Onalaska, WI | 4.4 GWh |
#265 | Glasgow LFGTE | Glasgow, KY | 4.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Twin Bridges LFGTE.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Belmont | Indianapolis, IN | 5.1 GWh | 16.1 mi |
C&B Graham Energy, LLC | Danville, IN | 4.3 GWh | 5.5 mi |
CC Perry K | Indianapolis, IN | 11.9 GWh | 17.5 mi |
Duke Building 129 | Indianapolis, IN | 4.5 GWh | 17.5 mi |
Duke Building 87 | Indianapolis, IN | 3.4 GWh | 16.2 mi |
Duke Building 98 | Indianapolis, IN | 3.9 GWh | 16.6 mi |
Eagle Valley (IN) | Martinsville, IN | 5.3 TWh | 18.4 mi |
Georgetown | Indianapolis, IN | 239.4 GWh | 17.2 mi |
Harding Street | Indianapolis, IN | 3.5 TWh | 16 mi |
Hendricks Regional Health | Danville, IN | 26.0 MWh | 1.2 mi |
IND Community Solar Farm 1st Phase | Indianapolis, IN | 14.9 GWh | 10.1 mi |
IND Solar Farm (Phase IIA) | Indianapolis, IN | 10.8 GWh | 9.8 mi |
Indianapolis Motor Speedway Solar PV | Indianapolis, IN | 12.2 GWh | 14.2 mi |
Indy Grocers | Indianapolis, IN | 1.5 GWh | 13.7 mi |
INDY III | Indianapolis, IN | 3.2 GWh | 9.7 mi |
Indy Solar III, LLC | Indianapolis, IN | 13.6 GWh | 13.8 mi |
Marion Solar LNG | Indianapolis, IN | 2.3 GWh | 17.9 mi |
Maywood Photovoltaic Project | Indianapolis, IN | 9.6 GWh | 14.7 mi |
Rockville Solar I LLC | Indianapolis, IN | 3.7 GWh | 10.4 mi |
Rockville Solar II, LLC | Indianapolis, IN | 3.3 GWh | 10.5 mi |