Turquoise Nevada, LLC
21905 Reno Technology Parkway, Sparks, NV 89510Plant Summary Information
Turquoise Nevada, LLC is ranked #29 out of 60 solar farms in Nevada in terms of total annual net electricity generation.
Turquoise Nevada, LLC generated 29.7 GWh during the 3-month period between July 2024 to October 2024.
Plant Name | Turquoise Nevada, LLC |
---|---|
Utility Name | Greenbacker Renewable Energy Corporation |
Location | Washoe County, NV |
Initial Operation Date | December 2020 |
Last Update | Oct 2024 |
Annual Generation | 106.3 GWh |
Annual Consumption | 393.6 k MMBtu |
Ranked #3,132 out of 11,866 Power Plants Nationwide | |
Ranked #598 out of 5,672 Solar Power Plants Nationwide | |
Ranked #59 out of 109 Nevada Power Plants | |
Ranked #29 out of 60 Nevada Solar Power Plants | |
Fuel Types | Solar |
Map of Turquoise Nevada, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Turquoise Nevada, LLC.
Monthly Net Generation for Turquoise Nevada, LLC
Turquoise Nevada, LLC Details
Summary Information | |
---|---|
Plant Name | Turquoise Nevada, LLC (63906) |
Plant Address | 21905 Reno Technology Parkway, Sparks, NV 89510 |
Utility | Greenbacker Renewable Energy Corporation (60025) |
Latitude, Longitude | 39.57395, -119.5242 |
Generation Dates on File | Dec 2020 to Oct 2024 |
Initial Operation Date | December 2020 |
Annual Generation | 106.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | ER19-820; ER23-711-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Nevada Power Company (NEVP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Sierra Pacific Power Co (17166) NV |
Grid Voltage | 120.00 kV |
Energy Storage | No |
Generator 142 Details Operating December 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 60 MW |
Summer Capacity | 60 MW |
Winter Capacity | 60 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 61.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Turquoise Nevada, LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#588 | SR Turkey Creek, LLC | Lancaster, KY | 109.4 GWh |
#589 | Hawtree Solar | Warrenton, NC | 109.2 GWh |
#590 | Lick Creek Solar, LLC | Walnut Cove, NC | 108.2 GWh |
#591 | Franklin Solar Hybrid | Twin Falls, ID | 108.2 GWh |
#592 | Blue Harvest Solar Park | Continental, OH | 108.2 GWh |
#593 | Timber Road Solar Park | Payne, OH | 107.2 GWh |
#594 | Moffett Solar Project | Ridgeland, SC | 107.1 GWh |
#595 | Wildflower Solar, LLC (MS) | DeSoto, MS | 106.9 GWh |
#596 | Skysol | Merrill, OR | 106.6 GWh |
#597 | Caden Energix Axton LLC | Axton, VA | 106.3 GWh |
#599 | Elektron Solar, LLC | Grantsville, UT | 106.0 GWh |
#600 | Sugar Solar, LLC | Yadkinville, NC | 105.7 GWh |
#601 | Meherrin Solar | Skippers, VA | 105.4 GWh |
#602 | Pitts Dudik Solar | Hubbard, TX | 105.1 GWh |
#603 | Iris Solar LLC | Franklinton, LA | 104.8 GWh |
#604 | Riverside Solar | Ruskin, FL | 104.3 GWh |
#605 | Assembly Solar Project | Venice Township, MI | 104.1 GWh |
#606 | Bladen Solar | Fayetteville, NC | 104.1 GWh |
#607 | AP Sunray LLC | Knippa, TX | 104.1 GWh |
#608 | Salt City Solar Project - Hybrid | Circleville, OH | 104.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Turquoise Nevada, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Brady | Fallon, NV | 95.0 GWh | 31.4 mi |
Desert Peak Power Plant | Fernley, NV | 91.9 GWh | 32.8 mi |
Fleish | Fleish, NV | 20.8 GWh | 20.3 mi |
Galena 2 Geothermal Power Plant | Reno, NV | 38.1 GWh | 18.9 mi |
Galena 3 Geothermal Power Plant | Reno, NV | 92.1 GWh | 17.5 mi |
Lahontan | Fallon, NV | 8.4 GWh | 25.6 mi |
New Lahontan | Fallon, NV | 17.2 GWh | 25.6 mi |
Patua Acquisition Project, LLC | Hazen, NV | 137.1 GWh | 24 mi |
Richard Burdette Geothermal | Reno, NV | 110.1 GWh | 17.6 mi |
Stampede | Truckee, CA | 6.5 GWh | 31.7 mi |
Steamboat Hills LP | Reno, NV | 235.6 GWh | 19.1 mi |
Steamboat II | Reno, NV | 42.1 GWh | 17.1 mi |
Steamboat III | Reno, NV | 45.6 GWh | 17.2 mi |
Tesla Reno GigaFactory | Sparks, NV | 11.1 GWh | 5.1 mi |
Tracy | Sparks, NV | 4.0 TWh | 0.8 mi |
Turquoise Liberty Solar | Sparks, NV | 14.8 GWh | 1.1 mi |
Verdi | Verdi, NV | 19.0 GWh | 18.4 mi |
Washoe | Verdi, NV | 11.1 GWh | 18.9 mi |
Waste Management Lockwood LFGTE | Sparks, NV | 23.7 GWh | 7.6 mi |
Western 102 Power Plant | McCarran, NV | 472.6 GWh | 1.2 mi |