Turkey Track Wind Energy LLC
4310 A Hwy 153, Blackwell, TX 79537Plant Summary Information
Turkey Track Wind Energy LLC is ranked #151 out of 218 wind farms in Texas in terms of total annual net electricity generation.
Turkey Track Wind Energy LLC generated 86.2 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Turkey Track Wind Energy LLC |
---|---|
Utility Name | Invenergy Services LLC |
Location | Nolan County, TX |
Initial Operation Date | November 2008 |
Last Update | Dec 2023 |
Annual Generation | 345.7 GWh |
Annual Consumption | 1.3 M MMBtu |
Ranked #1,663 out of 11,835 Power Plants Nationwide | |
Ranked #492 out of 1,343 Wind Power Plants Nationwide | |
Ranked #318 out of 749 Texas Power Plants | |
Ranked #151 out of 218 Texas Wind Power Plants | |
Fuel Types | Wind |
Map of Turkey Track Wind Energy LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Turkey Track Wind Energy LLC.
Monthly Net Generation for Turkey Track Wind Energy LLC
Turkey Track Wind Energy LLC Details
Summary Information | |
---|---|
Plant Name | Turkey Track Wind Energy LLC (56774) |
Plant Address | 4310 A Hwy 153, Blackwell, TX 79537 |
Utility | Invenergy Services LLC (49893) |
Latitude, Longitude | 32.1981, -100.2686 |
Generation Dates on File | Jan 2009 to Dec 2023 |
Initial Operation Date | November 2008 |
Annual Generation | 345.7 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | AEP Texas North Company (20404) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator 1 Details Operating November 2008
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
RTO ISO LMP Node Designation | TTWEC_G1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | AEP Nicole 138kv switching station |
Nameplate Capacity | 169.5 MW |
Summer Capacity | 169.5 MW |
Winter Capacity | 169.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 2008 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 113 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 113 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 1.5 SLE |
Design Wind Speed | 17.4 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 263 |
Turkey Track Wind Energy LLC Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#482 | Hackberry Wind Farm | Albany, TX | 352.4 GWh |
#483 | Los Vientos Wind 1A | Sebastian, TX | 352.0 GWh |
#484 | Bitter Ridge Wind Farm, LLC | Redkey, IN | 351.9 GWh |
#485 | Morning Light Wind Farm | Adair, IA | 351.7 GWh |
#486 | High Lonesome Mesa LLC | Willard, NM | 350.1 GWh |
#487 | Barton Windpower LLC | Kensett, IA | 349.7 GWh |
#488 | Spinning Spur Wind LLC | Vegas, TX | 346.5 GWh |
#489 | Buffalo Ridge II LLC | Elkton, SD | 346.5 GWh |
#490 | Cameron Wind 1 LLC | Rio Hondo, TX | 346.0 GWh |
#491 | Milford Wind Corridor I LLC | Milford, UT | 346.0 GWh |
#493 | Majestic 1 Wind Farm | Panhandle, TX | 345.1 GWh |
#494 | Pine River Wind Park | Shepherd, MI | 344.3 GWh |
#495 | Minco Wind I, LLC | Minco, OK | 343.9 GWh |
#496 | Prairie Winds SD1 | Crow Lake, SD | 343.7 GWh |
#497 | Mehoopany Wind Energy LLC | Noxen, PA | 343.3 GWh |
#498 | Tule Wind LLC | Boulevard, CA | 342.5 GWh |
#499 | High Plains | Rock River, WY | 342.1 GWh |
#500 | Bent Tree Wind Farm Phase 1 | Hartland, MN | 341.6 GWh |
#501 | Canadian Hills Wind | El Rino, OK | 340.5 GWh |
#502 | Sac County Wind, LLC | Sac City, IA | 339.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Turkey Track Wind Energy LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Buffalo Gap 2 Wind Farm | Merkel, TX | 427.9 GWh | 9.9 mi |
Buffalo Gap 3 Wind Farm | Nolan, TX | 292.1 GWh | 11.6 mi |
Buffalo Gap Wind Farm | Merkel, TX | 198.5 GWh | 14.4 mi |
Callahan Divide Wind Energy Center | Tusocola, TX | 394.7 GWh | 16.2 mi |
Champion Wind Farm LLC | Roscoe, TX | 306.8 GWh | 26.1 mi |
Holstein 1 Solar Farm | Wingate, TX | 389.6 GWh | 9 mi |
Horse Hollow Wind Energy Center | Wingate, TX | 2.5 TWh | 12.4 mi |
Inadale Wind Farm LLC Hybrid | Roscoe, TX | 427.2 GWh | 27.5 mi |
Jameson Gas Processing Plant | Silver, TX | 12.9 GWh | 26.8 mi |
Loraine Windpark Project LLC | Loraine, TX | 329.5 GWh | 32.3 mi |
Maryneal Windpower | Maryneal, TX | 556.5 GWh | 13.1 mi |
Mesquite Star | Roscoe, TX | 1.2 TWh | 5 mi |
Roscoe Wind Farm LLC | Roscoe, TX | 404.7 GWh | 29.8 mi |
South Trent Wind Farm | Sweetwater, TX | 264.8 GWh | 16.7 mi |
Sweetwater Wind 1 LLC | Sweetwater, TX | 137.6 GWh | 12 mi |
Sweetwater Wind 2 LLC | Sweetwater, TX | 429.5 GWh | 11.9 mi |
Sweetwater Wind 3 LLC | Sweetwater, TX | 425.5 GWh | 11 mi |
Sweetwater Wind 4 LLC | Roscoe, TX | 609.9 GWh | 17.2 mi |
Sweetwater Wind 5 | Roscoe, TX | 165.2 GWh | 12.8 mi |
Trent Wind Farm | Trent, TX | 535.5 GWh | 16.1 mi |