Tuolumne Wind Project
S-14 and Hwy 97, Goldendale, WA 98620Plant Summary Information
Tuolumne Wind Project is ranked #12 out of 23 wind farms in Washington in terms of total annual net electricity generation.
Tuolumne Wind Project generated 46.9 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Tuolumne Wind Project |
---|---|
Utility Name | Turlock Irrigation District |
Location | Klickitat County, WA |
Initial Operation Date | May 2009 |
Last Update | Dec 2023 |
Annual Generation | 329.8 GWh |
Annual Consumption | 1.2 M MMBtu |
Ranked #1,742 out of 11,866 Power Plants Nationwide | |
Ranked #520 out of 1,345 Wind Power Plants Nationwide | |
Ranked #51 out of 134 Washington Power Plants | |
Ranked #12 out of 23 Washington Wind Power Plants | |
Fuel Types | Wind |
Map of Tuolumne Wind Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Tuolumne Wind Project.
Monthly Net Generation for Tuolumne Wind Project
Tuolumne Wind Project Details
Summary Information | |
---|---|
Plant Name | Tuolumne Wind Project (56702) |
Plant Address | S-14 and Hwy 97, Goldendale, WA 98620 |
Utility | Turlock Irrigation District (19281) |
Latitude, Longitude | 45.8797, -120.8072 |
Generation Dates on File | Jun 2009 to Dec 2023 |
Initial Operation Date | May 2009 |
Annual Generation | 329.8 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Bonneville Power Administration (BPAT) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Bonneville Power Administration (1738) WA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator WPT1 Details Operating May 2009
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
RTO ISO LMP Node Designation | TIDS-MALIN_5_N101-MALIN500 |
Nameplate Capacity | 136.3 MW |
Summer Capacity | 136.3 MW |
Winter Capacity | 136.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 2009 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Turbines/Hydrokinetic Buoys | 62 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 62 |
---|---|
Predominant Turbine Manufacturer | Siemens |
Predominant Turbine Model Number | SWT-2.3-93 |
Design Wind Speed | 16.5 MPH |
Wind Quality Class | 3 - Low Wind |
Turbine Hub Height Feet | 262.4 |
Tuolumne Wind Project Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#510 | Los Vientos V Wind Power | Rio Grande City, TX | 334.6 GWh |
#511 | Hoopeston Wind LLC | Rossville, IL | 334.1 GWh |
#512 | Stoneray Power Partners, LLC | Woodstock, MN | 333.8 GWh |
#513 | Rugby Wind Power Project | Barton, ND | 333.2 GWh |
#514 | Los Vientos Wind 1A | Sebastian, TX | 332.4 GWh |
#515 | Crossroads Wind Farm | Canton, OK | 331.6 GWh |
#516 | FPL Energy Vansycle LLC (WA) | Touchet, WA | 331.4 GWh |
#517 | Penascal Wind Power LLC | Sarita, TX | 331.3 GWh |
#518 | Tule Wind LLC | Boulevard, CA | 330.0 GWh |
#519 | Meadow Lake Wind Farm V LLC | Chalmers, IN | 329.9 GWh |
#521 | Loraine Windpark Project LLC | Loraine, TX | 329.5 GWh |
#522 | Vansycle II Wind Energy Center | Athena, OR | 329.2 GWh |
#523 | Prairie Winds ND1 | Minot, ND | 328.2 GWh |
#524 | Benton County Wind Farm | Earl Park, IN | 327.5 GWh |
#525 | Rio Bravo Windpower, LLC | Roma, TX | 326.8 GWh |
#526 | Shady Oaks Wind 2 | Compton, IL | 326.7 GWh |
#527 | Grand Meadow | Dexter, MN | 325.9 GWh |
#528 | Black Rock Wind | Elk Garden, WV | 323.8 GWh |
#529 | Baffin Wind | Sarita, TX | 323.5 GWh |
#530 | Oakfield Wind Project | City of Oakfield, ME | 323.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Tuolumne Wind Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Big Horn Wind II | Bickleton, WA | 110.2 GWh | 24.4 mi |
Big Horn Wind Project | Bickelton, WA | 485.3 GWh | 24.9 mi |
Biglow Canyon Wind Farm | Wasco, OR | 982.7 GWh | 18.4 mi |
Dalles Dam North Fishway Project | The Dalles, OR | 41.6 GWh | 24.3 mi |
Golden Hill Wind | Wasco, OR | 604.1 GWh | 22.4 mi |
Goldendale Generating Station | Goldendale, WA | 2.2 TWh | 4.9 mi |
Goodnoe Hills | Goldendale, WA | 223.9 GWh | 15.3 mi |
Harvest Wind Project | Roosevelt, WA | 216.8 GWh | 22.6 mi |
Hay Canyon Wind Power LLC | Wasco, OR | 175.4 GWh | 27.3 mi |
John Day | Rufus, OR | 6.9 TWh | 12.5 mi |
Klondike Wind Power | Wasco, OR | 30.9 GWh | 25.5 mi |
Klondike Windpower II | Wasco, OR | 229.2 GWh | 23.7 mi |
Klondike Windpower III | Wasco, OR | 715.5 GWh | 25.1 mi |
Linden Wind Energy Project | Goldendale, WA | 116.7 GWh | 9.4 mi |
Lund Hill Solar | Bickleton, WA | 353.3 GWh | 21.8 mi |
PaTu Wind Farm LLC | Wasco, OR | 25.5 GWh | 20.6 mi |
The Dalles | The Dalles, OR | 5.4 TWh | 24.2 mi |
White Creek Wind Farm | Roosevelt, WA | 446.8 GWh | 22.8 mi |
Windy Flats Wind Project | Centerville, WA | 567.8 GWh | 10.6 mi |
WyEast Solar | Wasco, OR | 19.6 GWh | 22.7 mi |