Tropico Solar PV Plant
23219 Avenue 24, Delano, CA 93215Plant Summary Information
Tropico Solar PV Plant is ranked #222 out of 799 solar farms in California in terms of total annual net electricity generation.
Tropico Solar PV Plant generated 5.7 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Tropico Solar PV Plant |
---|---|
Utility Name | Arevon Energy, Inc. |
Location | Tulare County, CA |
Initial Operation Date | September 2016 |
Last Update | Dec 2023 |
Annual Generation | 30.0 GWh |
Annual Consumption | 106.0 k MMBtu |
Ranked #4,557 out of 11,852 Power Plants Nationwide | |
Ranked #1,004 out of 5,655 Solar Power Plants Nationwide | |
Ranked #613 out of 1,570 California Power Plants | |
Ranked #222 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
W Power LLC (2014 to 2014) Tropico, LLC (2015 to 2019) CD Arevon USA, Inc. (2020 to 2021) Arevon Energy, Inc. (2022 to 2023) |
Map of Tropico Solar PV Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Tropico Solar PV Plant.
Monthly Net Generation for Tropico Solar PV Plant
Tropico Solar PV Plant Details
Summary Information | |
---|---|
Plant Name | Tropico Solar PV Plant (59599) |
Plant Address | 23219 Avenue 24, Delano, CA 93215 |
Utility | Arevon Energy, Inc. (61230) |
Latitude, Longitude | 35.83194, -119.05611 |
Generation Dates on File | Sep 2016 to Dec 2023 |
Initial Operation Date | September 2016 |
Annual Generation | 30.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 16-358 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 66.00 kV |
Energy Storage | No |
Generator GEN1 Details Operating September 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 14 MW |
Summer Capacity | 13 MW |
Winter Capacity | 11 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2016 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
DC Net Capacity | 18.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Tropico Solar PV Plant Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#994 | Hecate Energy Cherrydale LLC | Cape Charles, VA | 30.6 GWh |
#995 | Caden Energix Pamplin LLC | Appomattox, VA | 30.6 GWh |
#996 | Maryland Solar | Hagerstown, MD | 30.6 GWh |
#997 | Riverhead Solar Farm | Calverton, NY | 30.4 GWh |
#998 | Apple Data Center PV3 | Conover, NC | 30.3 GWh |
#999 | Hyder II Hybrid | Hyder, AZ | 30.3 GWh |
#1000 | Correctional Solar LLC | Barhamsville, VA | 30.1 GWh |
#1001 | Woodland Solar Farm | Smithfield, VA | 30.0 GWh |
#1002 | Desert Star Hybrid | Buckeye, AZ | 30.0 GWh |
#1003 | Copperhead Solar, LLC | Riesel, TX | 29.7 GWh |
#1005 | RE Adams East, LLC | Fresno, CA | 29.9 GWh |
#1006 | Hollyfield | Manquin, VA | 29.8 GWh |
#1007 | Wister Solar | Niland, CA | 29.7 GWh |
#1008 | Morelos del Sol | Lost Hills, CA | 29.5 GWh |
#1009 | Baker City Solar | Baker City, OR | 29.5 GWh |
#1010 | Lanikuhana Solar LLC | Mililani, HI | 29.5 GWh |
#1011 | Duane Arnold Solar I (50 MW) | Palo, IA | 29.4 GWh |
#1012 | Blackville Solar II | Blackville, SC | 29.4 GWh |
#1013 | Rincon Solar I | Rincon, GA | 29.2 GWh |
#1014 | Wildflower Solar 1 | Elverta, CA | 29.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Tropico Solar PV Plant.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Castle Rock Vineyards | Delano, CA | 1.7 GWh | 3.7 mi |
CED Ducor 1 | Ducor, CA | 47.7 GWh | 1.8 mi |
CED Ducor 2 | Ducor, CA | 47.2 GWh | 1.1 mi |
CED Ducor 3 | Ducor, CA | 36.1 GWh | 0.9 mi |
CED Ducor 4 | Ducor, CA | 46.9 GWh | 2.1 mi |
Delano Energy Center | Delano, CA | 2.9 GWh | 13.7 mi |
Delano Land 1 | Delano, CA | 990.0 MWh | 16.9 mi |
E&B Resources | Bakersfield, CA | 2.3 GWh | 20.5 mi |
Kern Valley SP | Delano, CA | 619.0 MWh | 15.2 mi |
Luciana | Richgrove, CA | 127.7 GWh | 0.7 mi |
Mt Poso Cogeneration | Bakersfield, CA | 267.8 GWh | 17.9 mi |
Nicolis Solar PV Plant | Delano, CA | 43.8 GWh | 0.3 mi |
North Kern State Prison Phase II | Delano, CA | 7.5 GWh | 14.6 mi |
Porterville 6 and 7 | Porterville, CA | 3.2 GWh | 15.2 mi |
Porterville Solar | Porterville, CA | 6.0 GWh | 18.7 mi |
Roll Delano | Delano, CA | 8.9 GWh | 12.2 mi |
Roll Delano 2 | Delano, CA | 7.4 GWh | 12 mi |
Solar Photovoltaic Project #42 | Tulare, CA | 6.9 GWh | 13.6 mi |
Tulare Success Power Project | Porterville, CA | 538.0 MWh | 17.3 mi |
White River Solar 2 | Alpaugh, CA | 49.3 GWh | 3 mi |