Trimble County
487 Corn Creek Road, Bedford, KY 40006Plant Summary Information
Trimble County is ranked #13 out of 129 coal plants nationwide in terms of total annual net electricity generation.
Trimble County is comprised of 8 generators and generated 2.3 TWh during the 3-month period between June 2024 to September 2024.
Plant Name | Trimble County |
---|---|
Utility Name | Louisville Gas & Electric Co |
Location | Trimble County, KY |
Initial Operation Date | December 1990 |
Last Update | Sep 2024 |
Annual Generation | 8.9 TWh |
Annual Consumption | 95.0 M MMBtu |
Ranked #80 out of 11,852 Power Plants Nationwide | |
Ranked #13 out of 129 Bituminous Coal Power Plants Nationwide | |
Ranked #2 out of 54 Kentucky Power Plants | |
Ranked #4 out of 8 Kentucky Bituminous Coal Power Plants | |
Fuel Types | Bituminous Coal : 73.2% Natural Gas : 14.4% Subbituminous Coal : 12.4% |
Map of Trimble County
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Trimble County.
Monthly Net Generation for Trimble County
Trimble County Details
Summary Information | |
---|---|
Plant Name | Trimble County (6071) |
Plant Address | 487 Corn Creek Road, Bedford, KY 40006 |
Utility | Louisville Gas & Electric Co (11249) |
Latitude, Longitude | 38.5847, -85.4117 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | December 1990 |
Annual Generation | 8.9 TWh |
Fuel Types | Bituminous Coal : 73.2% Natural Gas : 14.4% Subbituminous Coal : 12.4% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Louisville Gas and Electric Company and Kentucky Utilities Company (LGEE) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Ohio River |
Ash Impoundment | Yes Lined Operating |
Transmission / Distribution Owner | Louisville Gas & Electric Co (11249) KY |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | WEST TEXAS GAS INC |
Natural Gas Storage | No |
Generator 1 Details Operating December 1990
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Jointly Owned |
Nameplate Capacity | 566.1 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 493 MW |
Winter Capacity | 493 MW |
Minimum Load | 188 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 1990 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
---|---|
Energy Source | Bituminous Coal |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 5 Details Operating May 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Jointly Owned |
Nameplate Capacity | 199 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 159 MW |
Winter Capacity | 179 MW |
Minimum Load | 80 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2002 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 6 Details Operating May 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Jointly Owned |
Nameplate Capacity | 199 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 159 MW |
Winter Capacity | 179 MW |
Minimum Load | 80 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2002 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 7 Details Operating June 2004
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Jointly Owned |
Nameplate Capacity | 199 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 159 MW |
Winter Capacity | 179 MW |
Minimum Load | 80 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2004 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 8 Details Operating June 2004
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Jointly Owned |
Nameplate Capacity | 199 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 159 MW |
Winter Capacity | 179 MW |
Minimum Load | 80 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2004 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 10 Details Operating July 2004
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Jointly Owned |
Nameplate Capacity | 199 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 159 MW |
Winter Capacity | 179 MW |
Minimum Load | 80 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2004 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 9 Details Operating July 2004
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Jointly Owned |
Nameplate Capacity | 199 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 159 MW |
Winter Capacity | 179 MW |
Minimum Load | 80 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2004 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Pulverized Coal Technology | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 2 Details Operating February 2011
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Jointly Owned |
Nameplate Capacity | 834 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 732 MW |
Winter Capacity | 760 MW |
Minimum Load | 420 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 2011 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
---|---|
Energy Source | Bituminous Coal / Subbituminous Coal |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Supercritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | SUB / BIT |
---|
Trimble County Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Indiana Municipal Power Agency | 11610 N College Avenue, Carmel, IN 46032 | Generator 1 | 12.88% |
Illinois Municipal Elec Agency | 3400 Conifer Drive, Springfield, IL 62711 | Generator 1 | 12.12% |
Louisville Gas & Electric Co | 220 W Main Sreet, Louisville, KY 40202 | Generator 1 | 75.00% |
Kentucky Utilities Co | One Quality Street, Lexington, KY 40507 | Generator 10 | 63.00% |
Louisville Gas & Electric Co | 220 W Main Sreet, Louisville, KY 40202 | Generator 10 | 37.00% |
Indiana Municipal Power Agency | 11610 N College Avenue, Carmel, IN 46032 | Generator 2 | 12.88% |
Illinois Municipal Elec Agency | 3400 Conifer Drive, Springfield, IL 62711 | Generator 2 | 12.12% |
Kentucky Utilities Co | One Quality Street, Lexington, KY 40507 | Generator 2 | 60.75% |
Louisville Gas & Electric Co | 220 W Main Sreet, Louisville, KY 40202 | Generator 2 | 14.25% |
Kentucky Utilities Co | One Quality Street, Lexington, KY 40507 | Generator 5 | 71.00% |
Louisville Gas & Electric Co | 220 W Main Sreet, Louisville, KY 40202 | Generator 5 | 29.00% |
Kentucky Utilities Co | One Quality Street, Lexington, KY 40507 | Generator 6 | 71.00% |
Louisville Gas & Electric Co | 220 W Main Sreet, Louisville, KY 40202 | Generator 6 | 29.00% |
Kentucky Utilities Co | One Quality Street, Lexington, KY 40507 | Generator 7 | 63.00% |
Louisville Gas & Electric Co | 220 W Main Sreet, Louisville, KY 40202 | Generator 7 | 37.00% |
Kentucky Utilities Co | One Quality Street, Lexington, KY 40507 | Generator 8 | 63.00% |
Louisville Gas & Electric Co | 220 W Main Sreet, Louisville, KY 40202 | Generator 8 | 37.00% |
Kentucky Utilities Co | One Quality Street, Lexington, KY 40507 | Generator 9 | 63.00% |
Louisville Gas & Electric Co | 220 W Main Sreet, Louisville, KY 40202 | Generator 9 | 37.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Bituminous Coal.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3 | Bowen | Cartersville, GA | 11.2 TWh |
#4 | Ghent | Ghent, KY | 10.0 TWh |
#5 | Gibson | Owensville, IN | 9.9 TWh |
#6 | Cardinal | Brillant, OH | 9.8 TWh |
#7 | Cumberland (TN) | Cumberland City, TN | 9.4 TWh |
#8 | John E Amos | St Albans, WV | 9.1 TWh |
#9 | Cross | Cross, SC | 8.5 TWh |
#10 | Four Corners | Fruitland, NM | 8.0 TWh |
#11 | H L Spurlock | Maysville, KY | 7.8 TWh |
#12 | Mill Creek (KY) | Louisville, KY | 7.2 TWh |
#14 | Roxboro | Semora, NC | 5.9 TWh |
#15 | Mountaineer | New Haven, WV | 5.6 TWh |
#16 | Miami Fort | North Bend, OH | 5.1 TWh |
#17 | Clifty Creek | Madison, IN | 5.1 TWh |
#18 | Cayuga | Cayuga, IN | 4.5 TWh |
#19 | Longview Power Plant | Maidsville, WV | 4.4 TWh |
#20 | Kyger Creek | Cheshire, OH | 4.7 TWh |
#21 | FirstEnergy Fort Martin Power Station | Maidsville, WV | 4.3 TWh |
#22 | Crystal River | Crystal River, FL | 16.3 TWh |
#23 | Intermountain Power Project | Delta, UT | 4.4 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Trimble County.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bavarian LFGTE | Walton, KY | 27.9 GWh | 45 mi |
Bluegrass Generating Station | LaGrange, KY | 36.5 GWh | 13.4 mi |
Cane Run | Louisville, KY | 4.4 TWh | 37.9 mi |
Clifty Creek | Madison, IN | 5.1 TWh | 10.6 mi |
Crittenden Solar Facility | Dry Ridge, KY | 4.5 GWh | 44.6 mi |
East Bend | Union, KY | 2.4 TWh | 37.4 mi |
Ghent | Ghent, KY | 10.0 TWh | 23.3 mi |
Henryville Solar RES | Underwood, IN | 1.7 GWh | 19.8 mi |
Jackson Co. Solar RES | Columbus, IN | 1.6 GWh | 39.3 mi |
Lanesville Solar RES | Lanesville, IN | 1.6 GWh | 37.9 mi |
Lawrenceburg Power, LLC | Lawrenceburg, IN | 8.7 TWh | 45.6 mi |
LGE-KU Solar Share Facility Simpsonville | Simpsonville, KY | 1.0 MWh | 25.5 mi |
Markland | Florence, IN | 394.7 GWh | 27.6 mi |
Miami Fort | North Bend, OH | 5.1 TWh | 49 mi |
Mill Creek (KY) | Louisville, KY | 7.2 TWh | 45.6 mi |
Ohio Falls | Shippingport Island, KY | 272.0 GWh | 28.8 mi |
Paddys Run | Louisville, KY | 83.0 GWh | 34.1 mi |
Scottsburg Solar Park | Scottsburg, IN | 12.3 GWh | 20.9 mi |
Walton 1 Solar Facility | Walton, KY | 2.9 GWh | 47.8 mi |
Walton 2 Solar Facility | Walton, KY | 3.1 GWh | 47.8 mi |