Tracy 210
17880 W Schulte Rd, Tracy, CA 95377Plant Summary Information
Tracy 210 is ranked #174 out of 346 natural gas power plants in California in terms of total annual net electricity generation.
Tracy 210 is comprised of 1 generator and generated 15.9 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Tracy 210 |
---|---|
Utility Name | Costco Wholesale |
Location | San Joaquin County, CA |
Initial Operation Date | March 2019 |
Last Update | Dec 2023 |
Annual Generation | 15.9 GWh |
Annual Consumption | 134.1 k MMBtu |
Ranked #5,327 out of 11,835 Power Plants Nationwide | |
Ranked #1,463 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #748 out of 1,569 California Power Plants | |
Ranked #174 out of 346 California Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Tracy 210
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Tracy 210.
Monthly Net Generation for Tracy 210
Tracy 210 Details
Summary Information | |
---|---|
Plant Name | Tracy 210 (63638) |
Plant Address | 17880 W Schulte Rd, Tracy, CA 95377 |
Utility | Costco Wholesale (58622) |
Latitude, Longitude | 37.72201, -121.53097 |
Generation Dates on File | Mar 2019 to Dec 2023 |
Initial Operation Date | March 2019 |
Annual Generation | 15.9 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Food Manufacturing (311) |
Sector | Industrial Non-CHP (6) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
Grid Voltage | 12.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | PACIFIC GAS |
Generator CTC13 Details Operating March 2019
Technology | Other Natural Gas |
---|---|
Prime Mover | Fuel Cell |
Ownership | Single Owner |
Nameplate Capacity | 2.6 MW |
Summer Capacity | 2.6 MW |
Winter Capacity | 2.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2019 |
Combined Heat & Power | No |
Sector Name | Industrial Non-CHP (6) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Tracy 210 Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1453 | McIntosh | Rincon, GA | 21.1 GWh |
#1454 | Pepperidge Farm Bloomfield | Bloomfield, CT | 16.5 GWh |
#1455 | UI RCP Woodbridge FC | Woodbridge, CT | 16.5 GWh |
#1456 | Kaiser East La Palma Ave. Fuel Cell | Anaheim, CA | 16.4 GWh |
#1457 | Kaiser - Harbor City | Harbor City, CA | 16.4 GWh |
#1458 | Cayuga | Cayuga, IN | 4.5 TWh |
#1459 | GEN005 Antibody Fuel Cell | Oceanside, CA | 16.3 GWh |
#1460 | John W Turk Jr Power Plant | Fulton, AR | 3.0 TWh |
#1461 | POET Biorefining-Hanlontown, LLC | Hanlontown, IA | 16.1 GWh |
#1462 | Nodaway | Conception Junction, MO | 16.0 GWh |
#1464 | Clay Boswell | Cohasset, MN | 4.4 TWh |
#1465 | POET Biorefining Caro, LLC | Caro, MI | 15.9 GWh |
#1466 | Valmont | Boulder, CO | 15.9 GWh |
#1467 | Spreckels Sugar Company | Brawley, CA | 15.8 GWh |
#1468 | US Gypsum Oakfield | Oakfield, NY | 15.8 GWh |
#1469 | Goose Haven Energy Center | Suisun, CA | 15.7 GWh |
#1470 | Craig (CO) | Craig, CO | 5.0 TWh |
#1471 | Sub 12 | Tallahassee, FL | 15.6 GWh |
#1472 | Ray D Nixon | Fountain, CO | 928.6 GWh |
#1473 | Florence Mill | Florence, SC | 409.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Tracy 210.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Altamont Gas Recovery | Livermore, CA | 39.4 GWh | 6.8 mi |
Ameresco Vasco Road | Livermore, CA | 31.5 GWh | 11 mi |
Buena Vista Energy LLC | Byron, CA | 90.9 GWh | 9.4 mi |
Byron Highway Solar | Byron, CA | 12.8 GWh | 9.8 mi |
CSD 2 - Heritage High | Brentwood, CA | 1.9 GWh | 18.5 mi |
Diablo Winds LLC | Livermore, CA | 35.8 GWh | 5.4 mi |
Foundation ST | Tracy, CA | 1.8 GWh | 0.7 mi |
Golden Hills North Wind Energy Center | Livermore, CA | 127.1 GWh | 6.3 mi |
Golden Hills Wind | Livermore, CA | 247.8 GWh | 6 mi |
J.R. Simplot Company | Lathrop, CA | 8.9 GWh | 15 mi |
Mariposa Energy Project | Byron, CA | 92.8 GWh | 6 mi |
Medline Ind. Phase 2 Tracy | Tracy, CA | 2.0 GWh | 1.5 mi |
Prologis L.P | Tracy, CA | 2.7 GWh | 0.2 mi |
Regional Wastewater Control Facility | Stockton, CA | 4.1 GWh | 18.5 mi |
Stockton Biomass | Stockton, CA | 326.3 GWh | 18.8 mi |
Summit Winds | Livermore, CA | 166.5 GWh | 9.1 mi |
Teichert Materials-Teichert Vernalis | San Joaquin, CA | 1.6 GWh | 12 mi |
Tracy Combined Cycle Power Plant | Tracy, CA | 929.6 GWh | 2.3 mi |
Vasco Winds | Livermore, CA | 216.0 GWh | 11.3 mi |
Whitethorn Solar LLC | Livermore, CA | 5.6 GWh | 10.4 mi |