Town of Needham VNEM CSG
1407 Central Avenue, Needham, MA 2192Plant Summary Information
Town of Needham VNEM CSG is ranked #196 out of 487 solar farms in Massachusetts in terms of total annual net electricity generation.
Town of Needham VNEM CSG generated 633.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Town of Needham VNEM CSG |
---|---|
Utility Name | Tesla Inc. |
Location | Norfolk County, MA |
Initial Operation Date | February 2016 |
Last Update | Dec 2023 |
Annual Generation | 4.0 GWh |
Annual Consumption | 14.1 k MMBtu |
Ranked #8,132 out of 11,835 Power Plants Nationwide | |
Ranked #3,122 out of 5,643 Solar Power Plants Nationwide | |
Ranked #279 out of 598 Massachusetts Power Plants | |
Ranked #196 out of 487 Massachusetts Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
SolarCity Corporation (2015 to 2015) Tesla Inc. (2016 to 2023) |
Map of Town of Needham VNEM CSG
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Town of Needham VNEM CSG.
Monthly Net Generation for Town of Needham VNEM CSG
Town of Needham VNEM CSG Details
Summary Information | |
---|---|
Plant Name | Town of Needham VNEM CSG (60110) |
Plant Address | 1407 Central Avenue, Needham, MA 2192 |
Utility | Tesla Inc. (57313) |
Latitude, Longitude | 42.27672, -71.25939 |
Generation Dates on File | Feb 2016 to Dec 2023 |
Initial Operation Date | February 2016 |
Annual Generation | 4.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Eversource (59497) CT |
Grid Voltage | 1.00 kV |
Energy Storage | No |
Generator PV1 Details Operating February 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 3 MW |
Summer Capacity | 3 MW |
Winter Capacity | 3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | February 2016 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 3.6 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | Yes |
Virtual Net Metering DC Capacity | 3.6 MW |
Town of Needham VNEM CSG Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Mound Solar Owner X, LLC | 6800 Dumbarton Circle, Fremont, CA 94555 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3112 | Nautilus Goat Island Solar LLC (CSG) | Burrillville, RI | 4.0 GWh |
#3113 | Lafayette 2 - McHenry Franks 2 | Huntley, IL | 4.0 GWh |
#3114 | Sesqui-C Solar (CSG) | Yamhill, OR | 4.0 GWh |
#3115 | Lenape II | Indianapolis, IN | 4.0 GWh |
#3116 | City of Tulare Water Facility | Tulare, CA | 23.9 GWh |
#3117 | WED Kingstown Solar I - East Array | Washington, RI | 4.0 GWh |
#3118 | Syncarpha Questa | Cerro, NM | 4.0 GWh |
#3119 | Thomas Creek Solar | Molalla, OR | 4.0 GWh |
#3120 | Viper Solar | Rockfish, NC | 4.0 GWh |
#3121 | McLean Homestead | Laurinburg, NC | 4.0 GWh |
#3123 | Kent School Road Solar 1 | Kent, IL | 4.0 GWh |
#3124 | SSD Marion 5, LLC | Woodburn, OR | 4.0 GWh |
#3125 | Gridley Main Two | Gridley, CA | 4.0 GWh |
#3126 | Clay FC | Louisville, IL | 4.0 GWh |
#3127 | Dynamic Corinth (CSG) | Corinth, ME | 4.0 GWh |
#3128 | Rockford CS 1 | Rockford, IL | 4.0 GWh |
#3129 | Rockford Solar | Rockford, IL | 4.0 GWh |
#3130 | Red Prairie Solar | Sheridan, OR | 4.0 GWh |
#3131 | Rockford CSG | Rockford, IL | 4.0 GWh |
#3132 | Cosper Creek Solar (CSG) | Willamina, OR | 4.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Town of Needham VNEM CSG.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Boston Medical Center CHP Plant | Boston, MA | 12.1 GWh | 10.3 mi |
Centaurus Solar - MA | Ashland, MA | 3.8 GWh | 8.7 mi |
DDR Shoppers World | Framingham, MA | 1.3 GWh | 7.2 mi |
Dorchester Solar Site | Dorchester, MA | 181.0 MWh | 11 mi |
Dover | Dover, MA | 1.7 GWh | 3.5 mi |
Dynamic - Walpole | Walpole, MA | 2.8 GWh | 9.9 mi |
Exelon Framingham LLC | Framingham, MA | 792.0 MWh | 7.1 mi |
Framingham State University Plant | Framingham, MA | 72.0 MWh | 9.1 mi |
Holliston LLC | Holliston, MA | 2.0 GWh | 9.1 mi |
Kendall Square Station | Cambridge, MA | 1.6 TWh | 11 mi |
Mass Inst Tech Cntrl Utilities/Cogen Plt | Cambridge, MA | 204.5 GWh | 10.3 mi |
Meadow Solar | Boston, MA | 4.3 GWh | 7.2 mi |
Medical Area Total Energy Plant | Boston, MA | 338.6 GWh | 8.8 mi |
Natick Mall | Natick, MA | 3.2 GWh | 6.6 mi |
Newton Rumford Landfill | Newton, MA | 2.7 GWh | 5.6 mi |
Sudbury Landfill | Sudbury, MA | 1.5 GWh | 8.8 mi |
Town of Norfolk MA at Medway Branch | Norfolk, MA | 1.9 GWh | 11.1 mi |
Walpole Solar 2 | Walpole, MA | 3.6 GWh | 11 mi |
Wellesley College Central Utility Plant | Wellesley, MA | 480.2 MWh | 2.8 mi |
Weston Landfill Solar | Weston, MA | 2.8 GWh | 6.9 mi |