Toms River CSG
227 Oak Ridge Parkway, Toms River, NJ 8755Plant Summary Information
Toms River CSG is ranked #260 out of 314 solar farms in New Jersey in terms of total annual net electricity generation.
Toms River CSG generated 1.4 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Toms River CSG |
---|---|
Utility Name | MN8 Energy LLC |
Location | Ocean County, NJ |
Initial Operation Date | September 2023 |
Last Update | Dec 2023 |
Annual Generation | 1.4 GWh |
Annual Consumption | 4.8 k MMBtu |
Ranked #10,574 out of 11,852 Power Plants Nationwide | |
Ranked #5,219 out of 5,655 Solar Power Plants Nationwide | |
Ranked #323 out of 378 New Jersey Power Plants | |
Ranked #260 out of 314 New Jersey Solar Power Plants | |
Fuel Types | Solar |
Map of Toms River CSG
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Toms River CSG.
Monthly Net Generation for Toms River CSG
Toms River CSG Details
Summary Information | |
---|---|
Plant Name | Toms River CSG (66751) |
Plant Address | 227 Oak Ridge Parkway, Toms River, NJ 8755 |
Utility | MN8 Energy LLC (61944) |
Latitude, Longitude | 39.98752, -74.23644 |
Generation Dates on File | Sep 2023 to Dec 2023 |
Initial Operation Date | September 2023 |
Annual Generation | 1.4 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 23-1178 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Jersey Central Power & Lt Co (9726) NJ |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator GEN1 Details Operating September 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 4 MW |
Summer Capacity | 4 MW |
Winter Capacity | 4 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 4.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | Yes |
Virtual Net Metering DC Capacity | 4.9 MW |
Toms River CSG Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Toms River Net Meter Solar, LLC | 750 Park of Commerce Blvd, Boca Raton, FL 33487 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#5209 | Clovis East High School | Clovis, CA | 1.4 GWh |
#5210 | Plainfield Solar 1 | Plainfield, CT | 1.4 GWh |
#5211 | Owens Corning Headquarters | Toledo, OH | 1.4 GWh |
#5212 | Meridian Vineyards | Paso Robles, CA | 1.4 GWh |
#5213 | Intel Folsom | Folsom, CA | 1.4 GWh |
#5214 | Tompkins Cortland Community College | Dryden, NY | 1.4 GWh |
#5215 | IKEA Oak Creek Rooftop PV System | Oak Creek, WI | 1.4 GWh |
#5216 | Solar Photovoltaic Project #15 | Fontana, CA | 1.4 GWh |
#5217 | Irwindale Brew Yard, LLC | Irwindale, CA | 1.4 GWh |
#5218 | Shirley Landfill | Shirley, MA | 1.4 GWh |
#5220 | Parking Lot Array | Cincinnati, OH | 1.4 GWh |
#5221 | Tioga Solar Morris County 1 LLC | Morristown, NJ | 1.4 GWh |
#5222 | Malone Solar Site | Malone, NY | 1.4 GWh |
#5223 | IKEA Las Vegas 462 | Las Vegas, NV | 1.4 GWh |
#5224 | Renewable Energy Center at BJH | St Louis, MO | 1.4 GWh |
#5225 | AC Criminal Courts Complex SPE2, LLC | Mays Landing, NJ | 1.4 GWh |
#5226 | Kearsarge Upper Union | Franklin, MA | 1.3 GWh |
#5227 | Manchester Community College East | Manchester, CT | 1.4 GWh |
#5228 | Holliston Solar CSG | Holliston, MA | 1.4 GWh |
#5229 | Port Reading 8 Solar | Carteret, NJ | 1.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Toms River CSG.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bayville Central Facility | Bayville, NJ | 2.9 GWh | 6.2 mi |
Brickyard Solar | Farmingdale, NJ | 1.8 GWh | 14.6 mi |
EDF Ph1 Toms River | Tom's River, NJ | 34.8 GWh | 0.3 mi |
Forked River | Forked River, NJ | 2.1 GWh | 12 mi |
French's Landfill PV | Brick, NJ | 5.0 GWh | 10.1 mi |
Galloway Landfill | Wall, NJ | 4.5 GWh | 17 mi |
Howell Solar | Howell, NJ | 9.8 GWh | 11.6 mi |
Jackson Board of Education-Liberty HS | Jackson, NJ | 1.7 GWh | 7.4 mi |
Jackson Legler Solar 1 LLC | Jackson Township, NJ | 4.7 GWh | 8 mi |
KDC Solar PR1, LLC | Jackson, NJ | 27.0 GWh | 14.9 mi |
Lakehurst Solar | Lakehurst, NJ | 15.9 GWh | 4.7 mi |
Lakewood Cheddar School | Lakewood, NJ | 751.0 MWh | 6.5 mi |
NAEA Lakewood LLC | Lakewood, NJ | 245.5 GWh | 6.2 mi |
NAEA Ocean Peaking Power LLC | Lakewood, NJ | 232.6 GWh | 6.4 mi |
NES Rutgers Solar | Lakewood, NJ | 583.0 MWh | 7 mi |
Ocean County Landfill | Manchester, NJ | 77.9 GWh | 2.7 mi |
Rock Solid | Howell, NJ | 12.8 GWh | 16.7 mi |
Spano Solar - Belmar Wall | Belmar, NJ | 2.6 GWh | 14.9 mi |
Spano Solar - Ocean County Landfill - CS | Manchester Township, NJ | 4.5 GWh | 2.7 mi |
Tom's River (Lowes) | Toms River, NJ | 1.2 GWh | 3.4 mi |