Tom G Smith
117 College Avenue, Lake Worth, FL 33460Plant Summary Information
Tom G Smith is ranked #81 out of 85 natural gas power plants in Florida in terms of total annual net electricity generation.
Tom G Smith is comprised of 9 generators and generated -106.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Tom G Smith |
---|---|
Utility Name | City of Lake Worth Beach - (FL) |
Location | Palm Beach County, FL |
Initial Operation Date | December 1965 |
Last Update | Dec 2023 |
Annual Generation | 444.0 MWh |
Annual Consumption | 14.6 k MMBtu |
Ranked #11,074 out of 11,852 Power Plants Nationwide | |
Ranked #1,952 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #276 out of 279 Florida Power Plants | |
Ranked #81 out of 85 Florida Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Previous Operator |
City of Lake Worth - (FL) (2013 to 2020) City of Lake Worth Beach - (FL) (2021 to 2023) |
Map of Tom G Smith
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Tom G Smith.
Monthly Net Generation for Tom G Smith
Tom G Smith Details
Summary Information | |
---|---|
Plant Name | Tom G Smith (673) |
Plant Address | 117 College Avenue, Lake Worth, FL 33460 |
Utility | City of Lake Worth Beach - (FL) (10620) |
Latitude, Longitude | 26.61277, -80.0677 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | December 1965 |
Annual Generation | 444.0 MWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Florida Municipal Power Pool (FMPP) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Municipality |
Ash Impoundment | No |
Transmission / Distribution Owner | City of Lake Worth - (FL) (10620) FL |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | FLORIDA GAS TRANSMISSION COMPANY |
Natural Gas Storage | No |
Generator MU1 Details Standby December 1965
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Minimum Load | 1.8 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
First Operation Date | December 1965 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator MU2 Details Standby December 1965
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Minimum Load | 1.6 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
First Operation Date | December 1965 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator MU3 Details Operating December 1965
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Minimum Load | 1.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 1965 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator MU4 Details Standby December 1965
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Minimum Load | 1.6 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
First Operation Date | December 1965 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator MU5 Details Standby December 1965
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Minimum Load | 1.6 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
First Operation Date | December 1965 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator S3 Details Operating November 1967
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 26.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 26.5 MW |
Winter Capacity | 26.5 MW |
Minimum Load | 8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 1967 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GT1 Details Operating December 1976
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 30.8 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 26 MW |
Winter Capacity | 31 MW |
Minimum Load | 8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 1976 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Subcritical Technology | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GT2 Details Operating March 1978
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | Yes |
Nameplate Capacity | 21.4 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 21 MW |
Winter Capacity | 23 MW |
Minimum Load | 16 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 1978 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 21 MW |
Net Winter Capacity With Natural Gas | 23 MW |
Net Summer Capacity With Oil | 21 MW |
Net Winter Capacity With Oil | 23 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | No |
Generator S5 Details Operating March 1978
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC1 |
Ownership | Single Owner |
Duct Burners | No |
Nameplate Capacity | 10 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 10 MW |
Winter Capacity | 10 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 1978 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Tom G Smith Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1942 | Shoemaker | Middletown, NY | 563.0 MWh |
#1943 | Dover | Dover, OH | 78.0 GWh |
#1944 | Encina Water Pollution Control | Carlsbad, CA | 14.2 GWh |
#1945 | J C McNeil | Burlington, VT | 179.9 GWh |
#1946 | Lodi | Lodi, CA | 546.0 MWh |
#1947 | Covanta Lake County Energy | Okahumpka, FL | 82.7 GWh |
#1948 | Cushing | Cushing, OK | 575.0 MWh |
#1949 | Poplar Bluff Generating Station | Poplar Bluff, MO | 579.0 MWh |
#1950 | Transamerica Pyramid | San Francisco, CA | 525.0 MWh |
#1951 | West Coxsackie | Coxsackie, NY | 521.0 MWh |
#1953 | Wellesley College Central Utility Plant | Wellesley, MA | 480.2 MWh |
#1954 | HEB00092 | Victoria, TX | 473.0 MWh |
#1955 | Northwest Community Hospital | Arlington Heights, IL | 467.0 MWh |
#1956 | Seadrift Coke LP | Port Lavaca, TX | 18.7 GWh |
#1957 | Hopewell Cogeneration NJ | Pennington, NJ | 433.0 MWh |
#1958 | Harbec Energy | Ontario, NY | 977.0 MWh |
#1959 | HEB00095 | Laredo, TX | 432.0 MWh |
#1960 | Stony Brook | Ludlow, MA | 25.0 GWh |
#1961 | HEB00063 | Pearland, TX | 429.0 MWh |
#1962 | St Clair | East China Twp, MI | 290.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Tom G Smith.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
CSL Gas Recovery | Pompano Beach, FL | 40.0 GWh | 23.3 mi |
Dania Beach 7 | Ft. Lauderdale, FL | 6.6 TWh | 38.5 mi |
Hibiscus Solar Energy Center | Westlake, FL | 145.9 GWh | 17.9 mi |
Lauderdale | Ft. Lauderdale, FL | 262.3 GWh | 38.5 mi |
Loggerhead Solar Energy Center | Port St. Lucie, FL | 133.7 GWh | 52.1 mi |
Martin | Indiantown, FL | 7.4 TWh | 43.1 mi |
Monarch | TBD, FL | 111.1 GWh | 40.4 mi |
Okeelanta Cogeneration | South Bay, FL | 40.5 GWh | 42 mi |
Palm Beach Renewable Energy Facility 1 | West Palm Beach, FL | 319.5 GWh | 11.9 mi |
Palm Beach Renewable Energy Facility 2 | West Palm Beach, FL | 530.6 GWh | 11.9 mi |
Pembroke Lakes Mall | Pembroke Pines, FL | 596.0 MWh | 44.1 mi |
Port Everglades | Ft. Lauderdale, FL | 5.2 TWh | 36.6 mi |
Riviera | Riviera Beach, FL | 7.6 TWh | 10.6 mi |
Sabal Palm Solar Center | Loxahatchee, FL | 153.1 GWh | 21.1 mi |
Silver Palm | TBD, FL | 126.0 GWh | 21.3 mi |
St Lucie | Jensen Beach, FL | 15.0 TWh | 52 mi |
Sweetbay Solar Center | North of Indiantown, FL | 117.7 GWh | 39.8 mi |
West County Energy Center | Loxahatchee, FL | 21.0 TWh | 19.9 mi |
Wheelabrator South Broward | Ft. Lauderdale, FL | 414.3 GWh | 38.5 mi |
White Tail | TBD, FL | 135.2 GWh | 37.4 mi |