Thundermist Hydro
118 South Main St, Providence, RI 2895Plant Summary Information
Thundermist Hydro is ranked #2 out of 2 hydroelectric power plants in Rhode Island in terms of total annual net electricity generation.
Thundermist Hydro is comprised of 1 generator and generated 90.0 MWh during the 3-month period between September 2024 to December 2024.
Plant Name | Thundermist Hydro |
---|---|
Utility Name | City of Woonsocket |
Location | Providence County, RI |
Initial Operation Date | June 1981 |
Last Update | Dec 2024 |
Annual Generation | 90.0 MWh |
Annual Consumption | 307 MMBtu |
Ranked #11,926 out of 12,312 Power Plants Nationwide | |
Ranked #1,318 out of 1,323 Water Power Plants Nationwide | |
Ranked #94 out of 96 Rhode Island Power Plants | |
Ranked #2 out of 2 Rhode Island Water Power Plants | |
Fuel Types | Water |
Previous Operator |
Woonsocket City of (2013 to 2021) City of Woonsocket (2022 to 2024) |
Map of Thundermist Hydro
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Thundermist Hydro.
Monthly Net Generation for Thundermist Hydro
Thundermist Hydro Details
Summary Information | |
---|---|
Plant Name | Thundermist Hydro (54688) |
Plant Address | 118 South Main St, Providence, RI 2895 |
Utility | City of Woonsocket (42890) |
Latitude, Longitude | 41.99897, -71.51743 |
Generation Dates on File | Jan 2022 to Dec 2024 |
Initial Operation Date | June 1981 |
Annual Generation | 90.0 MWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 09-85-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Blackstone River |
Ash Impoundment | |
Transmission / Distribution Owner | The Narragansett Electric Co (13214) RI |
Grid Voltage | 13.80 kV |
Energy Storage | No |
Generator HYD1 Details Operating June 1981
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 1.2 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1.1 MW |
Winter Capacity | 1.1 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 1981 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Thundermist Hydro Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1303 | W K Sanders | Hyde Park, VT | 548.0 MWh |
#1304 | Niangua | Camdenton, MO | 542.0 MWh |
#1305 | Rocky Brook Hydroelectric | Brinnon, WA | 540.0 MWh |
#1306 | Manti Upper | Manti, UT | 464.0 MWh |
#1307 | Squa Pan Hydro Station | Masardis, ME | 426.0 MWh |
#1308 | Prospect 4 | Prospect, OR | 417.0 MWh |
#1309 | Kearney | Kearney, NE | 416.0 MWh |
#1310 | Barron | Barron, WI | 342.0 MWh |
#1311 | Kings River Syphon | Sanger, CA | 325.0 MWh |
#1312 | Thief River Falls | Thief River Falls, MN | 285.0 MWh |
#1313 | Bartholomew | Springville, UT | 271.0 MWh |
#1314 | Lanesboro | Lanesboro, MN | 184.0 MWh |
#1315 | Cadys Falls | Morrisville, VT | 139.0 MWh |
#1316 | Georgia-Pacific Big Island | Big Island, VA | 53.0 GWh |
#1317 | Springville Hydroelectric | Camarillo, CA | 98.0 MWh |
#1319 | Ball Mountain Hydro | Jamaica, VT | 61.0 MWh |
#1320 | St Louis | St. Louis, MI | 29.0 MWh |
#1321 | Argyle | Argyle, WI | 24.0 MWh |
#1322 | Moccasin Low Head Hydro Project | Moccasin, CA | 4.0 MWh |
#1323 | Spalding | Spalding, NE | 4.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Thundermist Hydro.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
ANP Blackstone Energy Project | Blackstone, MA | 2.4 TWh | 4.2 mi |
BJ's Wholesale Club, Inc- Uxbridge | Uxbridge, MA | 270.0 MWh | 4.7 mi |
Blackstone/Tupperware | North Smithfield, RI | 2.5 GWh | 1.8 mi |
Brookside | North Smithfield, RI | 1.6 GWh | 3.5 mi |
Douglas Pike Solar, LLC | Burrillville, RI | 2.3 GWh | 5.2 mi |
GDIM 1, LLC | North Smithfield, RI | 14.2 GWh | 2.3 mi |
GDIM 2, LLC | North Smithfield, RI | 12.6 GWh | 2.2 mi |
GDIM 3, LLC | North Smithfield, RI | 14.7 GWh | 2.5 mi |
GDIM 4, LLC | North Smithfield, RI | 14.2 GWh | 2.5 mi |
Hurteau Solar Project Hybrid | Uxbridge, MA | 3.0 GWh | 4.2 mi |
Kearsarge Bellingham PV | Bellingham, MA | 4.8 GWh | 5.8 mi |
Kearsarge Smithfield LLC | Burrillville, RI | 13.8 GWh | 5.6 mi |
Kearsarge William Way | Bellingham, MA | 7.4 GWh | 5.9 mi |
MA Blackstone | Blackstone, MA | 3.7 GWh | 2 mi |
North Smithfield Solar Power 1 | North Smithfield, RI | 919.0 MWh | 3.9 mi |
Palombo B Solar, LLC CSG | Uxbridge, MA | 1.6 GWh | 4.5 mi |
Palombo Solar, LLC CSG | Uxbridge, MA | 3.4 GWh | 4.6 mi |
Smithfield Solar Farm, LLC | Smithfield, RI | 4.4 GWh | 5.3 mi |
TPE King Solar Holdings1, LLC (CSG) | North Smithfield, RI | 18.1 GWh | 3.6 mi |
WED GW Solar, LLC | Lincoln, RI | 4.4 GWh | 4.5 mi |